12Widening And Strengthening Of 24.99 Km Stretch In The State. The Work Will Be Carried Out On Gura Musabani-Dumaria-Asthi-Koima Road-Jiyan-Dhalbhumgarh National Highway Nh-33 Road In Length Of 24.99 Km.
13Upgrading Four Lane Road From Naya Chowk Chitarpur Nh-320-Sandi On Mdr-95 And Sandi-Rajrappa Road Mdr-95 In Total Length Of 10.13 Km Along With Construction Of A Bridge In Hazaribagh District Jharkhand.
14Strengthen Reconstruct Mahuda-Sindri Jamadoba Road Length, 22.94 Km Alongwith Construction Of Two High-Level Bridges In Dhanbad District Of Jharkhand Under Plan Head For The Year 2018-19.