Thetenders.com
  +91 92760 83333 / +91 92743 15555
  • Indian Tenders
  • |
  • Global Tenders
  • |
  • Projects
  • |
  • Tender Awarded
  • |
  • Sub-Contractor
  • Pay Online
  • Register now
  • Login
  • Indian Tenders Tender information of India
  • Global Tenders International Tender information
  • Projects Project information of India
  • Tender Awarded Tender awarded information
  • Sub-Contractor Vendor information of India
  • Pay Online
  • Register now
  • Login
  • Contact Info All India : 9276083333 / 9274315555 South India : 9274315555
TheTenders
»
Indian Tenders
»
Keyword Tenders
»
Earthen Embankment
Filters
  • » By Keywords
  • » By Cities
  • » By States
  • » By Agencies
  • » By Sectors
  • » By Ownerships
  • Tender Value

List of earthen-embankment Tenders

List of latest earthen-embankment Tenders in Indian Tenders. Click on any earthen-embankment Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for earthen-embankment Tenders.

Advance Search
  • All-Tenders (12)
  • |
  • Today's-Tenders
  • |
  • Active-Tenders
  • |
  • Closed-Tenders
1 Agriculture
image image
Government Departments
TRN :49053424 |  21 May, 2025
Tender Value : 37.71 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road haitapatti road to gram kotari hote hue gulalpur sasho marg marg tak construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
2 Agriculture
image image
Government Departments
TRN :49053488 |  21 May, 2025
Tender Value : 22.12 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road chamanganj durwasa road to gram sabha saraiduddinpur tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
3 Agriculture
image image
Government Departments
TRN :49053774 |  21 May, 2025
Tender Value : 21.58 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road narai road to hanuman mandir hote hue gram sabha tardih tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
4 Agriculture
image image
Government Departments
TRN :49054283 |  21 May, 2025
Tender Value : 20.06 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road phulpur hanumanganj road to gram puresudee hote hue phulpur saidabad road tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
5 Agriculture
image image
Government Departments
TRN :49059548 |  21 May, 2025
Tender Value : 38.53 Lacs
 Fatehpur - Uttar Pradesh
Tender for tender for link road kakharu kot road to rosanpur majre bara gram tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 6 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 7 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 8 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 9 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 10 s/f of 350 mm dia hume pipe 11 s/f of reflectivesign board,etc 12 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 13 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 14 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 15 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 16 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 %
  • View Tender
  • Document
  • Bid Support
6 Civil Work
image image
State Government
TRN :49023008 |  15 May, 2025
Tender Value : 97.85 Lacs
 Gautam Buddha Nagar - Uttar Pradesh
Tender for tender for landscaping of park p-1 sector -28 with two year maintenance yeida. wc-h - clearing grass and removal of the rubbish up to a distance of 50 m out side the periphery of the area cleared. 2 ploughing the existing ground to a depth of 15cm to 25cm and watering the same . 3 rough dressing the trenched ground including breaking clods. 4 uprooting weeds from the trenched area after 10 to 15days of its foolding with water including disposal of uprooted vegetation. 5 fine dressing of the ground. 6 digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ration of 2:1 by volume ( part of stacked volume of earth afte reduction by 20% : 1 part of stacked volume of manure after reduction by 8% ) follding with water dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) 7 holes 60cm dia, and 60cm deep 8 holes 45cm dia and 45cm deep 9 supplying of chlorpyriphos 20% e.c/ lindane 20% e.c for anti termite treatment of plants @ 2ml./plant and in the interval 1 month up to one year i.e, 12 times in a year hence it comes 24ml/plant or 0.024ltr/plant. 10 supply and stacking of well decayed cattle manure at site including roylty and carriagge up to 5km lead complete. ( cattle manure measured in stacks will reduced by 8% for payment) 11 spreading sludge dump manure and/ or good earth in required thickness as per direction of officer in charge ( cost of sludge, dump manure and/ or directed by the officer in charge. 12 mixing earth and sludge or manure in the required proportion specified or directed by the officer in charge. 13 supply and stacking of selection no. 1/doob grass at site fresh & free from weeds having proper roots in green including loading, unloading carriage and all taxes paid etc. and as per direction of officer in charge. 