Bidding Support

297206

Bidding Support

Warm Greetings from www.thetenders.com, the fastest growing tender information portal in India.

Overhaul Of Vent Valve With Actuator Of Pst-15/25 Description Of Work: Overhaul Of Vent Valve With Actuator Scope Of Work: 1. Moi Lization Of People, Material, Tools And Consumales 2. Risk Assessment And Work Method Statement To E Sumitted. 3. Tool Ox Talk To E Given To The Contractor People On Daily Asis. 4. Complete Dismantling The Actuator And Valve, For Dismantling The Actuator And Valve If It Requires To Dismantle The Neary Parts Or Assemly It Will E In Vendors# Scope. 5. Inspection Of Every And Each Parts Of Actuat Or And Valve 6. Inspection With Ndt 7. Repair And Rectification If Necessary, If Any Small Machining Work Required It Will E In Vend Or#S Scope. 8. Reassemly The Actuator And Valve Including Other Parts Or Assemly Opened During Dismantling And Complete The Work Inall Respect 9. Leak Test Of The Valve And Functional Test Of The Actuator 10. All The Lifting Tackles And Tools Required For The Wor K To E Rought Y Vendor And It Shall E With Valid Certificate. Lifting Work Will E In Vendors Scope 11. If Need To Take Outside Dewa Then It Will E In Vendors# Scope 12. Sumission Of Details Report Of Work Done 13. Paint Similar Color As Existing. 14. Work Will E Carried Out As Per Dewa Work Schedule. 15. Dewa Health, Safety And Environment Policy Will E Followed 16. Work To E Completed In All Respect Contact: For Technical Clarification Please Contact Ezaz-0503493353/0555090835, Emailmd. E@Dewa.Gov.Ae, Tariq-0555597553 Scope Of Dewa: 1. All I&C And Electrical Instruments Shall E Disconnected Y Dewa 2. Air Supply As Availale At One Point 3. Powersupply In One Point 4. Crane As Availale 5. It Is The Responsiility Of The Contractor To Have His Own Arrangement In Extending The E Lectricity And Water Utility To His Places Of Work. For Any Ulk Storage Of Water, Contractor Should Make His Own Arrangement For Sto Rage Tanks, Etc. 6. The Contractor, However, Is Required To Furnish In Advance His Requirement Of Power And Air With Full Justificat Ion. Contractor Shall Not Waste Or Misuse The Facilities Provided Y Dewa. 7. Isolations And Permit To Work Of The Designated Equipme Nt In Line With Dewa Ptw Procedure. 8. Necessary Entry Permits For Contractor Personnel, Equipment And Vehicles As Per Dewa Procedur E. Warranty: 1. The Warranty Period For The Works Shall E One Year From The Date Of Commissioning 2. In Case Of Anydamage/Defect O F The Work Carried Out Under This Contract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repa Ir / Replacement Work And Make Good The Defect Within Shortest Period. The Contractor Will Provide 24-Hour Emergency Numer And Will Endeavor To E Onsite Within 24 Hours Of Return Request Y Dewa. 3. On Eing Given A Notice Of Defect Y Dewa, The Contractor Shall Arra Nge To Carry Out The Repair Work Within The Prescried Time Limit As Set Out Y Dewa And All Such Contingencies Shall E Deemed To Have Een Covered In The Offer. Payment: Payment Will E Done As Per Actual Work Md Ezazul Haque Khan Sr Engineer, G Mst, Japs, Dewa, Overhaul Of Vent Valve With Actuator Of Pst-15/25 Description Of Work: Overhaul Ofvent Valve With Actuator Scope Of Work: 1. Moi Lization Of People, Material, Tools And Consumales 2. Risk Assessment And Work Method Statement To E Sumitted. 3. Tool Ox Talk To E Given To The Contractor People On Daily Asis. 4. Complete Dismantling The Actuator And Valve, For Dismantling The Actuator And Valve If It Requires To Dismantle The Neary Parts Or Assemly It Will E In Vendors# Scope. 5. Inspection Of Every And Each Parts Of Actuat Or And Valve 6. Inspection With Ndt 7. Repair And Rectification If Necessary, If Any Small Machining Work Required It Will E In Vend Or#S Scope. 8. Reassemly The Actuator And Valve Including Other Parts Or Assemly Opened During Dismantling And Complete The Work In All Respect 9. Leak Test Of The Valve And Functional Test Of The Actuator 10. All Thelifting Tackles And Tools Required For The Wor K To E Rought Y Vendor And It Shall E With Valid Certificate. Lifting Work Will E In Vendors Scope 11. If Need To Take Outside Dewa Then It Will E In Vendors# Scope 12. Sumission Of Details Report Of Work Done 13. Paint Similar Color As Existing. 14. Work Will E Carried Out As Per Dewa Work Schedule. 15. Dewa Health, Safety And Environment Policy Will E Followed 16. Work To E Completed In All Respect Contact: For Technical Clarification Please Contact Ezaz-0503493353/0555090835, Emailmd. E@Dewa.Gov.Ae, Tariq-0555597553 Scope Of Dewa: 1. All I&C And Electrical Instruments Shall E Disconnected Y Dewa 2. Air Supply As Availale At One Point 3. Power Supply In One Point 4. Crane As Availale 5. It Is The Responsiility Of The Contractor Tohave His Own Arrangement In Extending The E Lectricity And Water Utility To His Places Of Work. For Any Ulk Storage Of Water, Contractor Should Make His Own Arrangement For Sto Rage Tanks, Etc. 6. The Contractor, However, Is Required To Furnish In Advance His Requirement Of Power And Air With Full Justificat Ion. Contractor Shall Not Waste Or Misuse The Facilities Provided Y Dewa. 7. Isolations And Permit To Work Of The Designated Equipme Nt In Line With Dewa Ptw Procedure. 8. Necessary Entry Permits For Contractor Personnel, Equipment And Vehicles As Per Dewa Procedur E. Warranty: 1. The Warranty Period For The Works Shall E One Year From The Date Of Commissioning 2. In Case Of Any Damage/Defect O F The Work Carried Out Under Thiscontract Within This Warranty Period, The Contractor Shall Attend And Carry Out The Necessary Repa Ir / Replacement Work And Make Good The Defect Within Shortest Period. The Contractor Will Provide 24-Hour Emergency Numer And Will Endeavor To E Onsite Within 24 Hours Of Return Request Y Dewa. 3. On Eing Given A Notice Of Defect Y Dewa, The Contractor Shall Arra Nge To Carry Out The Repair Work Within The Prescried Time Limit As Set Out Y Dewa And All Such Contingencies Shall E Deemed To Have Een Covered In The Offer. Payment: Payment Will E Done As Per Actual Work Md Ezazul Haque Khan Sr Engineer, G Mst, Japs, Dewa.

