Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 14092076

Expansion Replacement Work At E-Station In #Jeel Ali Power Station Technical Specification And General Terms & Conditions Title: Hr Sg#4 Pre-Heater Expansion Joint Replacement Work Replacement Of Faric Expansion Joints To E Done As Per Existing Installed Sizes & Lengths Including All Attachments In Ph-Iii, Oiler Hrsg-5 At E Station As Per Attached Scope Of Work. Existing Expansion Joints# D Etails Are As Follows. 1. Faric Expansion Joint Size-Width:260Mm;Length:5500Mm; 2. Olster Size-Width:200Mm, Length:5000Mm, 140Mm Cer Amic Wool 3. Olt & Nut Size:M12x60, 100Nos. In Each Joint 4. Numer Of Faric Expansion Joints To E Replaced:14Nos. Duration: 14Days / Oiler Scope Of Work: Moilize Men And Equipment. Tool Ox Talk For The Work To E Conducted And Copy To E Sumitted Prior Start Of Work. Risk Analysis For Work To E Carried Out And Report To E Sumitted Prior To Start Of Work. Method Statements To E Sumitted Prior T O Start Of Work. Removal Of Expansion Joint Flange Connection All The Removed Olt And Nuts Shall E Cleaned And Luricated Remove Fari C Out Layer. Remove Inner Olster Cleaning Of Expansion Joints Ellow Connection Duct. Weld The Support Holding Hook With Casing For I Nner Olster Fix The Inner Olster Fix The Faric Layer And Joining Y Welding Heat Sealing All The Olts Nut To E Torque Tightened. Al L The Required Tools And Tackles For The Installation Shall E Rought Y Supplier Dewa Will Not Provide Any Tools And Tackles And Manp Ower. Housekeeping Of The Site And Proper Waste Disposal As Per Dewa Safety Rule. Work Completion Report Shall E Sumittedwith Detai Led Description And Photos. Work Period # 4 Days Warranty # One Year Technical Specification And General Terms & Conditions The C Ontractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Safety M Easures Etc., Efore He Sumit His Id. The Contractor Shall Sumit The Schedule Of Work The Period Efore Commencement Of The Work And Shall E Approved Y Dewa. Dewa Anticipates Maximum 3 Days All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Execution Of The Work. The Contractor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. All Tools Required For The Contract Shall E Arranged Y Thecontractor. All Rigging And Transporting Equipment Should E Arranged Y The Contractor. These Rigging Tools Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certificates Should E Produced On Demand. Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. The Work Carried Out Y The Contractor Shall Carry A Warranty For One Year And The Contractor Shall Attend Any Defects Come Out Of Ad Workman Ship Etc Free Of Charge Within This Period. The Contractor Should Apply For The Permit To Work Well In Advance And This Request Sha Ll E Followed With Method Statement, Risk Assessment As Attachments. Hot Work Permit Should Apply On Daily Asis. Entry Permits For T He Workmen Should E Applied Withpassport Copies Having Valid Visa. Persons, Whose Names Are Not Availale In The List Will Not E All Owed To Enter The Power House. Entry Permits For The Vehicle Should E Applied With Copies Of Police Vehicle Registration. All The W Orkmen Should Wear The Uniform, Safety Shoes And Helmet While At Work. Toolox Talks Should E Given To The Workmen Y Their Supervisor Efore Start Of Work. All Material And Tools Rought In Shall E Declared At Power Station Security Gate And The List Of These Items S Hall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engineer In-Charge On Daily Asis. This Docum Ent Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo.In #Jeel Ali Power Station Technical Specification And General Terms & Conditions Title: Hr Sg#4 Pre-Heater Expansion Joint Replacement Work Replacement Of Faric Expansion Joints To E Done As Per Existing Installed Sizes & Lengths Including All Attachments In Ph-Iii, Oiler Hrsg-5 At E Station As Per Attached Scope Of Work. Existing Expansion Joints# D Etails Are As Follows. 1. Faric Expansion Joint Size-Width:360Mm;Length:22000Mm; 2. Olster Size-Width:300Mm, Length:22000Mm, 140Mm C Eramic Wool 3. Olt & Nut Size:M16x60, 700Nos. 4. Numer Of Faric Expansion Joints To E Replaced:1No. Duration: 14Days / Oiler Scope Of Work: Moilize Men And Equipment. Tool Ox Talk For The Work To E Conducted And Copy To E Sumitted Prior Start Of Work. Risk Analy Sis For Work To E Carried Out And Reportto E Sumitted Prior To Start Of Work. Method Statements To E Sumitted Prior To Start Of Wor K. Removal Of Expansion Joint Flange Connection All The Removed Olt And Nuts Shall E Cleaned And Luricated Remove Faric Out Layer. R Emove Inner Olster Cleaning Of Expansion Joints Ellow Connection Duct. Weld The Support Holding Hook With Casing For Inner Olster Fi X The Inner Olster Fix The Faric Layer And Joining Y Welding Heat Sealing All The Olts Nut To E Torque Tightened. All The Required Tools And Tackles For The Installation Shall E Rought Y Supplier Dewa Will Not Provide Any Tools And Tackles And Manpower. Housekee Ping Of The Site And Proper Waste Disposal As Per Dewa Safety Rule. Work Completion Report Shall E Sumitted With Detailed Description And Photos. Work Period # 4 Days Warranty # One Year Technical Specification And General Terms & Conditions The Contractor Shal L Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc., Efore He Sumit His Id. The Contractor Shall Sumit The Schedule Of Work The Period Efore Commencement Of The Work And Shall E Approv Ed Y Dewa. Dewa Anticipates Maximum 3 Days All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Execution Of The Work. The Contractor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. All Tools Required For The Contract Shall E Arranged Y The Contractor. All Rigging And Transporting Equipmentshould E Arran Ged Y The Contractor. These Rigging Tools Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certificates Should E Produced On Demand. Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. The Work Carried Out Y The Contractor Shall Carry A Warranty For One Year And The Contractor Shall Attend Any Defects Come Out Of Ad Workmanship Etc Free Of Charge Within This Period. The Contractor Should Apply For The Permit To Work Well In Advance And This Request Shall E Followed With Method Statement, Risk Assessment As Attachments. Hot Work Permit Should Apply On Daily Asis. Entry Permits For The Workmen Sho Uld E Applied With Passport Copies Having Valid Visa. Persons, Whose Names Are Notavailale In The List Will Not E Allowed To Enter The Power House. Entry Permits For The Vehicle Should E Applied With Copies Of Police Vehicle Registration. All The Workmen Should Wear The Uniform, Safety Shoes And Helmet While At Work. Toolox Talks Should E Given To The Workmen Y Their Supervisor Efore Start O F Work. All Material And Tools Rought In Shall E Declared At Power Station Security Gate And The List Of These Items Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engineer In-Charge On Daily Asis. This Document Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo.

Download Document

Related Information

Location

Dubai - Dubai, United Arab Emirates

Tender No

2331801929

Tender Type

Contract

Important Dates

Published on

31 Aug, 2018

Submission Date

03 Sep, 2018

Opening Date

03 Sep, 2018

Key Values

Work Value

NA

EMD

NA

Document Fee

NA