Thetenders.com
  +91 92760 83333 / +91 92743 15555
  • Indian Tenders
  • |
  • Global Tenders
  • |
  • Projects
  • |
  • Tender Awarded
  • |
  • Sub-Contractor
  • Pay Online
  • Register now
  • Login
  • Indian Tenders Tender information of India
  • Global Tenders International Tender information
  • Projects Project information of India
  • Tender Awarded Tender awarded information
  • Sub-Contractor Vendor information of India
  • Pay Online
  • Register now
  • Login
  • Contact Info All India : 9276083333 / 9274315555 South India : 9274315555
TheTenders
»
Indian Tenders
»
Keyword Tenders
»
Excavation
Filters
  • » By Keywords
  • » By Cities
  • » By States
  • » By Agencies
  • » By Sectors
  • » By Ownerships
  • Tender Value

List of excavation Tenders

List of latest excavation Tenders in Indian Tenders. Click on any excavation Tenders to view BOQ, NIT and Tender Documents. Get GeM Registration and Bidding Support, Vendor Registration for excavation Tenders.

Advance Search
  • All-Tenders (201)
  • |
  • Today's-Tenders
  • |
  • Active-Tenders
  • |
  • Closed-Tenders
151 Canal/Irrigation/Dam Work
image image
State Government
TRN :49024014 |  16 May, 2025
Tender Value : 28.56 Lacs
 Hamirpur - Uttar Pradesh
Tender for tender for barel pond, village- barel, block- rath - pond restoration work under rain water harvesting and ground water enrichment scheme - excavation in earthwork in mar, kabar, ranker and kankar mixed soil in digging including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (ch-4, 4.04(e)) 2 excavation in earthwork (by any means) in mar, kabar, ranker and kankar mixed soil in digging including lead up to 30m and lift (beyond 3.00m lift) including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.15) 3 excavation in earthwork (by any means) in mar, kabar, ranker and kankar removal of slus (excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.13) 4 excavation in earthwork (by any means) in mar, kabar, ranker and kankar sturated soil in digging including lead up to 30m and lift (beyond 3.00m lift) upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.17) 5 excavation in earthwork (by any means) in mar, kabar, ranker and kankar removal of slus (excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.12) 6 earthworki in foundation of wall piers abutments etc with disposal with in 30m lead and 1.5m lift by hydraulic/mechanical excavator id s.no. (b) 7 sand filling for foundation inlet, outlet, ramp 8 c.c. in 1:3:6 cement, sand and20-40mm gauge stone ballast including the cost of materials labours and etc. required for proper completion of work. 9 r.c.r. stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work. 10 supply of fixing of 1000mm dia np3 hume pipe with coller all cost complete. 11 c.c. in 1:2:4 cement, sand and10-20mm grit including the cost of materials labours and etc. required for proper completion of work. 12 plastering in 1:2 cement sand mortar including the cost of material labour etc. to required for proper completion of work. 13 dry stone boulder filling in chamber 14 dewatering during work by 8hp dp set
  • View Tender
  • Document
  • Bid Support
152 Agriculture
image image
Government Departments
TRN :49024029 |  21 May, 2025
Tender Value : 30.30 Lacs
 Pratapgarh - Uttar Pradesh
Tender for tender for link road chamir saraiya se pure rammu tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 excavation in foundation in ordinary soil 6 concrete in 1:6:12 in foundation 7 m 150 class brick work in 1:4 in foundation up to plinth 8 5 cm thick c.c thick cement concrete with all complete work 9 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 10 providing and laying of rubber moulded reflective zig-zag 80mm thick tiles of precast compressed c.c passing minimum 30mpa compressive strength isi marked concrete block pavements having thickness 80mm as per technical specaification clause 1504 11 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 12 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 13 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 14 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 15 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 16 s/f of 350 mm dia hume pipe 17 s/f of reflectivesign board,etc 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 19 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 20 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 21 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 22 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 % 23 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 1styear maintenance cost @ 0.00 % 24 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 2ndyear maintenance cost @ 0.25 % 25 the routing maintenance of above road including earthen shoulder andinterlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 3rdyear maintenance cost @ 0.50 % 26 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 4rdyear maintenance cost @ 0.75 % 27 the routing maintenance of above road including earthen shoulder and interlocking road etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for 5thyear maintenance cost @ 1.00 %
