You have searched for tamil-nadu in Awarded Tender Result. Click on any tender to view further details.

3231 Widening, Improvements to Government Roads including Junction Improvements, Construction of CD works, Drain and Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-22) The Following works are involved in this package 1. Improvements of Edappady - Poolampatty - Mettur road at km 10/8-12/0 including widening of curves with junction improvements in the Town and Providing hard shoulders (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0375) 2.Widening from Intermediate lane to Two lane and Improvements of Edappady - Poolampatty - Mettur road at km 12/0-12/935 including construction of CD works and storm water drain (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0359) 3.Construction of drain at km 10/8-11/430 & 11/6-12/0 of Edappady - Poolampatty - Mettur road including Retaining wall and CD works (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0392) 4.Construction of Retaining wall at km 12/0-12/935 of Edappady - Poolampatty - Mettur road (SH 220A) Including Upkeeping for a period of 60 months (01-CRIDP-19-20-S-0393) 5.Junction Improvements at km 6/8 including construction of drain from km 6/6-6/8 of Chittur - Poolampatti Road Including Upkeeping for a period of 60 months (01-CRIDP-19-20-O-2629) "
3232 Special Repairs to the Government Roads in Dharapuram (H), C&M Sub-Division. Package No.80 Road A :- Secial Repairs to Palladam - Dharapuram road at km 24/8 - 25/8 (SH174A). Road B :- Secial Repairs to Palladam - Dharapuram road at km 25/8 -27/0 (SH174A). Road C :- Secial Repairs to Palladam - Dharapuram road at km 27/0 -28/0(SH174A). Road D :- Secial Repairs to Pollachi - Dharapuram - Karur road km 49/2 (SH174A). Road E :- Special Repairs to Dharapuram - Poolavadi road road km 23/0 -24/4 & 27/2 -27/660 (MD 884) Road F :- Secial Repairs to Suriyanallur - Eragampatti road km 5/0-6/0. Road G :- Special Repairs toThe road branching at km 18/6 of Palladam - Dharapuram road to Taluk limit (via) Nandhavanampalayam at km 1/8 - 3/0 , 11/0 -12/0 & 13/0-13/2 Road H :- Special Repairs to Puthuchatram - Kangayampalaym road at km 0/4-0/6 & 1/4-1/8
3233 Widening and Improvements, Construction of Drains and Widening of culverts on Governement Roads in Tirupur North (Highways), C&M, Sub Division. (Package No - 33) Road A :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 5/8 - 6/100 and 6/550 - 7/0, Improvements at km 6/100 - 6/550 (SH 169) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 7/0 - 8/0 incuding Construction of Box Culvert at Km 7/2 (SH 169) including upkeeping for a period of 60 months Road C :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 8/0 - 8/6, Improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding Construction of Box Culvert at Km 8/2 (SH 169) including upkeeping for a period of 60 months Road D :- Widening from Two lane to Three lane and Improvements of Tirupur - Somanur road at km 4/2 - 4/700 (SH 169) including upkeeping for a period of 60 months Road E :- Widening from Single lane to Intermediate lane and Improvements of Tirupur - Vijayamangalam road at Km 4/8 of Parapalayam at km 0/0 - 1/0, Improvements at km 1/0 - 2/2 including construction of retaining wall at Km 1/6,1/8 & 1/10 and Construction of RCC Drain at Km 0/2 including upkeeping for a period of 60 months Road F :- Improvements to Riding Quality at km 5/2 - 6/0 of Tiruppur - Vijayamangalam road (SH 19 A) including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of Tiruppur - Vijayamangalam road (SH 19 A)including upkeeping for a period of 60 months"
TRN : 704952 |  Tirupur - Tamil Nadu
Contract Value : 6.98 Crore | Agency Name : Highway Department
