Bidding Support
Warm Greetings from www.thetenders.com, the fastest growing tender information portal in India.
Supply Of Pilot Pen V7 Blue, Black, Red, Pilot Pen V5 Blue Black, Red, Uni-Ball Eye Fine Pen Blue, Hi Tech Point Pen V7 Blue, Hi Tech Point Pen V5 Blue, Reynolds Ball Pen Blue, Black, Red, High-Tech Point Pen Size 0.5 Blue, Red, Green, Black, Luxor Sign Pen, Flair Writ Meter Pen, Permanent Marker, Sketch Pen, Jk Paper A4 Size, Slide Paper, Butter Paper, Gift Packing Paper, Ribbon Gift Pack Plastic All Colour, Gift Paper Transparent, Drawing Paper Roll, Hot Lamination Roll 18 Inch, Lamination Pouches A4 Size, Ivory Sheet A4, Ivory Chart Sheet, Ribbon 1Inch Red, Blue, Measuring Tape 30 Mtr, Double Side Tape, Dak Envelope With Cloth Yellow Fs Size, Dak Envelope 16X12, Do Envelope White, Colour Flag, Pencil Soft Apsara, Eraser Rubber, Sharpener, Highlighter All Colours, Glue Stick 25Gm, Whitener, Plastic U Clip, Binder Clip 19Mm, Binder Clip 25Mm, Binder Clip 32Mm, Colour Transparent Tape 0.5Inch Red, Black, Green, Blue, Colour Transparent Tape 1Inch Red, Black, Green, Blue, Colour Transparent Tape 1.5Inch Red, Black, Green, Blue, Packing Tape 2Inch, Packing Tape 3Inch, Register 400 Pages, Register 500 Pages, Cutter Large, Cutter Blade Large, Cutter Small, Cutter Blade Small, Stick Pad Yellow 3X5inch, Stick Pad Yellow 3X3inch, Room Fresher, Pencil Cell Aaa, Pencil Cell Aa, File Cover White With Hq 12 Corps Monogram, Drawing Sheet Yellow, Sky Blue, Thinner, Fevicol 500Gm, Stapler Pin 10 Nos, Stapler Pin 45 Nos, Spiral Binding Large
TRN :33351874
Central Government And Public Sector / Security Services
Jodhpur - Rajasthan
INDIAN Hire Our Expertise :
- Tender Bidding
- Tender Consultancy
- Tender Advisory
- Identify Eligibility Criteria
- Identify Penelty Clauses
- Highlight Important Dates
- Technical Bid Preparation
- Offline Bid Preparation
- Online Bid Preparation
- Offline Bid Submission
- Online Bid Submission
- Track Corrigendum / Addendums
- Attend Pre Bid Meetings
- Consistent Liaison & Coordination
- EMD Follow Ups