Thetenders.com
  +91 92760 83333 / +91 92743 15555
  • Indian Tenders
  • |
  • Global Tenders
  • |
  • Projects
  • |
  • Tender Awarded
  • |
  • Sub-Contractor
  • Pay Online
  • Register now
  • Login
  • Indian Tenders Tender information of India
  • Global Tenders International Tender information
  • Projects Project information of India
  • Tender Awarded Tender awarded information
  • Sub-Contractor Vendor information of India
  • Pay Online
  • Register now
  • Login
  • Contact Info All India : 9276083333 / 9274315555 South India : 9274315555
TheTenders
»
Indian Tenders
»
Keyword Tenders
»
Hydraulic Tractor
Filters
  • » By Keywords
  • » By Cities
  • » By States
  • » By Agencies
  • » By Sectors
  • » By Ownerships
  • Tender Value

List of hydraulic-tractor Tenders

List of latest hydraulic-tractor Tenders in Indian Tenders. Click on any hydraulic-tractor Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for hydraulic-tractor Tenders.

Advance Search
  • All-Tenders (22)
  • |
  • Today's-Tenders
  • |
  • Active-Tenders
  • |
  • Closed-Tenders
1 Construction
image image
State Government
TRN :49052051 |  19 May, 2025
Tender Value : 0
 Daman - Daman And Diu
Tender for hiring charges for supply of macheneries, vehicle, equipment and manpower for the pre-monsoon activity of dredging/cleaning of all the natural drain/nala water way, culverts, cross-drains at marwad panchayat, daman.(2025) (2nd call)-providing & supplying hydraulic hitachi on hire charges inclusing cost of fuel, manpower, loading and unloading of hitachi in natural drain by cranewith all safety safety measures etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, in daman district as directed by engineer in charge. the duration shall be considered from the time at which hitachi is deployed at the site upto the time at which hitachi leaves the site. 3 providing & supplying jcb on hire charges including cost of fuel, driver, operator , manpower etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, etc as directed by engineer in charge. the duration shall be considered from the time at which jcb is deployed at the site upto the time at which jcb leaves the site. 4 providing & supplying tractor on hire charges including cost of fuel, driver, operator , manpower etc complete for work during the dredging / cleaning works of natural drain/ nala water wayas directed by engineer in charge. 5 supplying of unskilled labours for cleaning of natural drain /nala water way i.e removeing of deposited and silting garbage, building rubbish, industrial plastic bages waste, stone, sludge, deposited at bed level including all the equipments required for jungle clearing and nalla cleaning etc as and when rewuired by the department and directed by engineer in charge. 6 shifting of hitachi by trailor/truck including loading and unloading with crane and provision of all safety measures complete as and when required by the depatment and directed by engineer in-charge. 7 providing and laying controlled cement concrete m.200 andcuring complete excludingthe cost of formwork and reinforcement for reinforced concrete work in (a) foundations,footings, baseof columnsandmassconcrete (upto 10 ton) 8 providing formwork of ordinary timber plankings so as to give a rough finish including centering,shuttering, struting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ concrete and plain concrete work in (a) foundations, footings, bases of columns etc. and mass concrete. (upto 10 top) 9 proving tmt bar fe 500/500d reinforcement for r.c.c.work includingbending, binding andplacing in positioncompleteup to floor twolevel (upto 10 ton)
  • View Tender
  • Document
  • Bid Support
2 Construction
image image
State Government
TRN :49052069 |  19 May, 2025
Tender Value : 0
 Daman - Daman And Diu
Tender for hiring charges for supply of macheneries, vehicle , equipment and manpower for dredging/cleaning of the natural drain/nala water way and cross drain at ghelwad panchayat , nani daman. (2025) (2nd call)-providing & supplying hydraulic hitachi on hire charges inclusing cost of fuel, manpower, loading and unloading of hitachi in natural drain by cranewith all safety safety measures etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, in daman district as directed by engineer in charge. the duration shall be considered from the time at which hitachi is deployed at the site upto the time at which hitachi leaves the site. 3 providing & supplying jcb on hire charges including cost of fuel, driver, operator , manpower etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, etc as directed by engineer in charge. the duration shall be considered from the time at which jcb is deployed at the site upto the time at which jcb leaves the site. 4 providing & supplying tractor with trolly on hire charges including cost of fuel, driver, operator , manpower etc complete as and when require including all lift , lead and during the dredging / cleaning works of natural drain/ nala water wayas directed by engineer in charge. 5 supplying of unskilled laboursfor cleaning of natural drain/nala water way i.e. removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, deposited at bed level including provision of all safety measures complete including all the equipments required for jungle clearing and nalla cleaning etc as and when required by the department anddirected by engineer in - charge. 6 providing and laying controlled cement concrete m.200 andcuring complete excludingthe cost of formwork and reinforcement for reinforced concrete work in (a) foundations,footings, baseof columnsandmassconcrete (upto 10 ton) 7 providing formwork of ordinary timber plankings so as to give a rough finish including centering,shuttering, struting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ concrete and plain concrete work in (a) foundations, footings, bases of columns etc. and mass concrete. (upto 10 top) 8 proving tmt bar fe 500/500d reinforcement for r.c.c.work includingbending, binding andplacing in positioncompleteup to floor twolevel (upto 10 ton)