Tender award for widening and improvements, construction of drains and widening of culverts on governement roads in tirupur north (highways), c&m, sub division. (package no - 33) road a :- widening from two lane to three lane and improvements of tirupur - somanur road at km 5/8 - 6/100 and 6/550 - 7/0, improvements at km 6/100 - 6/550 (sh 169) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of tirupur - somanur road at km 7/0 - 8/0 incuding construction of box culvert at km 7/2 (sh 169) including upkeeping for a period of 60 months road c :- widening from two lane to three lane and improvements of tirupur - somanur road at km 8/0 - 8/6, improvements at km 8/6 - 8/8 and 8/850 - 9/0 incuding construction of box culvert at km 8/2 (sh 169) including upkeeping for a period of 60 months road d :- widening from two lane to three lane and improvements of tirupur - somanur road at km 4/2 - 4/700 (sh 169) including upkeeping for a period of 60 months road e :- widening from single lane to intermediate lane and improvements of tirupur - vijayamangalam road at km 4/8 of parapalayam at km 0/0 - 1/0, improvements at km 1/0 - 2/2 including construction of retaining wall at km 1/6,1/8 & 1/10 and construction of rcc drain at km 0/2 including upkeeping for a period of 60 months road f :- improvements to riding quality at km 5/2 - 6/0 of tiruppur - vijayamangalam road (sh 19 a) including upkeeping for a period of 60 months road g :- improvements to riding quality at km 6/0 - 6/300, 10/550 - 10/665 and 11/180 - 11/350 of tiruppur - vijayamangalam road (sh 19 a)including upkeeping for a period of 60 months"
3234 Widening and Improvements, Improvements to Riding Quality, Widening of Box Culverts, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.60 Road A :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 7/0 - 8/2 Construction of retainingwall at km 7/6 ,7/8 & 8/2 (MD 512) including up keeping for a period of 60 months. Road B :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 8/2 - 8/8 Construction of retainingwall at km 8/4 (MD 512) including up keeping for a period of 60 months. Road C :- Widening from Intermediate lane to Two lane and Improvements of Udumalpet - Thirumoorthy salai at km 14/4 - 15/8 Construction of retainingwall at km 15/8 (MD 512) including up keeping for a period of 60 months. Road D :- Improvements to Riding Quality at km 0/0 - 1/0 and 6/2 - 6/6 of Sungaramudakku - Ammapatti road including up keeping for a period of 60 months. Road E :- Improvements to Riding Quality at km 3/0 - 4/4 of The road branching at Km 5/6 of Udumalpet-Senjerihills road to Pottayampalayam including up keeping for a period of 60 months. Road F :- Improvements to Riding Quality at km 3/4 - 4/8 of Ragalbavi Village road including up keeping for a period of 60 months. Road G :- Improvements to Riding Quality at km 1/0 - 2/0 of Ravanapuram Village road including up keeping for a period of 60 months. Road H :- Improvements to Riding Quality at km 1/0 - 1/8 of The road branching at Km 13/4 of Udumalpet-Senjerihills road to Alamarathur including up keeping for a period of 60 months. Road I :- Improvements to Riding Quality at km 0/0 - 1/0 and 2/0 - 5/6 of km 8/8 of Udumalpet-Senjeri hills road to Kottamangalam road (Using Plastic Waste) including up keeping for a period of 60 months. Road J :- Widening of Box Culvert at km 29/10 of Erisanampatti - Dhali road and Construction of Retaining wall Road K :- Construction of Retaining Wall at Km 5/0-5/5 of Modakkupatti - Thirumoorthi Nagar road (Palar River Bed)"
TRN : 716238 |  Tirupur - Tamil Nadu
Contract Value : 6.01 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, widening of box culverts, construction of retaining walls and including up keeping for a period of 60 months on government roads in udumalpet (highways), c&m, sub division. package no.60 road a :- widening from intermediate lane to two lane and improvements of udumalpet - thirumoorthy salai at km 7/0 - 8/2 construction of retainingwall at km 7/6 ,7/8 & 8/2 (md 512) including up keeping for a period of 60 months. road b :- widening from intermediate lane to two lane and improvements of udumalpet - thirumoorthy salai at km 8/2 - 8/8 construction of retainingwall at km 8/4 (md 512) including up keeping for a period of 60 months. road c :- widening from intermediate lane to two lane and improvements of udumalpet - thirumoorthy salai at km 14/4 - 15/8 construction of retainingwall at km 15/8 (md 512) including up keeping for a period of 60 months. road d :- improvements to riding quality at km 0/0 - 1/0 and 6/2 - 6/6 of sungaramudakku - ammapatti road including up keeping for a period of 60 months. road e :- improvements to riding quality at km 3/0 - 4/4 of the road branching at km 5/6 of udumalpet-senjerihills road to pottayampalayam including up keeping for a period of 60 months. road f :- improvements to riding