14 grassing with selection no. 1/ doob grasss including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed ( the grass and good earth shal be paid for separately). 15 preparation of beds for hedging and shurbbery by excavation 60 cm deep and trenching the excavated base to a further depth of 30cm, fefilling the excavated earth after breaking clods and mixing with sludge or mnaure in the ratio of 8:1 (part of stacked volume of earth after reductin by 20% : one part of stacked volume of sludge or manure after reduction by 8% ), flooding with water, filling with earth if necessary watering ad finally fine dressing, leveling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and leveling as derected within a lead of 50m lift up to 1.5m complete (cost of sludge, manure or extra a lead of 50m, lift up to 1.5m complete (cost of sludge, manure or extra earth to be paid for separately) 16 providing and stacking of duranta golden having ht. 15 to 20cm bushty shape with fresh and healthy leaves in 15cm size of earthen pot/plastic pot & as per direction of the officer in charge. (dsr-18, 6.12pg. no.153) 17 providing and stacking of fucus panda golden of height 45-60cm with 6-7 branches and healthy foliage in p.bag of size 25cm as per direction of the officer in charge. (dsr-18, 8.27pg. no.175) 18 supply of gypsm well packed at site in bags. 19 supply of dap at site in printed plasic bags. (market rate.) 20 supply & planting of plants common varieties as required by engineering incharge in 5 kg poly bags or earthen pots ( not below than 8-10 ) well branched and fully foliage branching dia 0.75 to 1.00mtr. free from disease at site i/c stacking with bamboos(chakresia, site ashok, kusum, gulmohar, amaltash) 21 providing and displaying ficus retusa topiary wall developed with fresh and healthy 5 to 6 big ball spedific size and shape 180 cm to 210cm g in 40cm cement potas per direction of the officer in charge (dsr-18, 5.24 pg. no. 145) 22 providing and stacking of bottle palm of ht. 270-300cm bottom girth 30-35cm well developed in big hdpe bags 23 supply & planting of shrubs plants height 2-2.5 feet as required by engineering incharge in 6x8 polythene bags or earthen pot fully foliage and well branched free from disease. shrubs (himalia, chandni ticomaor as direction by e/i etc.) 24 providing and displaying furcaria variegated hybrid well developed with fresh and healthy foliage 20cm and above atractive leaves in 35cm cement potas per direction of the officer in charge (dsr-18, 5.31pg. no. 147) 25 providing and stacking of alternanthera species of height 15cm to 20cm full of brnaches and foliages in 15cm size of earthen pot/plastic pot & as per direction of the officer in charge. (dsr-18, 6.20pg. no. 153) 26 providing and stacking of lpomea (golden leaves) with fresh and healthy leaves in 15cm size of earthen pot/plastic pot & as per direction of the officer in charge. 27 providing and stacking of syngonium (butterfly) variegated with 2-3 suckers healthy foliage in earthen pot/plastic pot as per direction of the officer in charge.(dsr-18, 6.15pg. no.153) 28 providing and stacking of wedelia trilobata, full of leaves in 15cm size of poly bags & as per direction of the officer in charge.(dsr-18, 6.26pg. no.153) 29 providing and stacking of pinus longifolia (pinus) of height 90-105cm in cement pot of size 35cm as per direction of the officer in charge (dsr-18, 7.65 pg. no.165) 30 earth work in excavation by mechanical means (hydraulic excavator) manual means in foundation trenches or drains ( not exceeding 1.5m in width or 10sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50mall kinds of soil 31 providing laying, jointing and testing of pvc(finolex make ring fit) of following dia 6kh/cm2 including all specials & fittings etc. as required for proper completion of work (the contractor has to arrange the source of water and require head for testing). (ar/yeida). 32 providing and fixing of hydrant with gate valve and all the fittings etc. complete. 32mm dia 33 complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hergs, edge, flower beds, foliages, creepers etc. including hoeing, weeding, purning, replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers ( whenever required) top dressing of lawn with good earth and manure and maintenance of other garden related works as directed by office in charge ( cost of good earth, manure , fertilizer, insecticide pesticide will be provided by the department & lawn mover and brush cutter with fuel and other t & p material / articles shall be provided by the contractor.) and as per direction of officer in charge. 34 play grounds/public parks ( mali for 2.00acre.) 35 boring of tubewell with: supplying assembling, lowering and fixing in vertical position in bore well, unplasticized pvc medium well casing (cm) pipe of required dia, conforming to is: 12818 , including required hire and labour charges, fittings & accessories etc. all complete for all depths, as per direction of engineer in charge. 