Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 15563472

Scope Of Work: Party Shall Visit The Site And Familiarise The Jo Efore Idding. Moilize Men And Equipment. Tool Ox Talk For The Work To E Conduct And Copy To E Sumitted Prior Start Of Work. Risk Analysis For Work To E Carry Out And Report To E Sumit Prior To Start Of Work. Method Statements To E Sumit Prior To Start Of Work. Removal Of Existing Faric Pipe Penetration Seal Cleaning Of The Expans Ion Ellow Flange Connection And Pipes All The Removed Olt And Nuts Shall E Cleaned And Luricated Design, Farication, And Supply Of N Ew Faric Pipe Penetration Seal With Necessary Fastners Clamps And Fittings As Per The Drawing Attached And To Suit The Site Condi Tion. Fixing Of New Faric Pipe Penetration Seal. All The Required Material To E Ring Y Supplier For The Installation Dewa Will Notp Rovide Any Tools And Tackles And Man Power House Keeping Of The Site And Proper Waste Disposal As Per Dewa Safety Rule. Work Period # 3 Days Warranty # One Year. Technical Specification And General Terms & Conditions The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facilities, Complexities, Safety Measures Etc., Efore He Sumit His Id The Contractor Shall Sumit The Schedule Of Work The Period Efore Commencement Of The Work And Shall E Approved Y Dewa. Dewa Anticipates Maximum 3 Days All Dewa Safety & Environment Policy, Rules And Regulation Shall E Followed At Work Site During The Execution Of The Work. The Contractor#S Engineer Should E Familiar With Safety Regulationswhile Working In A Hazardous Area. All Tools Require D For The Contract Shall E Arranged Y The Contractor. All Rigging And Transporting Equipment Should E Arranged Y The Contractor. The Se Rigging Tools Should E Duly Tested And Certified Y The 3Rd Party Inspection Agency And The Certificates Should E Produced On Dema Nd. Contractor#S Supervisor Shall E Availale At Site Throughout The Period Of Work. The Work Carried Out Y The Contractor Shall C Arry A Warranty For One Year And The Contractor Shall Attend Any Defects Come Out Of Ad Workmanship Etc Free Of Charge Within This Period. The Contractor Should Apply For The Permit To Work Well In Advance And This Request Shall E Followed With Method Statement, Risk Assessment As Attachments Entrypermits For The Workmen Should E Applied With Passport Copies Having Valid Visa. Persons, Wh Ose Names Are Not Availale In The List Will Not E Allowed To Enter The Power House. Entry Permits For The Vehicle Should E Applied W Ith Copies Of Police Vehicle Registration. All The Workmen Should Wear The Uniform, Safety Shoes And Helmet While At Work. Toolox Talks Should E Given To The Workmen Y Their Supervisor Efore Start Of Work. All Material And Tools Rought In Shall E Declared At Po Wer Station Security Gate And The List Of These Items Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodged With Dewa Engineer In-Charge On Daily Asis. This Document Will E The Asis For The Clearance Gate Pass To Take Them Out On Completion Of The Jo.

Download Document

Related Information

Location

Dubai - Dubai, United Arab Emirates

Tender No

2331900970

Tender Type

Contract

Important Dates

Published on

17 Apr, 2019

Submission Date

23 Apr, 2019

Opening Date

23 Apr, 2019

Key Values

Work Value

NA

EMD

NA

Document Fee

NA