quality at km 3/4 - 4/8 of ragalbavi village road including up keeping for a period of 60 months. road g :- improvements to riding quality at km 1/0 - 2/0 of ravanapuram village road including up keeping for a period of 60 months. road h :- improvements to riding quality at km 1/0 - 1/8 of the road branching at km 13/4 of udumalpet-senjerihills road to alamarathur including up keeping for a period of 60 months. road i :- improvements to riding quality at km 0/0 - 1/0 and 2/0 - 5/6 of km 8/8 of udumalpet-senjeri hills road to kottamangalam road (using plastic waste) including up keeping for a period of 60 months. road j :- widening of box culvert at km 29/10 of erisanampatti - dhali road and construction of retaining wall road k :- construction of retaining wall at km 5/0-5/5 of modakkupatti - thirumoorthi nagar road (palar river bed)"
3235 Strengthening, Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of CD Works, Drain and up keeping the roads for a period of 60 months in Valappady C&M Sub Division (Package-12) The Following works are involved in this package 1. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 5/0 - 6/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1287) 2. Widening from Intermediate lane to Two lane and Improvements of Puthiragoundampalayam - Edapatty Road (via) Panamadal at km 7/6 - 8/6 (M669) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1288) 3. Improvements to Riding Quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/2(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4469) 4. Improvements to Riding Quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of Valapady- Thimmanaickenpatty Road including construction of pipe culvert at Km.0/10 (i) and (ii)(MD 530) Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4470) 5. Improvements to Riding Quality at km 0/0-1/0 of Pagadupattu-Moongilpattu Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4511) 6. Strengthening of Palaniapuri to Road from km 32/8 of Salem-Ulundurpet road (via) Thalavaipatty, Thennampillaiyur, Ariyapalayam, E.Karadipatty, West Rajapalayam and Thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2587) 7. Widening from Intermediate lane to Two lane and Improvements of Ayothiyapattinam-Belur- Kilakkadu Road at km 51/0 - 52/4 Including Construction of Drain at km.51/0-51/8 (MD 1044) Including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1291)"
TRN : 719198 |  Salem - Tamil Nadu
Contract Value : 7.00 Crore | Agency Name : Highway Department
Tender award for strengthening, widening, improvements and improvements to riding quality to government roads including construction of cd works, drain and up keeping the roads for a period of 60 months in valappady c&m sub division (package-12) the following works are involved in this package 1. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 5/0 - 6/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1287) 2. widening from intermediate lane to two lane and improvements of puthiragoundampalayam - edapatty road (via) panamadal at km 7/6 - 8/6 (m669) including upkeeping for a period of 60 months (01-cridp-19-20-m-1288) 3. improvements to riding quality at km 0/0 - 0/2, 0/6- 1/100 , 4/8 - 5/0 and 5/4 - 6/0 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/2(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4469) 4. improvements to riding quality at km 6/8 - 7/4, 7/6- 8/0 and 8/8 - 9/2 of valapady- thimmanaickenpatty road including construction of pipe culvert at km.0/10 (i) and (ii)(md 530) including upkeeping for a period of 60 months (01-cridp-19-20-i-4470) 5. improvements to riding quality at km 0/0-1/0 of pagadupattu-moongilpattu road including upkeeping for a period of 60 months (01-cridp-19-20-i-4511) 6. strengthening of palaniapuri to road from km 32/8 of salem-ulundurpet road (via) thalavaipatty, thennampillaiyur, ariyapalayam, e.karadipatty, west rajapalayam and thamaiyanur road at km 9/8 - 10/8, 11/4 - 12/4, 14/0 - 14/6 and 16/6 - 17/0 including upkeeping for a period of 60 months (01-cridp-19-20-o-2587) 7. widening from intermediate lane to two lane and improvements of ayothiyapattinam-belur- kilakkadu road at km 51/0 - 52/4 including construction of drain at km.51/0-51/8 (md 1044) including upkeeping for a period of 60 months (01-cridp-19-20-m-1291)"