36 providing profuse watering arrangement for lawn/park at site to make avialable for irrigation i.e. diesel engien & oil etc, rh pipe/ canvas pip & other t&p etc. in the proces of watering submerisible pump & accessories as per direction of officer in charge of work. 37 preparation of mounds of various size and shape by available excavated/supplied earth in layers not exceeding 20cm in depth breaking clods, watering of each layer dressing etc, lead upto 50mtr and lift upto 1.5m complete as per direction of officer in charge. 38 supply ofgood earth work , banking excavaated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with 1/2 tonnes roller or wooden or steel rammerand dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, all leads as per(a.r. )for all kind of soil. 39 plantation of seasonal two times on road side (0.45mtrwide bed) including making of bedas direction of engineer in charge complete item. 40 providing of seasonal seedlings including supply of seasonal seedling labour etc complete. 41 m/o seasonal/hedge of ground cover park including weeding hoeing and puring cutting in required shape etc. of ground bed complete itemand watering of seasoanl flowersincluding source of water pol etc. complete. 42 chair bench: supply of rcc chair bench with back rest of size 1500mm width x 1000mm height. reinforced suitably to promote long use and to prevent damage during handling, transportation, & erection. manufactured by using m-30 grade of concrete. 43 supply and fixing of dustbin set of 3capacity-80 ltr size -400x400 top , 300x 300 botto,, 900mm ht. stand made up of isi marked sq , pipe of 35mm x 35mm x 18 gauge power coated size-4.5’ x 1.5’ x 750mm(all complete) (as approved by e&i) 44 providing and laying in position cement concrete of specified grade excluding grade excluding the cost of centering and shuttering all work up to plinth level 1:2:4 corse sand 20 mm stone aggregate (sor based on dar 18 / 4.1.13)
  • View Tender
  • Document
  • Bid Support
7 Agriculture
image image
Government Departments
TRN :49024029 |  21 May, 2025
Tender Value : 30.30 Lacs
 Pratapgarh - Uttar Pradesh
Tender for tender for link road chamir saraiya se pure rammu tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
8 Agriculture
image image
Government Departments
TRN :49024051 |  21 May, 2025
Tender Value : 80.09 Lacs
 Allahabad - Uttar Pradesh
Tender for tender for link road kithawar market to basti hote hue primary school tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 6 excavation in foundation in ordinary soil 7 concrete in 1:6:12 in foundation 8 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 9 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 10 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 11 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 12 s/f of 350 mm dia hume pipe 13 s/f of reflectivesign board,etc 14 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 15 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 16 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 17 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 %
  • View Tender
  • Document
  • Bid Support
9 Agriculture
image image
Government Departments
TRN :49024100 |  21 May, 2025
Tender Value : 48.96 Lacs
 Pratapgarh - Uttar Pradesh
Tender for tender for link road sadwa chandika ke gram sabha chatarpur khanderi to raghna hote hue mishran tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 6 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 7 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 8 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 9 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 10 s/f of 350 mm dia hume pipe 11 s/f of reflectivesign board,etc 12 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 13 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 14 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 15 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 16 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 %
  • View Tender
  • Document
  • Bid Support
10 Canal/Irrigation/Dam Work
image image
State Government
TRN :48865643 |  13 May, 2025
Tender Value : 24.28 Crore
 Bicholim - Goa
Tender for construction of earthen flood protection embankment for sal village in bicholim taluka
  • View Tender
  • Document
  • Bid Support
  • 1
  • 2
  • Tenders Expired In - 2025
  • Tenders Expired In - 2024
  • Tenders Expired In - 2023
  • Tenders Expired In - 2022
  • Tenders Expired In - 2021
  • Tenders Expired In - 2020
  • Tenders Expired In - 2019
  • Tenders Expired In - 2018
  • Tenders Expired In - 2017
  • Tenders Expired In - 2016
  • Tenders Expired In - 2015
Related Searched Keywords : earthen embankment
  • Water Fall Repair Tenders ,
  • Embankment Repair Tenders ,
  • Water Course Repair Tenders ,
  • Intake Channel Tenders ,
  • Canal Structure Work Tenders ,
  • Canal Bank Tenders ,
  • Bank Protection Work Tenders ,
  • Canal Lining Repair Tenders ,
  • Canal Construction Tenders ,
  • Water Intake Tenders