GTN :14093398
Dubai - Dubai

GLOBAL Hire Our Expertise :

  • Tender Bidding
  • Tender Consultancy
  • Tender Advisory
  • Identify Eligibility Criteria
  • Identify Penelty Clauses
  • Highlight Important Dates
  • Technical Bid Preparation
  • Offline Bid Preparation
  • Online Bid Preparation
  • Offline Bid Submission
  • Online Bid Submission
  • Track Corrigendum / Addendums
  • Attend Pre Bid Meetings
  • Consistent Liaison & Coordination
  • EMD Follow Ups

GLOBAL - bidding
image

We heartily welcome your move to excel your business to new heights.

Set Tender Alert

Activate daily alerts to know the tenders available of your work.

Get alerts

Bidding Support

Ask experts, how to fill bid forms, submit bids, participate in bids.

Get in touch

GeM Registration

Looking for GeM Registration? Get in touch with us and we will do the needful.

Registration

Digital Certificate

Get DSC for e-Tendering, e-Auction, e-bidding, Corporations / Associations / Others Tenders

Purchase now

Tender Awards

Want to know who's got the tender and are looking for subcontracting?

Connect now

Projects

Government and other private players, Real-time Updates of Project Information

Get info

International Tenders

We almost cover all the regions and countries across the world. Click to take your business to new heights.

Start now

Web Design

Get the Best Offers & Deals, expertise in developing static websites, dynamic websites and e-commerce.

Design now