3236 Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining Wall, Box Culvert and up keeping the roads for a period of 60 months in Salem C&M Sub Division (Package-3) The Following works are involved in this package 1.Improvements of Omalur Main road in Salem at km 0/0 - 1/2 (SH 218) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0340). 2,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 204/0 - 204/8 (SH 80) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0341). 3,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 203/4 - 204/0 including Construction of Drain at Km.203/4-203/10 of Varanasi Kanyakumari road (Abandoned NH-7)(SH 80) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0342). 4,Improvements to Riding Quality at km 2/0 - 3/4 and 5/6 - 6/0 of Shevapet-Elampillai Road (MD 421) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4468). 5,Improvements to Riding Quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of Suramangalam - Sivathapuram - Neikarapatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4505). 6,Improvements of Pension line road at km 0/0 - 0/930 including construction of Box culvert , Drain and Retaining wall(MD 655) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1305)."
TRN : 720165 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including construction of drain, retaining wall, box culvert and up keeping the roads for a period of 60 months in salem c&m sub division (package-3) the following works are involved in this package 1.improvements of omalur main road in salem at km 0/0 - 1/2 (sh 218) including upkeeping for a period of 60 months (01-cridp-19-20-s-0340). 2,improvements of varanasi - kanyakumari road (abandoned nh7) at km 204/0 - 204/8 (sh 80) including upkeeping for a period of 60 months. (01-cridp-19-20-s-0341). 3,improvements of varanasi - kanyakumari road (abandoned nh7) at km 203/4 - 204/0 including construction of drain at km.203/4-203/10 of varanasi kanyakumari road (abandoned nh-7)(sh 80) including upkeeping for a period of 60 months (01-cridp-19-20-s-0342). 4,improvements to riding quality at km 2/0 - 3/4 and 5/6 - 6/0 of shevapet-elampillai road (md 421) including upkeeping for a period of 60 months (01-cridp-19-20-i-4468). 5,improvements to riding quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of suramangalam - sivathapuram - neikarapatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4505). 6,improvements of pension line road at km 0/0 - 0/930 including construction of box culvert , drain and retaining wall(md 655) including upkeeping for a period of 60 months (01-cridp-19-20-m-1305)."
3237 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction and Reconstruction of CD works, Storm water Drain and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-32) The Following works are involved in this package 1) Widening from Intermediate lane to Two lane and Improvements of Theevattipatty-Danispet- Boomidi Road at km 25/0- 26/450 (MD 851) including upkeeping for a period of 60 months 01-CRIDP -19-20-M-1319 2) Improvements to the Riding Quality at Km.12/2 -18/700 of Kamalapuram - Chinnathirupathi - Jodukuli road (MD1127) including upkeeping for a period of 60 months 01-CRIDP-19-20-I -4535 3) Construction of Drain at km 0/4- 0/8 & 1/6- 1/8 of Theevattipatty- Danispet- Boomidi Road (MD 851) 01-CRIDP-19-20-M-1321 4) Improvements to the Riding Quality at km 0/0-2/4 of Km.3/2 of Thinnapatty road to Koo.Kuttapatty road.including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4545 5) Improvements to Riding Quality at km 5/0- 9/0 of Kamalapuram- Thinnapatty-Pannapatty road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4548 6) Construction of Drain at km. 14/0 - 14/6 of Kaligoundanur-Chinnathirupathy- Poosaripatty road including CD works 01-CRIDP-19-20-O-2636 7) Improvements of Poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and CD Works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2623 8) Widening from single lane to Intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.0/0- 3/0 including Widenig of Culverts including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2613 9) Widening from single lane to intermediate lane and Improvements of Nadupatty - Bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and CD works including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2612. 10) Improvements to Riding Quality at km 0/0 - 2/8 of K.N Pudhur - Sethapalayam road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4550"
