Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 14132871

Fire Fighting System Foam Replacement And Used Foam Disposal Work At G Station. Foam Tank Details, 1#Foam Tank At Dfo/Mfo Storag E Tank Area - Capacity - 7.0 Cu. Meter. 2#Foam Tank At Mfo Day Tank Areavertical Lack Tank Capacity # 1.25 Cu. Mete R 3#Foam Tank At Aux.Oiler Area # Capacity - 0.5 Cu. Meter. 4#Foam Tank At K Station Forwarding Area # Capacity - 0.30 Cu. Meter Total Volume Of Foam For Disposal # Approximate 7.5 Cu. Meter Scope Of Work 1 Contractor Sho Uld Sumit The Risk Assessment And Method Statement For Otaining Ptw From Opn. Contractor Is Advised To Do The Site Visit To Understa Nd The Complete Scope Of Work Efore Sumitting Quotation. 2 It Is The Responsiility Of The Contractor To Work Safely, Supervise Work And Ensure System Is Safe To Work 3 First Remove Complete Foam From Tank; Cleanthe Tank, Refill Full Tank With Fresh Foam Supplie D Y Dewa. 4 Contractor Should Have Valid Permit Form Municipality To Dispose The Waste. Copy To E Sumitted Prior To Start Work. 5 Foam Recovered From All Tanks To E Transported For Disposal, Through Proper Vehicle. 6 Clean Foam Tank Area Carry Out Housekeeping And Clear The Area 7. Finish The Work And Clear The Ptw. Dewa Scope 1 Dewa Will Supply Fresh Angus Fp Air Liquid Fluro Protein 3% Foam. 2 Dewa Engineer In Charge Will Assist For Entry Permit To Work Etc. General Conditions 1. The Contractor Shall E Comp Etent And Have Enough Experience In The Similar Work And The Work Shall E Undertaken With Utmost Safety To The Plant And Humans Work Ing Under Him And Neary. 2. The Contractorshall Arrange All The Equipment, Tools, Accessories Required For Emptying And Refilling Of Foam In Tank. 3. Contractor Must Arrange His Own Tanker For The Transportation Of The Foam. 4. The Contractor Shall E Responsil E For Safety Of His Equipment And Personnel And Will Follow All Estalished Codes Of Practices On Safety And Security Within The Plan T. 5. Tool Ox Talks Shall E Conducted On Daily Asis. Copy To E Sumitted Daily . Note - Tank Will E Given One Y One After Completi On First One For Site Visit Contact Persons: Mr. Arad Moile: 0504611635, Fire Fighting System Foam Replacement And Used Foam Disposal Work At G Station. Foam Tank Details, 1#Foam Tank At Dfo/Mfo Storage Tank Area - Capacity - 7.0 Cu. Meter. 2#Foam Tank At Mfo Day Tank Areavertical Lack Tank Capacity # 1.25 Cu. Meter3#Foam Tank At Aux.Oiler Area # Capacity - 0.5 Cu. Meter. 4#Foam Tank At K Station Forwarding Area # Capacity - 0.30 Cu. Meter Total Volume Of Foam For Disposal # Approximate 7.5 Cu. Meter Scope Of Work 1 Contractor Shou Ld Sumit The Risk Assessment And Method Statement For Otaining Ptw From Opn. Contractor Is Advised To Do The Site Visit To Understan D The Complete Scope Of Work Efore Sumitting Quotation. 2 It Is The Responsiility Of The Contractor To Work Safely, Supervise Work And Ensure System Is Safe To Work 3 First Remove Complete Foam From Tank; Clean The Tank, Refill Full Tank With Fresh Foam Supplied Y Dewa. 4 Contractor Should Have Valid Permit Form Municipality To Dispose The Waste. Copy To E Sumitted Prior To Start Work. 5 F Oam Recovered From All Tanks To Etransported For Disposal, Through Proper Vehicle. 6 Clean Foam Tank Area Carry Out Housekeeping A Nd Clear The Area 7. Finish The Work And Clear The Ptw. Dewa Scope 1 Dewa Will Supply Fresh Angus Fp Air Liquid Fluro Protein 3% Foam. 2 Dewa Engineer In Charge Will Assist For Entry Permit To Work Etc. General Conditions 1. The Contractor Shall E Compe Tent And Have Enough Experience In The Similar Work And The Work Shall E Undertaken With Utmost Safety To The Plant And Humans Worki Ng Under Him And Neary. 2. The Contractor Shall Arrange All The Equipment, Tools, Accessories Required For Emptying And Refilling O F Foam In Tank. 3. Contractor Must Arrange His Own Tanker For The Transportation Of The Foam. 4. The Contractor Shall E Responsile For Safety Of His Equipment And Personneland Will Follow All Estalished Codes Of Practices On Safety And Security Within The Plant . 5. Tool Ox Talks Shall E Conducted On Daily Asis. Copy To E Sumitted Daily . Note - Tank Will E Given One Y One After Completio N First One For Site Visit Contact Persons: Mr. Arad Moile: 0504611635, Fire Fighting System Foam Replacement And Used Foam Disposal Work At G Station. Foam Tank Details, 1#Foam Tank At Dfo/Mfo Storage Tank Area - Capacity - 7.0 Cu. Meter. 