  • View Tender
  • Document
  • Bid Support
3 Construction
image image
State Government
TRN :49052078 |  19 May, 2025
Tender Value : 0
 Daman - Daman And Diu
Tender for , equipment and manpower for dredging/cleaning of the natural drain/nala water way and cross drain at kachigam gram panchayat , nani daman.(2025) (2nd call)-providing & supplying hydraulic hitachi on hire charges inclusing cost of fuel, manpower, loading and unloading of hitachi in natural drain by cranewith all safety safety measures etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, in daman district as directed by engineer in charge. the duration shall be considered from the time at which hitachi is deployed at the site upto the time at which hitachi leaves the site. 3 providing & supplying jcb on hire charges including cost of fuel, driver, operator , manpower etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, etc as directed by engineer in charge. the duration shall be considered from the time at which jcb is deployed at the site upto the time at which jcb leaves the site. 4 providing & supplying tractor with trolly on hire charges including cost of fuel, driver, operator , manpower etc complete as and when require including all lift , lead and during the dredging / cleaning works of natural drain/ nala water wayas directed by engineer in charge. 5 supplying of unskilled laboursfor cleaning of natural drain/nala water way i.e. removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, deposited at bed level including provision of all safety measures complete including all the equipments required for jungle clearing and nalla cleaning etc as and when required by the department anddirected by engineer in - charge. 6 providing and laying controlled cement concrete m.200 andcuring complete excludingthe cost of formwork and reinforcement for reinforced concrete work in (a) foundations,footings, baseof columnsandmassconcrete (upto 10 ton) 7 providing formwork of ordinary timber plankings so as to give a rough finish including centering,shuttering, struting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ concrete and plain concrete work in (a) foundations, footings, bases of columns etc. and mass concrete. (upto 10 top) 8 proving tmt bar fe 500/500d reinforcement for r.c.c.work includingbending, binding andplacing in positioncompleteup to floor twolevel (upto 10 ton) 9 shifting of hitachi by trailor/truck including loading and umloading with crane and provision of all safety measures complete as and when required by the department and directed by engineer in-charge.
  • View Tender
  • Document
  • Bid Support
4 Construction
image image
State Government
TRN :49052089 |  19 May, 2025
Tender Value : 0
 Daman - Daman And Diu
Tender for hiring charges for supply of macheneries, vehicle , equipment and manpower for dredging/cleaning of the natural drain/nala water way and cross drain at somnath gram panchayat , nani daman.(2025) (2nd call)-providing & supplying hydraulic hitachi on hire charges inclusing cost of fuel, manpower, loading and unloading of hitachi in natural drain by cranewith all safety safety measures etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, in daman district as directed by engineer in charge. the duration shall be considered from the time at which hitachi is deployed at the site upto the time at which hitachi leaves the site. 3 providing & supplying jcb on hire charges including cost of fuel, driver, operator , manpower etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, etc as directed by engineer in charge. the duration shall be considered from the time at which jcb is deployed at the site upto the time at which jcb leaves the site. 4 providing & supplying tractor with trolly on hire charges including cost of fuel, driver, operator , manpower etc complete as and when require including all lift , lead and during the dredging / cleaning works of natural drain/ nala water wayas directed by engineer in charge. 5 supplying of unskilled laboursfor cleaning of natural drain/nala water way i.e. removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, deposited at bed level including provision of all safety measures complete including all the equipments required for jungle clearing and nalla cleaning etc as and when required by the department anddirected by engineer in - charge.(m.r) 6 providing and laying controlled cement concrete m.200 andcuring complete excludingthe cost of formwork and reinforcement for reinforced concrete work in (a) foundations,footings, baseof columnsandmassconcrete (upto 10 ton) 7 providing formwork of ordinary timber plankings so as to give a rough finish including centering,shuttering, struting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m and removal of the same for in-situ concrete and plain concrete work in (a) foundations, footings, bases of columns etc. and mass concrete. (upto 10 top) 8 proving tmt bar fe 500/500d reinforcement for r.c.c.work includingbending, binding andplacing in positioncompleteup to floor twolevel (upto 10 ton) 9 shifting of hitachi by trailor/truck including loading and umloading with crane and provision of all safety measures complete as and when required by the department and directed by engineer in-charge.
  • View Tender
  • Document
  • Bid Support
5 Construction
image image
State Government
TRN :49052170 |  19 May, 2025
Tender Value : 0
 Daman - Daman And Diu