TRN : 719191 |  Salem - Tamil Nadu
Contract Value : 8.98 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction and reconstruction of cd works, storm water drain and up keeping for a period of 60 months in omalur (h) c&m sub division (package-32) the following works are involved in this package 1) widening from intermediate lane to two lane and improvements of theevattipatty-danispet- boomidi road at km 25/0- 26/450 (md 851) including upkeeping for a period of 60 months 01-cridp -19-20-m-1319 2) improvements to the riding quality at km.12/2 -18/700 of kamalapuram - chinnathirupathi - jodukuli road (md1127) including upkeeping for a period of 60 months 01-cridp-19-20-i -4535 3) construction of drain at km 0/4- 0/8 & 1/6- 1/8 of theevattipatty- danispet- boomidi road (md 851) 01-cridp-19-20-m-1321 4) improvements to the riding quality at km 0/0-2/4 of km.3/2 of thinnapatty road to koo.kuttapatty road.including upkeeping for a period of 60 months 01-cridp-19-20-i-4545 5) improvements to riding quality at km 5/0- 9/0 of kamalapuram- thinnapatty-pannapatty road including upkeeping for a period of 60 months 01-cridp-19-20-i-4548 6) construction of drain at km. 14/0 - 14/6 of kaligoundanur-chinnathirupathy- poosaripatty road including cd works 01-cridp-19-20-o-2636 7) improvements of poosaripatty road at km 0/0 - 0/6 including construction of storm water drain and cd works including upkeeping for a period of 60 months 01-cridp-19-20-o-2623 8) widening from single lane to intermediate lane and improvements of nadupatty - bommiampatty road at km.0/0- 3/0 including widenig of culverts including upkeeping for a period of 60 months 01-cridp-19-20-o-2613 9) widening from single lane to intermediate lane and improvements of nadupatty - bommiampatty road at km.5/0 - 5/8 including construction of storm water drain at km 0/2 and cd works including upkeeping for a period of 60 months 01-cridp-19-20-o-2612. 10) improvements to riding quality at km 0/0 - 2/8 of k.n pudhur - sethapalayam road including upkeeping for a period of 60 months 01-cridp-19-20-i-4550"
3238 Widening and Improvements, Improvements, Improvements to Riding Quality, Junction improvements, Providing Centre median Construction of Box Culverts, Reconstruction of culverts Construction of Retaining Walls, Widening RCC, slab culverts, Construction of Drain and including Up Keeping for a period of 60 Months on Government Roads in Udumalpet (Highways), C&M, Sub Division. Package No.59 Road A :- Widening from Three lane to Four lane and Improvements of Pollachi- Dharapuram- Karur road at km 18/0-18/6 including Junction Improvements, providing Center median (SH21) including up keeping for a period of 60 months. Road B :- Improvements of Pollachi - Dharapuram - Karur road at km 18/6 - 19/0 including Junction improvement, Providing Center Median and Construction of Drain. (SH 21) including up keeping for a period of 60 months. Road C :- Construction of Box culvert at km 9/2 of Udumalpet - Thirumoorthy salai (MD 512) Road D :- Widening from Single lane to Intermediate lane and Rebuilding of Periyapatti - Negamam road (via) Ammapatti at km 9/500 - 10/0 and including Reconstruction of culvert in lieu of damaged Culvert at km 9/10 including up keeping for a period of 60 months. Road E :- Improvements to Riding Quality at km 0/4 - 0/8 of The road branching at Km 19/0 of Udumalpet-Senjerihills road to Chikkanuthu including up keeping for a period of 60 months. Road F :- Improvements to Riding Quality at km 2/0 - 4/0 of Poolankinar - Kongalnagaram road including up keeping for a period of 60 months. Road G :- Improvements to Riding Quality at km 2/0 - 3/0 of Kongalnagaram - Ramachandrapuram road including up keeping for a period of 60 months. Road H :- Construction of Retaining wall at km 4/2-6/0 of Anthiyur - Kongalnagaram road Road I :- Widening of RCC Slab culvert across PAP canal at km 1/8 of Kongalnagaram - Ramachandrapuram road Road J :- Construction of Box culvert at km 4/6 of km 8/8 of Udumalpet-Senjeri hills road to Kottamangalam road and Construction of Retaining wall Road K :- Construction of Box culvert at km 5/2 of Periyapatti - Negamam road (via) Amanthakadavu and including Retaining wall"