2#Foam Tank At Mfo Day Tank Areavertical Lack Tank Capacity # 1.25 Cu. Meter 3#Foam Tank At Aux.Oiler Area # Capacity - 0.5 Cu. Meter. 4#Foam Tank At K Station Forwarding Area # Capacity - 0.30 Cu. Meter Total Volume Of Foam For Disposal # Approximate 7.5 Cu. Meter Scope Of Work 1 Contractor Shou Ld Sumit The Risk Assessment And Method Statement For Otaining Ptw From Opncontractor Is Advised To Do The Site Visit To Understan D The Complete Scope Of Work Efore Sumitting Quotation. 2 It Is The Responsiility Of The Contractor To Work Safely, Supervise Work And Ensure System Is Safe To Work 3 First Remove Complete Foam From Tank; Clean The Tank, Refill Full Tank With Fresh Foam Supplied Y Dewa. 4 Contractor Should Have Valid Permit Form Municipality To Dispose The Waste. Copy To E Sumitted Prior To Start Work. 5 F Oam Recovered From All Tanks To E Transported For Disposal, Through Proper Vehicle. 6 Clean Foam Tank Area Carry Out Housekeeping A Nd Clear The Area 7. Finish The Work And Clear The Ptw. Dewa Scope 1 Dewa Will Supply Fresh Angus Fp Air Liquid Fluro Protein 3% Foam. 2 Dewa Engineer In Charge Will Assistfor Entry Permit To Work Etc. General Conditions 1. The Contractor Shall E Compe Tent And Have Enough Experience In The Similar Work And The Work Shall E Undertaken With Utmost Safety To The Plant And Humans Worki Ng Under Him And Neary. 2. The Contractor Shall Arrange All The Equipment, Tools, Accessories Required For Emptying And Refilling O F Foam In Tank. 3. Contractor Must Arrange His Own Tanker For The Transportation Of The Foam. 4. The Contractor Shall E Responsile For Safety Of His Equipment And Personnel And Will Follow All Estalished Codes Of Practices On Safety And Security Within The Plant . 5. Tool Ox Talks Shall E Conducted On Daily Asis. Copy To E Sumitted Daily . Note - Tank Will E Given One Y One After Completion First One For Site Visit Contact Persons:Mr. Arad Moile: 0504611635, Fire Fighting System Foam Replacement And Used Foam Disposal Work At G Station. Foam Tank Details, 1#Foam Tank At Dfo/Mfo Storage Tank Area - Capacity - 7.0 Cu. Meter. 2#Foam Tank At Mfo Day Tank Areavertical Lack Tank Capacity # 1.25 Cu. Meter 3#Foam Tank At Aux.Oiler Area # Capacity - 0.5 Cu. Meter. 4#Foam Tank At K Station Forwarding Area # Capacity - 0.30 Cu. Meter Total Volume Of Foam For Disposal # Approximate 7.5 Cu. Meter Scope Of Work 1 Contractor Shou Ld Sumit The Risk Assessment And Method Statement For Otaining Ptw From Opn. Contractor Is Advised To Do The Site Visit To Understan D The Complete Scope Of Work Efore Sumitting Quotation. 2 It Is The Responsiility Of The Contractor To Work Safely, Supervise Work And Ensure System Is Safe To Work 3 Firstremove Complete Foam From Tank; Clean The Tank, Refill Full Tank With Fresh Foam Supplied Y Dewa. 4 Contractor Should Have Valid Permit Form Municipality To Dispose The Waste. Copy To E Sumitted Prior To Start Work. 5 F Oam Recovered From All Tanks To E Transported For Disposal, Through Proper Vehicle. 6 Clean Foam Tank Area Carry Out Housekeeping A Nd Clear The Area 7. Finish The Work And Clear The Ptw. Dewa Scope 1 Dewa Will Supply Fresh Angus Fp Air Liquid Fluro Protein 3% Foam. 2 Dewa Engineer In Charge Will Assist For Entry Permit To Work Etc. General Conditions 1. The Contractor Shall E Compe Tent And Have Enough Experience In The Similar Work And The Work Shall E Undertaken With Utmost Safety To The Plant And Humans Worki Ng Under Him And Neary. 2. The Contractorshall Arrange All The Equipment, Tools, Accessories Required For Emptying And Refilling O F Foam In Tank. 3. Contractor Must Arrange His Own Tanker For The Transportation Of The Foam. 4. The Contractor Shall E Responsile For Safety Of His Equipment And Personnel And Will Follow All Estalished Codes Of Practices On Safety And Security Within The Plant . 5. Tool Ox Talks Shall E Conducted On Daily Asis. Copy To E Sumitted Daily . Note - Tank Will E Given One Y One After Completio N First One For Site Visit Contact Persons: Mr. Arad Moile: 0504611635

Download Document

Related Information

Location

Dubai - Dubai, United Arab Emirates

Tender No

2331801916

Tender Type

Contract

Important Dates

Published on

07 Sep, 2018

Submission Date

09 Sep, 2018

Opening Date

09 Sep, 2018

Key Values

Work Value

NA

EMD

NA

Document Fee

NA