Thetenders.com
  +91 92760 83333 / +91 92743 15555
  • Indian Tenders
  • |
  • Global Tenders
  • |
  • Projects
  • |
  • Tender Awarded
  • |
  • Sub-Contractor
  • Pay Online
  • Register now
  • Login
  • Indian Tenders Tender information of India
  • Global Tenders International Tender information
  • Projects Project information of India
  • Tender Awarded Tender awarded information
  • Sub-Contractor Vendor information of India
  • Pay Online
  • Register now
  • Login
  • Contact Info All India : 9276083333 / 9274315555 South India : 9274315555
TheTenders
»
Indian Tenders
»
Agency Tenders
»
Rajya-Krishi-Utpadan-Mandi-Parishad
Filters
  • » By Keywords
  • » By Cities
  • » By States
  • » By Agencies
  • » By Sectors
  • » By Ownerships
  • Tender Value

List of rajya-krishi-utpadan-mandi-parishad Tenders - RKUMP Tenders

List of latest rajya-krishi-utpadan-mandi-parishad Tenders - RKUMP Tenders in Indian Tenders. Click on any rajya-krishi-utpadan-mandi-parishad Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for rajya-krishi-utpadan-mandi-parishad Tenders.

Advance Search
  • All-Tenders (25)
  • |
  • Today's-Tenders
  • |
  • Active-Tenders
  • |
  • Closed-Tenders
1 Agriculture
image image
Government Departments
TRN :49053424 |  21 May, 2025
Tender Value : 37.71 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road haitapatti road to gram kotari hote hue gulalpur sasho marg marg tak construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
2 Agriculture
image image
Government Departments
TRN :49053488 |  21 May, 2025
Tender Value : 22.12 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road chamanganj durwasa road to gram sabha saraiduddinpur tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
3 Agriculture
image image
Government Departments
TRN :49053774 |  21 May, 2025
Tender Value : 21.58 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road narai road to hanuman mandir hote hue gram sabha tardih tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
4 Agriculture
image image
Government Departments
TRN :49054283 |  21 May, 2025
Tender Value : 20.06 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road phulpur hanumanganj road to gram puresudee hote hue phulpur saidabad road tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
5 Agriculture
image image
Government Departments
TRN :49058444 |  21 May, 2025
Tender Value : 36.43 Lacs
 Fatehpur - Uttar Pradesh
Tender for tender for link road kulli kachra road to bhikampur gram tak road construction work
  • View Tender
  • Document
  • Bid Support
6 Agriculture
image image
Government Departments
TRN :49059548 |  21 May, 2025
Tender Value : 38.53 Lacs
 Fatehpur - Uttar Pradesh
Tender for tender for link road kakharu kot road to rosanpur majre bara gram tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 6 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 7 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 8 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 9 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 10 s/f of 350 mm dia hume pipe 11 s/f of reflectivesign board,etc 12 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 13 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 14 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 15 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 16 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 %
  • View Tender
  • Document
  • Bid Support
7 Agriculture
image image
Government Departments
TRN :49063212 |  17 May, 2025
Tender Value : 42.23 Lacs
 Bisalpur - Uttar Pradesh
Tender for repair/maintenance of link road bareilly bisalpur road se madra suman mode se gram chutkuna tak under mandi samiti bisalpur length 1.00 km
  • View Tender
  • Document
  • Bid Support
8 Agriculture
image image
Government Departments
TRN :49063219 |  17 May, 2025
Tender Value : 95.48 Lacs
 Bareilly - Uttar Pradesh
Tender for repair/maintenance of link road quladiya se rukampur under mandi samiti bareilly length 5.00 km
  • View Tender
  • Document
  • Bid Support
9 Agriculture
image image
Government Departments
TRN :49063270 |  17 May, 2025
Tender Value : 44.57 Lacs
 Dataganj - Uttar Pradesh
Tender for tender for repair/maintenance of link road papad to paliya tak under mandi samiti dataganj length 1.51 km - repair/maintenance of link road papad to paliya tak under mandi samiti dataganj.
  • View Tender
  • Document
  • Bid Support
10 Agriculture
image image
Government Departments
TRN :49063932 |  17 May, 2025
Tender Value : 41.50 Lacs
 Bareilly - Uttar Pradesh
Tender for corrigendum:- e-tender for repair (under pothole clearance scheme) works of link roads, manthi committee of shahjahanpur district under the area of ??shahjahanpur. for repair work on the route vikrampur chakora till chamrua via barora.
  • View Tender
  • Document
  • Bid Support
  • 1
  • 2
  • 3
  • Tenders Expired In - 2025
  • Tenders Expired In - 2024
  • Tenders Expired In - 2023
  • Tenders Expired In - 2022
  • Tenders Expired In - 2021
  • Tenders Expired In - 2020
  • Tenders Expired In - 2019
  • Tenders Expired In - 2018
  • Tenders Expired In - 2017
  • Tenders Expired In - 2016
  • Tenders Expired In - 2015
Other Agencies
  • Haryana State Agricultural Marketing Board Tenders ,
  • Nandankhanan Zoological Park Tenders ,
  • Department Of Agriculture And Cooperation Tenders ,
  • Directorate Of Horticulture Tenders ,
  • Bazpur Cooperative Suger Factory Limited Tenders ,
  • The Odisha Consumers Cooperative Federation Ltd Tenders ,
  • Chaudhary Charan Singh Haryana Agricultural University Tenders ,
  • Agricultural Produce Market Committee Tenders ,
  • Department Of Fisheries And Oceans Tenders ,
  • Department Of Agriculture And Farmers Welfare Tenders