TRN : 716240 |  Tirupur - Tamil Nadu
Contract Value : 5.85 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, junction improvements, providing centre median construction of box culverts, reconstruction of culverts construction of retaining walls, widening rcc, slab culverts, construction of drain and including up keeping for a period of 60 months on government roads in udumalpet (highways), c&m, sub division. package no.59 road a :- widening from three lane to four lane and improvements of pollachi- dharapuram- karur road at km 18/0-18/6 including junction improvements, providing center median (sh21) including up keeping for a period of 60 months. road b :- improvements of pollachi - dharapuram - karur road at km 18/6 - 19/0 including junction improvement, providing center median and construction of drain. (sh 21) including up keeping for a period of 60 months. road c :- construction of box culvert at km 9/2 of udumalpet - thirumoorthy salai (md 512) road d :- widening from single lane to intermediate lane and rebuilding of periyapatti - negamam road (via) ammapatti at km 9/500 - 10/0 and including reconstruction of culvert in lieu of damaged culvert at km 9/10 including up keeping for a period of 60 months. road e :- improvements to riding quality at km 0/4 - 0/8 of the road branching at km 19/0 of udumalpet-senjerihills road to chikkanuthu including up keeping for a period of 60 months. road f :- improvements to riding quality at km 2/0 - 4/0 of poolankinar - kongalnagaram road including up keeping for a period of 60 months. road g :- improvements to riding quality at km 2/0 - 3/0 of kongalnagaram - ramachandrapuram road including up keeping for a period of 60 months. road h :- construction of retaining wall at km 4/2-6/0 of anthiyur - kongalnagaram road road i :- widening of rcc slab culvert across pap canal at km 1/8 of kongalnagaram - ramachandrapuram road road j :- construction of box culvert at km 4/6 of km 8/8 of udumalpet-senjeri hills road to kottamangalam road and construction of retaining wall road k :- construction of box culvert at km 5/2 of periyapatti - negamam road (via) amanthakadavu and including retaining wall"
3239 Improvements to Roads and Improvements to Riding Quality to Government Roads in Salem (H) C &M,Sub Division (Package-5) The Following works are involved in this package 1.Improvements of Jagir Ammapalayam - Tharamangalam road at km 4/0 - 5/2 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0343) 2.Improvements of Jagir Ammapalayam - Tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0344) 3.Improvements of Jagir Ammapalayam - Tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (SH 219) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0345) 4.Improvements to Riding Quality at km 0/0 - 1/2 of Ammapet - Kumaragiri road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4490) 5,Improvements to Riding Quality at km 0/0 - 0/345 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Kalpana Theater side. (01-CRIDP-19-20-I-4507) 6,Improvements to Riding Quality at km 0/0 - 0/690 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Gandhi Stadium side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4506) 7,Improvements to Riding Quality at km 0/0 - 0/240 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Ponni Super Market side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4508) 8,Improvements to Riding Quality at km 0/0 - 0/285 of Service road to the ROB at Km.0/8 of Salem - Omalur Main road near Government Hospital on Hospital side including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4510) "
TRN : 720180 |  Salem - Tamil Nadu
Contract Value : 6.46 Crore | Agency Name : Highway Department
