Notice Inviting Tender (NIT) by the Central Government And Public Sector Of India for Supply of S.S.Glass Ink Golden Yellow In Packing Of One 1 Kg.Confirming Followingexperimental And Required Standards For Acceptance/ Rejections Of S.S.Glassink On The Basis Of Practical Tests. I Covering Capacity: Ink Must Havesufficient Covering Capacity So That The Surface Does Not Remain Visible Afterapplicationof One Coat In Screen Printing. Ii Brightness: It Must Have Sufficientbrightness So That Letter Are Clearly Visible On Panel. A Letter Of Size 150 Mmfrom A Distance Of 25 Metre And A Letter Of Size 50 Mm From A Distance Of 10Metre Must Be Clearly Visible To Eyes Of A Healthy Person. Iii Consistency:Ink Should Be In The Form Of Paste And Must Pass Through 80 No. Nylo Boltcloth During Screen Printing. Iv Fluidity : It May Be Easily Spread Over Screenby Screwjee During Screen Printing But Should Not Flow After Printing. V Drying Time : It Must Have At Least 30 Minuts Drying Time So That Five Or Morecoaches Can Be Printed After Applying On Screen . After Printing On Panel Itmust Be Tack Free In 40 - 45 Minutes And Completely Dry In 60-75 Minutes. Vi Washability :- It Should Be Possible To Clean Ink Left Over On Screen By Kerosene Oil.. S.S.Glass Ink Golden Yellow In Packing Of One 1 Kg.Confirming Followingexperimental And Requi Red Standards For Acceptance/ Rejections Of S.S.Glassink On The Basis Of Practical Tests. I Covering Capacity: Ink Must Havesufficient Covering Capacity So That The Surface Does Not Remain Visible Afterapplicationof One Coa T In Screen Printing. Ii Brightness: It Must Have Sufficientbrightness So That Letter Are Clearly Visible On Panel. A Letter Of Size 150 Mmfrom A Distance Of 25 Metre And A Letter Of Size 50 Mm From A Distance Of 10Metre Must B E Clearly Visible To Eyes Of A Healthy Person. Iii Consistency:Ink Should Be In The Form Of Paste And Must Pass Through 80 No. Nylo Boltcloth During Screen Printing. Iv Fluidity : It May Be Easily Spread Over Screenby Screwj Ee During Screen Printing But Should Not Flow After Printing. V Drying Time : It Must Have At Least 30 Minuts Dr Ying Time So That Five Or Morecoaches Can Be Printed After Applying On Screen . After Printing On Panel Itmust Be Tack Free In 40 - 45 Minutes And Completely Dry In 60-75 Minutes. Vi Washability :- It Should Be Possible To Cle An Ink Left Over On Screen By Kerosene Oil. Warranty Period: 30 Months After The Date Of Delivery in Izatnagar - Uttar Pradesh has been published.
The last date of this tender is 09/07/2024, work value is  0 (Refer Doc) INR, EMD is  0 (Refer Doc) INR and tender document fees is  0 (Refer Doc) INR
For more details call us on +91 92760 83333 for bidding support this tender, GeM, vendor registration (if any) and tender BOQ documents.

Tender Document

Related Information

Location

Izatnagar - Uttar Pradesh ( IN )

Ownership

Central Government And Public Sector Of India

Sector

Railway Transport

Important Dates

Published on

24 Jun, 2024

Submission Date

09 Jul, 2024

Opening Date

09 Jul, 2024

Key Values

Work Value

Refer Doc

EMD

Refer Doc

Document Fee

Refer Doc
Tender Document Liaison Service Connect with us