Latest and live tenders published in all country. Click on any tender to view further details.
construction, refurbishment, renovation,additional alteration, interior decoration works and fabricating, providing & supply ofstandardized furniture at bank’s & financial institutions refurbishment / renovation & face lifting of nbp kulachi branch distt: tank (d.i,khan region) completion time 90 days).construction of boundary wall at nbp, staff colony, samanabad, lahore refurbishment / renovation & face lifting of nbp gbs batkhela branch, (regional office, mardan) (completion time 90 days (completion time 120 days).
supply of inlet valve air compressor
supply of ms stud elbow 1/4" as per sample ms stud elbow 3/4" as per sample stud elbow 1/2" ms as per sample stud union elbow ¾" ms as per sample stud elbow ms 1" as per sample
supply of flexible pipe coupling 4” cat.no.mc152755l/1,80,12500
supply of flexible pipe coupling 3” cat.no.mc152755l/1,80,12500
supply of 300kva perkins d,g set spares
canteen of pakistan rawaliys schools & schools collage
transport least sanitary inspector truck /tractor trolley covered
supply, installation, testing & commissioning of medical equipments for 200 bedded nepal- bharat maitri emergency and trauma centre (nbmetc), kathmandu, nepal
providing of master plan planning and design infrsture faclites cost roads boundary walls water supply system station electfication telephone system etc