Bidding Support

345965

Bidding Support

Warm Greetings from www.thetenders.com, the fastest growing tender information portal in India.

Expansion Joint Replacement Work At G - Station Jeel Ali Power Station Technical Specification And General Terms & Conditions Ti Tle: Expansion Joint Replacement At Whr # 31 For Dd Y Pass Stack # Total 1 Nos. Duration: Total 10 Days Max. Expansion Joint Specifi Cation: Store Code 3600022507 Doule Expansion Joint With Control Guide. Ptfe Coated Outer Elt With Insulation Olster And Joining Kit As Per Drawing# 12250-10 Rev A. Design Temp-600 Deg C, Pr -700Mm/-500Mm H20, 5907X6566, 6258X6258mm. Mfg -Whalco Or Equivalent. Scope Of Work: Method Statements To E Sumitted Prior To Start Of Work. Risk Analysis For Work To E Carried Out And Report To E Sumitted P Rior To Start Of Work. Moilize Men And Equipment. Toolox Talk For The Work To E Conducted And Copy To E Sumitted Priorstart Of Work . Removal Of Expansion Joint Flange Connection All The Removed Olt And Nuts Shall E Cleaned And Luricated Remove Faric Out Layer. Re Move Outer Olster Ag Remove Inner Olster Ag Cleaning Of Expansion Joints Ellow Connection Duct. Weld The Support-Holding Hook With C Asing For Inner Olster Fix The Inner Olster Fix The Outer Olster Fix The Faric Layer And Joining Y Welding Heat Sealing All The Ol Ts Nut To E Torque Tightened. Supplier Shall Ring All The Required Tools And Tackles For The Installation Dewa Will Not Provide Any Tools, Tackles, And Work Force. Housekeeping Of The Site And Proper Waste Disposal As Per Dewa Safety Rule. Work Completion Report S Hall E Sumitted With Detailed Description And Phots. Work Period # Total10 Days Warranty # One Year Technicalspecification And Gene Ral Terms & Conditions The Contractor Shall Visit The Site And Make Himself Fully Familiar With The Work Scope, Plant Access, Facili Ties, Complexities, Safety Measures Etc., Efore He Sumit His Id The Contractor Shall Sumit The Schedule Of Work The Period Efore Com Mencement Of The Work And Shall E Approved Y Dewa. Dewa Anticipates Maximum 3 Days All Dewa Safety & Environment Policy, Rules And R Egulation Shall E Followed At Work Site During The Execution Of The Work. The Contractor#S Engineer Should E Familiar With Safety Regulations While Working In A Hazardous Area. The Contractor Shall Arrange All Tools Required For The Contract. All Rigging And Tra Nsporting Equipment Should E Arranged Y The Contractor. These Rigging Toolsshould E Duly Tested And Certified Y The Third Party Ins Pection Agency And The Certificates Should E Produced On Demand. Contractor#S Supervisor Shall E Availale At Site Throughout The Per Iod Of Work. The Work Carried Out Y The Contractor Shall Carry A Warranty For One Year And The Contractor Shall Attend Any Defects C Ome Out Of Ad Workmanship Etc. Free Of Charge Within This Period. The Contractor Should Apply For The Permit To Work Well In Advance And This Request Shall E Followed With Method Statement, Risk Assessment As Attachments Hot Work Permit Should Apply On Daily Asis. Entry Permits For The Workers Should E Applied With Passport Copies Having Valid Visa. Entry Permits For The Vehicle Should E Appli Ed With Copies Of Police Vehicleregistration. All The Workers Should Wear The Uniform, Safety Shoes And Helmet While At Work. Tool Ox Talks Should E Given To The Workers Y Their Supervisor Efore Start Of Work. All Material And Tools Rought In Shall E Declared At Power Station Security Gate And The List Of These Items Shall E Signed Y Dewa Security. The Copies Of These Documents Shall E Lodge D With Dewa Engineer In-Charge On Daily Asis. This Document Will E The Asis For The Clearance Gate Pass To Take Them Out On Compl Etion Of The Jo. Dewa Scope: 1 Lc Arrangement. 2 Material: Expansion Joint, Nut Olts Etc. 3 Scaffolding Where Ever Required. 4 Entry Pass For Contractor. For Site Visit Contact 1 Arad A 0504611635, Hausahea@Dewa.Gov.Ae 2 Aasaithami 0508847736, Aasaithami.Raja@Dewa.Gov.Ae

GTN :14131617
Dubai - Dubai

GLOBAL Hire Our Expertise :

  • Tender Bidding
  • Tender Consultancy
  • Tender Advisory
  • Identify Eligibility Criteria
  • Identify Penelty Clauses
  • Highlight Important Dates
  • Technical Bid Preparation
  • Offline Bid Preparation
  • Online Bid Preparation
  • Offline Bid Submission
  • Online Bid Submission
  • Track Corrigendum / Addendums
  • Attend Pre Bid Meetings
  • Consistent Liaison & Coordination
  • EMD Follow Ups

GLOBAL - bidding
image

We heartily welcome your move to excel your business to new heights.

Set Tender Alert

Activate daily alerts to know the tenders available of your work.

Get alerts

Bidding Support

Ask experts, how to fill bid forms, submit bids, participate in bids.

Get in touch

GeM Registration

Looking for GeM Registration? Get in touch with us and we will do the needful.

Registration

Digital Certificate

Get DSC for e-Tendering, e-Auction, e-bidding, Corporations / Associations / Others Tenders

Purchase now

Tender Awards

Want to know who's got the tender and are looking for subcontracting?

Connect now

Projects

Government and other private players, Real-time Updates of Project Information

Get info

International Tenders

We almost cover all the regions and countries across the world. Click to take your business to new heights.

Start now

Web Design

Get the Best Offers & Deals, expertise in developing static websites, dynamic websites and e-commerce.

Design now