Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 16577335

Provision Of Managing Contractor Mcc-1 2003 Services For The Planning And Construction Of Buildings, Services And Infrastructure In Connection With The Project At Two Sites: • Defence Establishment Orchard Hills Deoh, Nsw • Eo Depot Myambat, Nsw The Prospective Scope Includes But Is Not Limited To: Deoh • Defence Eo Training School • Eo Processing • Living-In Accommodation Lia; • Working Accommodation • Consolidated Multi Unit / User Facility • Eo Depot Administrative Facility • Shared Services Including Messes, Gymnasium And Wellbeing Facilities; • Base Entry And Security; And • Site Infrastructure Including Potable & Fire Networks, Electrical Systems And Waste Water. Eo Depot Myambat • Potable And Fire Water Networks • Waste Water And Trade Waste • Base Entry And Security It Is Anticipated That The Project Will Involve Interfacing And Approvals With External Authorities In Respect Of Hv Works, Waste Water Outfall And The Northern Road At Deoh, And Water Supply At Eo Depot Myambat. The Managing Contract Contract Mcc-1 2003 Is A Two Stage Contract Where The Successful Tenderer Is Appointed To Plan The Works 9The Planning Phase Incl. All Aspects Of Engineering, Environmental, Heritage, Contaminated Land Incl. Uxo And Services Condition And Capacity Investigations To Support Design, Capital And Operating Cost Estimates Fir Departmental And Government Approvals Necessary To Proceed To Construct The Works The Delivery Phase It Is Intended That The Contractor Will Complete The 5% Master Planning And Feasibility Review Milestone As Part Of Its’ Contractor Work Fee Planning With The Intention Of Refining Scope And Cost Prior To Finally Appointing The Planning Phase Design Team For The 30% Concept Level And 50% Schematic Level Of Design Milestones Under Clause 8 Of The Contract. Contractor Appointment For The Delivery Phase Is Subject To Achieving All Relevant Approvals, Incl. Parliamentary Approval Of The Proposed Works, And Achieving Delivery Phase Agreement In Accordance With The Contract

Download Document

Related Information

Location

Australia - Australia, Australia

Tender No

-

Tender Type

Contract

Important Dates

Published on

18 Sep, 2019

Submission Date

15 Oct, 2019

Opening Date

15 Oct, 2019

Key Values

Work Value

NA

EMD

NA

Document Fee

NA