Get Rajya Krishi Utpadan Mandi Parishad Tender Alert...

093492

Other Agencies

  • Impex Ferro Tech Limited Tenders
  • V S S Medical College Tenders
  • Madhya Pradesh Housing And Infrastructure Development Board. Tenders
  • Bureau Of Police Research And Development Tenders
  • University Of Social Sciences Tenders
  • Alex Green Energy Private Limited Tenders
  • Kerala State Warehousing Corporation Container Tenders
  • Madhya Pradesh Hasthshilp Evam Hathkargha Vikas Nigam Limited Tenders
  • Rajkot Municipal Corporation Tenders
  • Abdul Nasir Sab Rajya Grameena Samste Tenders

Read More


Tender Document

355712

State Tenders »

  • Maharashtra Tenders
  • Delhi Tenders
  • West Bengal Tenders
  • Tamil Nadu Tenders
  • Andhra Pradesh Tenders

City Tenders »

  • Hyderabad Tenders
  • Visakhapatnam Tenders
  • Guwahati Tenders
  • Patna Tenders
  • Chandigarh Ut Tenders

Keyword Tenders »

  • False Flooring Tenders
  • Zone Work Tenders
  • Ceiling Tenders
  • Drilling Work Tenders
  • Infrastructural Works Tenders

Sector Tenders »

  • Drugs And Pharmaceuticals Tenders
  • Survey Work Tenders
  • Shipping Transport Tenders
  • Scientific Research And Instruments Tenders
  • Security Services Tenders

Ownership Tenders »

  • Central Government And Public Sector Tenders
  • Co Operative Tenders
  • Corporations And Associations And Others Tenders
  • Private Sector Tenders
  • State Government Tenders

Indian Segment

  • State Tenders
  • City Tenders
  • Industry Tenders
  • SubIndustry Tenders
  • Sector Tenders
  • Ownership Tenders
  • Agency Tenders
  • Keyword Tenders
  • Source of Tenders

Browse Tenders

  • RFP-RFQ Tenders
  • Vender Registration Tenders
  • ICB Tenders
  • NCB Tenders
  • Auction Tenders
  • Corrigendum Tenders
  • E Procurement Tenders
  • GeM Tenders (Registration)

Global Segment

  • Middle East Countries Tenders
  • European Countries Tenders
  • African Countries Tenders
  • Asian Countries Tenders
  • Saar Countries Tenders
  • Australia Oceania Countries Tenders
  • South America Countries Tenders
  • North America Countries Tenders

Others

  • Services
  • Sitemap
  • About Us
  • Contact Us
  • Career
  • Tender Consultants

Get in touch with us

  • +91-92760 83333 (In India)
    +91-92743 15555 (South India)

  • sales@thetenders.com / ceo@thetenders.com

W B


Copyright ©2018 - Thetenders.com. Read Policies

Download Mobile App