Get earthen embankment Tender Alert...

520432

Related Searched Keywords : earthen embankment

  • Pit Work Tenders From Maharashtra
  • Dismantlement Tenders From Delhi
  • Land Levelling Tenders From West-Bengal
  • Flood Prevention Work Tenders From -Tamil-Nadu
  • Canal Work Tenders From Andhra-Pradesh
  • Subways Tenders From Gujarat
  • Lift Irrigation Tenders From Karnataka
  • Dismantle Tenders From Uttar-Pradesh
  • Development Work Tenders From Rajasthan
  • Culvert Slab Tenders From Madhya-Pradesh

Read More


Tender Document

454613

State Tenders »

  • Maharashtra Tenders
  • Delhi Tenders
  • West Bengal Tenders
  • Tamil Nadu Tenders
  • Andhra Pradesh Tenders

City Tenders »

  • Hyderabad Tenders
  • Visakhapatnam Tenders
  • Guwahati Tenders
  • Patna Tenders
  • Chandigarh Ut Tenders

Keyword Tenders »

  • Embankment Tenders
  • False Ceiling Tenders
  • Brickwork Tenders
  • Tile Works Tenders
  • Fencing Work Tenders

Sector Tenders »

  • Drugs And Pharmaceuticals Tenders
  • Survey Work Tenders
  • Shipping Transport Tenders
  • Scientific Research And Instruments Tenders
  • Security Services Tenders

Ownership Tenders »

  • Central Government And Public Sector Tenders
  • Co Operative Tenders
  • Corporations And Associations And Others Tenders
  • Private Sector Tenders
  • State Government Tenders

Indian Segment

  • State Tenders
  • City Tenders
  • Industry Tenders
  • SubIndustry Tenders
  • Sector Tenders
  • Ownership Tenders
  • Agency Tenders
  • Keyword Tenders
  • Source of Tenders

Browse Tenders

  • RFP-RFQ Tenders
  • Vender Registration Tenders
  • ICB Tenders
  • NCB Tenders
  • Auction Tenders
  • Corrigendum Tenders
  • E Procurement Tenders
  • GeM Tenders (Registration)

Global Segment

  • Middle East Countries Tenders
  • European Countries Tenders
  • African Countries Tenders
  • Asian Countries Tenders
  • Saar Countries Tenders
  • Australia Oceania Countries Tenders
  • South America Countries Tenders
  • North America Countries Tenders

Others

  • Services
  • Sitemap
  • About Us
  • Contact Us
  • Career
  • Tender Consultants

Get in touch with us

  • +91-92760 83333 (In India)
    +91-92743 15555 (South India)

  • sales@thetenders.com / ceo@thetenders.com

W B


Copyright ©2018 - Thetenders.com. Read Policies

Download Mobile App