Tender for hiring charges for supply of machineries,vehicle,equipment and manpower for dredging/cleaning of all the natural drain/nala water way, culverts, cross drain and rcc gutter at dunetha panchayat,nani daman.(2025) (2nd call)-providing & supplying hydraulic hitachi on hire charges inclusing cost of fuel, manpower, loading and unloading of hitachi in natural drain by cranewith all safety safety measures etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, in daman district as directed by engineer in charge. the duration shall be considered from the time at which hitachi is deployed at the site upto the time at which hitachi leaves the site. 3 providing & supplying jcb on hire charges including cost of fuel, driver, operator , manpower etc. complete for cleaning/dredging work ofnatural drain/nala water way including removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, etc as directed by engineer in charge. the duration shall be considered from the time at which jcb is deployed at the site upto the time at which jcb leaves the site. 4 providing & supplying tractor with trolley on hire charges including cost of fuel, driver, operator , manpower etc complete as and when require including all lift , lead and during the dredging / cleaning works of natural drain/ nala water wayas directed by engineer in charge. 5 supplying of unskilled laboursfor cleaning of natural drain/nala water way i.e. removing of deposited and silting garbage, building rubbish, industrial plastic bagswaste, stone, sludge, deposited at bed level including provision of all safety measures complete including all the equipments required for jungle clearing and nalla cleaning etc as and when required by the department anddirected by engineer in - charge. 6 providingformwork of ordinary timber planking so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceilingnotexceeding 4 m. and removal of the same for in situ reinforced concrete and plain concrete work in. (b) flat surfaces such as soffits of supspened floors slabs landings and the like. (1)floors etc. upto 200 mm in thickness.(upto 10 top) 7 providing formwork of ordinary timber planking so as to give arough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m. and removal of the same for in situ reinforced concrete and plain concrete work in. (c) vertical surface such as walls (any thickness) partitions and the like including attached buttresses & string course & the like. 8 providing formwork of ordinary timber planking so as to give arough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4 m. and removal of the same for in situ reinforced concrete and plain concrete work in. (b) flat surfaces such as soffits of supspened floors slabs landings and the like. (1) floors etc. upto 200 mm in thickness. 9 providing and laying controlled cement concrete m.200 and curing complete excluding the cost of formwork and reinforcement for reinforced concrete work in (a) foundations, footings, base of columns and mass concrete 10 providing and laying controlled cement concrete m.200 and curing complete excluding the cost of formwork and reinforcement forreinforced concrete work in (b) walls, from top of foundation level upto floor two level 11 providing and laying controlled cement concrete m.200andcuring complete excludingthe cost of formwork and reinforcementfor reinforced concrete work in (c) slabs,ianding,sheives,balconieslintels,beams, girders andcantileverupto floor two level. 12 proving tmt bar fe 500/500d reinforcement for r.c.c.work includingbending, binding andplacing in positioncompleteup to floor twolevel (upto 10 ton) 13 shifting of hitachi by trailor/truckincluding loading and unloading with crane andprovision of all safety measures completeas and when required by the department anddirected by engineer in - charge.
  • View Tender
  • Document
  • Bid Support
6 Agriculture
image image
Government Departments
TRN :49053424 |  21 May, 2025
Tender Value : 37.71 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road haitapatti road to gram kotari hote hue gulalpur sasho marg marg tak construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
7 Agriculture
image image
Government Departments
TRN :49053488 |  21 May, 2025
Tender Value : 22.12 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road chamanganj durwasa road to gram sabha saraiduddinpur tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
8 Agriculture
image image
Government Departments
TRN :49053774 |  21 May, 2025
Tender Value : 21.58 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road narai road to hanuman mandir hote hue gram sabha tardih tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
9 Agriculture
image image
Government Departments
TRN :49054283 |  21 May, 2025
Tender Value : 20.06 Lacs
 Prayagraj - Uttar Pradesh
Tender for tender for link road phulpur hanumanganj road to gram puresudee hote hue phulpur saidabad road tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
10 Municipal Corporation
image image
corporations/Associations/Others
TRN :49057165 |  15 May, 2025
Tender Value : 10.00 Lacs
 Kharkhoda - Haryana
Tender for hiring of hydraulic poke lane/ excavator with tractor trolley for cleaning and desilting of drain no 06 and other kachi drain in mc kharkhoda.
  • View Tender
  • Document
  • Bid Support
  • 1
  • 2
  • 3
  • Tenders Expired In - 2025
  • Tenders Expired In - 2024
  • Tenders Expired In - 2023
  • Tenders Expired In - 2022
  • Tenders Expired In - 2021
  • Tenders Expired In - 2020
  • Tenders Expired In - 2019
  • Tenders Expired In - 2018
  • Tenders Expired In - 2017
  • Tenders Expired In - 2016
  • Tenders Expired In - 2015
Related Searched Keywords : hydraulic tractor
  • Hydraulic Tractor Trolley Tenders ,
  • Tractor Repair Tenders ,
  • Tractor Drawn Tenders ,
  • Aircraft Tow Tractor Tenders ,
  • Tractor Trolley Hiring Tenders ,
  • Farm Tractor Tenders ,
  • Tractors Tenders ,
  • Platform Tractors Tenders ,
  • Trailer Machine Tenders ,
  • Cargo Trailer Tenders

