Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 14091917

Technical And General Specification Of Outsourcing Work M Station, Jeel Ali Power Station Title: Insitu Seat Ring Replacement Of Hr Sg32 Start Up Vent Control Valve; Size: 12 In, Make: Cci Qty: 01 No. Duration: 04 Days. A.#Scope Of Work ·#Moilize Men/Equipment Within 02 Days Of Advance Notice. ·#Get Ptw Permit To Work And Lc Line Clearance Document From Dewa. ·#The Following Documents To E Sumitted To Get Ptw, O#Method Statement. O#Risk Assessment Of The Work. O#Tool Ox Talk Report. ·#Ensure Area Is Correctly Secur Ed And Safe To Work In All Aspects. ·#Conduct Site Survey And Safety Inspection To Assess The Working Environment. ·#If The Working Environment Safe, Then Proceed With The Following Steps. ·#Mark The Parts Orientation Efore Dismantling. ·#Decouple And Remove The A Ctuator. ·#Disassemle The Valve Internals. ·#Install Inline Oring Machine And Cut Seat Seal Weld And Pull Out Existing Seat. ·#Grind And Clean The Welded Area To Insert New Seat. ·#Install New Seat Ring & Prepare For Welding. ·#Preheat The Seat / Ody Welding Area. Heating Arrangement & Technician Will E Provided Y Dewa ·#Weld The Seat On The Ody As Per Applicale Wps Y Oem. Welder Will E Pro Vided Y Dewa ·#Check / Lue Match The Seat Ring & Plug Contact Area. ·#Carry Out Lapping If Required. ·#Re Assemly The Valve, Mount Actuator, Calirate And Stroke Test. ·#Dewa Engineer Shall E Consulted In Case Of Any Indication Of Damages. ·#Replacement Of Spares Shall E Decided During The Joint Inspection. ·#All Olts & Nuts To E Cleaned And Luricated. ·#The Flange Olts Are To Etorque Tighten Ed. ·#Hot Tightening Of The Olts To E Done After Start Up. ·#Final Inspection Shall E Done Y Dewa Personnel. ·#Cci Service Specialis T/Engineer To E Assigned For The Jo. ·#02-03 Skilled Helpers Will E Assigned Y Dewa To Carry Out The Jo. ·#Cci Service Specialist/En Gineer Has To Work Complete The Jo Within The Target Time. ·#De-Moilize Men And Equipment After Completion Of The Jo. ·#Inspection & Maintenance Report To E Sumitted To Dewa. Inspection Report With Photos To E Provided. ·#Seat Cutting Machine And Related Tools Is In Contractors Scope. ·#Proper And Tested Tools To E Used. ·#All Lifting & Power Tools Should E With Valid Test Certificate. ·#The Contractor Shall Visit The Site And E Fully Familiar With The Work Scope Efore Sumitting The Id. ·#Dewa Scope: O#Spares# O#Welder With Welding Machine O#Scaffolding Erection At Site O#02-03 Skilled Helpers. .#Warranty ·#The Warranty Period For The Work Shall E On E Year From The Date Of Completion Of Work Certified Y Dewa. ·#In Case Of Any Damage/Defect Of The Work Carried Out Under This Contr Act Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair Work And Rectify The Defect Within S Hort Period Without Affecting The Production Of Electricity And Water. C.#General Terms & Conditions ·#The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc., Efore He Sumit His Id. ·#The Contractor Shall Ensure Housekeeping On A Daily Asis And The Contractor Shall E Responsile For Allwaste Materi Al Disposals To Designated Places. ·#All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Execution Of The Work. The Contractor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. · #Scaffolding If Required Shall E Arranged Y Dewa. ·#Crane If Required Shall E Arranged Y Dewa. ·#All Rigging And Transporting Equipm Ent Should E Arranged Y The Contractor. These Equipment Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certificates Should E Produced On Demand. Qualified Rigger, Mechanics Should E Provided. ·#The Work Shall E Executed Under Dewa Sup Ervision And As Per Quality/Schedule Requirement. ·#Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. ·#Entry Permits For The Staff/Workers Should E Applied With Passport Copies Having Valid Visa. Persons, Whose Names Are Not Availale In The List, Will Not E Allowed To Enter The Powerhouse. ·#Entry Permits For The Vehicle Should E Applied With Copies Of Vehicle Re Gistration. ·#Dewa Will Arrange Necessary Ptw / Lc / Hwp From Operation, Chemical La / Fire Department Clearances To Carry Out The S Cope Of Work Under This Contract. ·#The Contractor Upon Receiving The Work Permit Shall First Ensure A Safe Working Condition. ·#All The Persons Should Wear All The Required Ppe While At Work. ·#All Material And Tools Rought In Shall E Declared At Power Station Se Curity Gate And The List Of These Items Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engin Eer In-Charge On Daily Asis. This Document Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo. · #Service Air, Electricity And Water For Work At Dewa Site. It Is The Responsiility Of The Contractor To Have His Own Arrangement In Extending The Electricity And Water Utility To His Places Of Work Including Lighting. Contact Person Rafael 0524537031/Arvind 05539 05432

Download Document

Related Information

Location

Dubai - Dubai, United Arab Emirates

Tender No

2331801923

Tender Type

Contract

Important Dates

Published on

31 Aug, 2018

Submission Date

02 Sep, 2018

Opening Date

02 Sep, 2018

Key Values

Work Value

NA

EMD

NA

Document Fee

NA