Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 14107487

Technical And General Specification Of Outsourcing Work M Station, Jeel Ali Power Station Title: Dismantling, Servicing, Overhauling, Installation And Pressure Testing Of Lock 20 & 30 Dfo System Plate Type Heat Exchanger. No Of Phe: 04 Nos. Duration: 06-08 Daysf Or More Clarification You May Contact Arvind Prakash- +971553905432 A.#Scope Of Work: ·#Moilize Men/Equipment. ·#Sumit The Followi Ng Documents And Get Ptw Permit To Work And Lc Line Clearance Document From Dewa. O#Method Statement O#Risk Assessment Of The Wo Rk O#Tool Ox Talk Report. ·#Conduct Site Survey And Safety Inspection To Assess The Working Environment. ·#Ensure Area Is Correctly Secured And Safe To Work On In All Respects. ·#Ensure Positive Line Isolation And Proper Depressurizing Of The Lineefore Start Of W Ork. ·#If The Working Environment Safe, Then Proceed With The Following Steps. ·#Dismantle The Heat Exchanger Connections, Foundatio N Olts And Install Lind Flanges On Pipe Connections. ·#Remove The Heat Exchanger. Dewa Will Supply Crane ·#Transport The Phe From Dewa Jeel Ali, M Station To Contractor Workshop. ·#Dismantle The Heat Exchanger Using Special Tools. ·#Carryout Inspection On All Pl Ates 237 No#S. Dewa Representative Will Witness. ·#Generate Report On Existing Plate Conditions. ·#Carry Chemical And Hydro Jet Cleaning Of All Plates 237 No#S. ·#Conduct Crack Detection Of Individual Plates To Identify Leaks If Any Using Light Ray Test Meth Od. Excessive Corrosion May Have Caused Minute Pinholes Or Cracks That Are Notvisile To Naked Eye. ·#If Total Quantity Of Damaged P Lates Are Within 10% Of Installed Quantity Then It Has To E Removed / Replaced Dewa Will Advise After Inspection Dewa Will Supply The Plates If Required ·#If Total Quantity Of Damaged Plates Are More Than 10% Then It Has To E Replaced Dewa Will Supply The Pla Tes. ·#Replace The Gaskets Dewa Will Supply The Gaskets. ·#Carryout Service And Paint On End Frames And Accessories. ·#Carryout S Ervicing Of Nut & Olts And Tie Rods. ·#Assemle The Plates According To Plate Placement Pattern. ·#Prepare And Carry Out Hydro Pressu Re Test On Oth Sides Of The Unit Dewa Representative Will Witness. ·#Deliver The Phe To Dewa Jeel Ali, M Station ·#Assemle The Phe, All Accessories & Pipe Connections ·#Sumit Report On The Activities Carried Out With All Details & Photos. ·#Sumit The Report Of Performance Analysis. ·#Handover And Demoilize. ·#Efore Sumitting The Id, The Contractor Shall Visit The Site And E Fully Familiar W Ith The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc. .#Warranty ·#The Warranty Period For The Work Sha Ll E One Year From The Date Of Completion Of Work Certified Y Dewa. ·#In Case Of Any Damage/Defect Of The Work Carried Out Under Thi S Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repair Work And Rectify The Defect W Ithin Short Period Without Affecting The Production Of Electricity And Water. C.#General Terms & Conditions ·#The Contractor Shallensure Housekeeping On A Daily Asis And The Contractor Shall E Responsile For All Waste Material Disposals To Designated Places. ·# All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Execution Of The Work. The Contr Actor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. ·#Scaffolding If Required Shall E Arra Nged Y Dewa. ·#Crane If Required Shall E Arranged Y Dewa. ·#All Rigging And Transporting Equipment Should E Arranged Y The Contracto R. These Equipment Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certificates Should E Produced On De Mand. Qualified Rigger, Mechanics Should E Provided. ·#The Work Shall E Executed Under Dewa Supervision And As Perquality/Schedule Requirement. ·#Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. ·#Entry Permits For The Staff/Workers Should E Applied With Passport Copies Having Valid Visa. Persons, Whose Names Are Not Availale In The List, Will Not E Allowed To E Nter The Powerhouse. ·#Entry Permits For The Vehicle Should E Applied With Copies Of Vehicle Registration. ·#Dewa Will Arrange Neces Sary Ptw / Lc / Hwp From Operation, Chemical La / Fire Department Clearances To Carry Out The Scope Of Work Under This Contract. ·#T He Contractor Upon Receiving The Work Permit Shall First Ensure A Safe Working Condition. ·#All The Persons Should Wear All The Requ Ired Ppe While At Work. ·#All Material And Tools Rought In Shall E Declared At Powerstation Security Gate And The List Of These Ite Ms Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engineer In-Charge On Daily Asis. This Doc Ument Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo. ·#Service Air, Electricity And Water F Or Work At Dewa Site. It Is The Responsiility Of The Contractor To Have His Own Arrangement In Extending The Electricity And Water Utility To His Places Of Work Including Lighting.

Download Document

Related Information

Location

Dubai - Dubai, United Arab Emirates

Tender No

2411800710

Tender Type

Contract

Important Dates

Published on

03 Sep, 2018

Submission Date

06 Sep, 2018

Opening Date

06 Sep, 2018

Key Values

Work Value

NA

EMD

NA

Document Fee

NA