Get hydraulic tractor Tender Alert...

620061

Related Searched Keywords : hydraulic tractor

  • Bore Work Tenders From Maharashtra
  • Civil Works Tenders From Delhi
  • Water Proof Treatment Tenders From West-Bengal
  • Flooring Tenders From -Tamil-Nadu
  • Culvert Wall Tenders From Andhra-Pradesh
  • Stone Cladding Tenders From Gujarat
  • False Flooring Tenders From Karnataka
  • Causeway Bridge Tenders From Uttar-Pradesh
  • Wire Fence Tenders From Rajasthan
  • Dismantling Work Tenders From Madhya-Pradesh

Read More


Tender Document

564242

State Tenders »

  • Maharashtra Tenders
  • Delhi Tenders
  • West Bengal Tenders
  • Tamil Nadu Tenders
  • Andhra Pradesh Tenders

City Tenders »

  • Hyderabad Tenders
  • Visakhapatnam Tenders
  • Guwahati Tenders
  • Patna Tenders
  • Chandigarh Ut Tenders

Keyword Tenders »

  • Check Dam Tenders
  • Horizontal Boring Machine Tenders
  • Drilling Machine Spares Tenders
  • Stone Cladding Tenders
  • Civil Work Tenders

Sector Tenders »

  • Drugs And Pharmaceuticals Tenders
  • Survey Work Tenders
  • Shipping Transport Tenders
  • Scientific Research And Instruments Tenders
  • Security Services Tenders

Ownership Tenders »

  • Central Government And Public Sector Tenders
  • Co Operative Tenders
  • Corporations And Associations And Others Tenders
  • Private Sector Tenders
  • State Government Tenders

Indian Segment

  • State Tenders
  • City Tenders
  • Industry Tenders
  • SubIndustry Tenders
  • Sector Tenders
  • Ownership Tenders
  • Agency Tenders
  • Keyword Tenders
  • Source of Tenders

Browse Tenders

  • RFP-RFQ Tenders
  • Vender Registration Tenders
  • ICB Tenders
  • NCB Tenders
  • Auction Tenders
  • Corrigendum Tenders
  • E Procurement Tenders
  • GeM Tenders (Registration)

Global Segment

  • Middle East Countries Tenders
  • European Countries Tenders
  • African Countries Tenders
  • Asian Countries Tenders
  • Saar Countries Tenders
  • Australia Oceania Countries Tenders
  • South America Countries Tenders
  • North America Countries Tenders

Others

  • Services
  • Sitemap
  • About Us
  • Contact Us
  • Career
  • Tender Consultants

Get in touch with us

  • +91-92760 83333 (In India)
    +91-92743 15555 (South India)

  • sales@thetenders.com / ceo@thetenders.com

W B


Copyright ©2018 - Thetenders.com. Read Policies

Download Mobile App