Latest and live tenders published in bangladesh. Click on any tender to view further details.
toll collection of morrelgonj ferry ghat, under road division, bageraht
construction of flexible pavement widening strengthening and surfacing including earth work & protective work at 17th km. p) & 18th km, rcc box culvert at 8th km 1x 3.50m x 5.00m) & 1x 4.00m x 5.00m at 10th km of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014.
construction of road embankment, flexible pavement with surfacing including protective work by cc block at 6th km p) ,7th km p), 8th km p) 9th km p) & 10th km p) of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014.
construction of road embankment, flexible pavement with surfacing including protective work by cc block at 6th km p) ,7th km p), 8th km p) 9th km p) & 10th km p) of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014
construction of flexible pavement widening strengthening and surfacing including earth work & protective work at 17th km . p) & 18th km, r c c box culvert 1x 3.50m x 5.00m) at 8th km & 1x 4.00m x 5.00m at 10th km of chatmohor- handial- hamkuria road under road division, pabna during the year 2013-2014
new construction & widening, strengthening of existing pavement and dbs wearing course at 4th p) km. & 5th p) km. of baburhat-matlab-pennai road under road division, comilla during the year 2013-2014.
strengthening, potholes repairing, surfacing carpeting & sealcoat) saucer drain at 9th p), 10th p), 11th, 18th p), 19th to 21st & 22nd p) km. of lalmai-barura-jagatpur-via-jhalam-adda road under road division, comilla during the year 2013-2014.
construction of 2 nos. double vent 2 x 6.00m clear) span & 6.00m clear) height at gap no. 4/1 ch: construction of 2 nos. double vent 2 x 6.00m clear) span & 6.00m clear) height at gap no. 4/1 ch: 3+745) & gap no. 11/1 ch: 10+520), 1 no. single vent 1 x 5.00m clear) span & 3.00m clear) height at gap no. 15/1 ch; 14+160), 1 no. single vent 1 x 6.00m clear) span & 6.00m clear) height at gap no. 15/2 ch: 14+880) rcc box culvert with u-type wing wall, earthwork and protective work at baburhat-matlab-pennai road.
repair of potholes and edge broken, surfacing by providing sealcoat & earthwork at 12th p), 13th p), 14th p), 15th p), 16th, 17th p), 18th p), 19th p), 20th, 21st p), 23rd, 24th & 25th p) km. of baburhat-matlab-pennai road.
construction of 12-storied office building with 3 basement floors civil, internal electrification, sanitary & plumbing, fire hydrant & detection system, cctv system) of bangladesh road transport authority brta) at chairmanbari, banani, dhaka under dhaka road division under dhaka road circle during the year 2013-2014