Tender award for improvements to roads and improvements to riding quality to government roads in salem (h) c &m,sub division (package-5) the following works are involved in this package 1.improvements of jagir ammapalayam - tharamangalam road at km 4/0 - 5/2 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0343) 2.improvements of jagir ammapalayam - tharamangalam road at km 5/2 - 6/0 and 8/0 - 8/4 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0344) 3.improvements of jagir ammapalayam - tharamangalam road at km 8/4 - 9/0 and 11/0 - 11/500 (sh 219) including upkeeping for a period of 60 months (01-cridp-19-20-s-0345) 4.improvements to riding quality at km 0/0 - 1/2 of ammapet - kumaragiri road including upkeeping for a period of 60 months (01-cridp-19-20-i-4490) 5,improvements to riding quality at km 0/0 - 0/345 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on kalpana theater side. (01-cridp-19-20-i-4507) 6,improvements to riding quality at km 0/0 - 0/690 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on gandhi stadium side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4506) 7,improvements to riding quality at km 0/0 - 0/240 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on ponni super market side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4508) 8,improvements to riding quality at km 0/0 - 0/285 of service road to the rob at km.0/8 of salem - omalur main road near government hospital on hospital side including upkeeping for a period of 60 months. (01-cridp-19-20-i-4510) "
3240 Widening and Improvements, Improvements, Improvements to Riding Quality, widening of Pipe culverts Construction of Protective walls, Construction of Retaining Walls, Widening the curve and including Up Keeping for a period of 60 Months on Government Roads in Vellakovil (Highways), C&M, Sub Division. Package No.58 Road A :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 37/0 - 38/0 (SH 84 A) including upkeeping for a period of 60 months Road B :- Widening from Two lane to Three lane and Improvements of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai at km 54/2 - 54/8 including Construction of Retaining wall at km 54/4 (SH 84 A) including upkeeping for a period of 60 months Road C :- Widening the Curve at km 54/8 - 55/6 of Erode - Mulanur road (via) Muthur, Vellakovil and Puthuppai including Construction of Protective wall at km 54/10, 55/2 and widening of pipe culvert at km 54/10, 55/4 (SH 84 A) Road D :- Improvements of Vellakovil - Veppampalayam - Noyyal road at km 2/4 - 3/0 and 4/2 - 7/0 including upkeeping for a period of 60 months Road E :- Construction Retaining wall at km 17/4 of Mullipuram - Bhagavathipalayam - Silambagoundanvalasu road Road F :- Improvements to Riding Quality at km 0/0 - 1/650 of Muthur - Vellakovil road to Periyakangayampalayam road including upkeeping for a period of 60 months Road G :- Improvements to Riding Quality at km 0/0 - 2/2 of Rangapayaankaadu - Salaithottampudur road including branch road up to pudhupalayam including upkeeping for a period of 60 months"
TRN : 716241 |  Tirupur - Tamil Nadu
Contract Value : 6.03 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements, improvements to riding quality, widening of pipe culverts construction of protective walls, construction of retaining walls, widening the curve and including up keeping for a period of 60 months on government roads in vellakovil (highways), c&m, sub division. package no.58 road a :- widening from two lane to three lane and improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 37/0 - 38/0 (sh 84 a) including upkeeping for a period of 60 months road b :- widening from two lane to three lane and improvements of erode - mulanur road (via) muthur, vellakovil and puthuppai at km 54/2 - 54/8 including construction of retaining wall at km 54/4 (sh 84 a) including upkeeping for a period of 60 months road c :- widening the curve at km 54/8 - 55/6 of erode - mulanur road (via) muthur, vellakovil and puthuppai including construction of protective wall at km 54/10, 55/2 and widening of pipe culvert at km 54/10, 55/4 (sh 84 a) road d :- improvements of vellakovil - veppampalayam - noyyal road at km 2/4 - 3/0 and 4/2 - 7/0 including upkeeping for a period of 60 months road e :- construction retaining wall at km 17/4 of mullipuram - bhagavathipalayam - silambagoundanvalasu road road f :- improvements to riding quality at km 0/0 - 1/650 of muthur - vellakovil road to periyakangayampalayam road including upkeeping for a period of 60 months road g :- improvements to riding quality at km 0/0 - 2/2 of rangapayaankaadu - salaithottampudur road including branch road up to pudhupalayam including upkeeping for a period of 60 months"

Get Tamil Nadu Awarded Tender Alert...

139569

Advertisment
Advertisment