  • View Tender
  • Document
  • Bid Support
153 Municipal Corporation
image image
corporations/Associations/Others
TRN :49024032 |  24 May, 2025
Tender Value : 0
 Bijnor - Uttar Pradesh
Tender for tender for establishment/installation of open gym moh. dhuliyawala ward no.07 near railway station/gov hospital (chc) - excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : all kinds of soil pipes, cables etc, not exceeding 80 mm dia. dsr 2.10.1.1. 2 excating supplying and filling for local earth 3 1:4:8 derived from 4 reinforced cement concrete 5 steel reiforced for rcc work 6 laying of cc in 1:1:5:3 with cement corse sand 7 chest press 8 shoulder exerciser 9 abs board 10 aeril stroller 11 leg press double 12 sgoulder rwil double 13 di twister 14 surf boad 15 aero rider 16 walker 17 pull up sation 18 double parallel bar 19 add gst @ 18%
  • View Tender
  • Document
  • Bid Support
154 Agriculture
image image
Government Departments
TRN :49024051 |  21 May, 2025
Tender Value : 80.09 Lacs
 Allahabad - Uttar Pradesh
Tender for tender for link road kithawar market to basti hote hue primary school tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 6 excavation in foundation in ordinary soil 7 concrete in 1:6:12 in foundation 8 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 9 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 10 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 11 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 12 s/f of 350 mm dia hume pipe 13 s/f of reflectivesign board,etc 14 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 15 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 16 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 17 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 18 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 %
  • View Tender
  • Document
  • Bid Support
155 Canal/Irrigation/Dam Work
image image
State Government
TRN :49024060 |  16 May, 2025
Tender Value : 21.55 Lacs
 Hamirpur - Uttar Pradesh
Tender for tender for kherapati pond, village- bidokhar purai, block- sumerpur - pond restoration work under rain water harvesting and ground water enrichment scheme - excavation in earthwork in mar, kabar, ranker and kankar mixed soil in digging including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (ch-4, 4.04(e)) 2 excavation in earthwork (by any means) in mar, kabar, ranker and kankar mixed soil in digging including lead up to 30m and lift (beyond 3.00m lift) including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.15) 3 excavation in earthwork (by any means) in mar, kabar, ranker and kankar removal of slus (excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.13) 4 excavation in earthwork (by any means) in mar, kabar, ranker and kankar sturated soil in digging including lead up to 30m and lift (beyond 3.00m lift) upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.17) 5 excavation in earthwork (by any means) in mar, kabar, ranker and kankar removal of slus (excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.12) 6 earthworki in foundation of wall piers abutments etc with disposal with in 30m lead and 1.5m lift by hydraulic/mechanical excavator id s.no. (b) 7 sand filling for foundation inlet, outlet, ramp 8 c.c. in 1:3:6 cement, sand and20-40mm gauge stone ballast including the cost of materials labours and etc. required for proper completion of work. 9 r.c.r. stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work. 10 supply of fixing of 1000mm dia np3 hume pipe with coller all cost complete. 11 c.c. in 1:2:4 cement, sand and10-20mm grit including the cost of materials labours and etc. required for proper completion of work. 12 plastering in 1:2 cement sand mortar including the cost of material labour etc. to required for proper completion of work. 13 dry stone boulder filling in chamber 14 dewatering during work by 8hp dp set
  • View Tender
  • Document
  • Bid Support
156 Canal/Irrigation/Dam Work
image image
State Government
TRN :49024063 |  16 May, 2025
Tender Value : 27.57 Lacs
 Hamirpur - Uttar Pradesh
Tender for tender for patyora-1 cd new, sumerpur - check dam construction work under atal ground water scheme - e/w in excavation in mar & kawer soil0.00 to 1.50 meter earth work 2 1.50 mteter to 3.50 meter 3 in satureted soil 0.00 to 1.50 meter 4 s/f of ms sign board comp at 5 removal of slush 6 pakka workc.c. in 1:3:6 c/s 25-5040 mm s/b 7 r.c.r. stone masonary with (khanda stone) with cement mortar in 1:4 8 r.c.r. stone masonary with hard stone bolder in cement mortar in 1:4 9 c.c. in 1:2:4 c/s 10-20 mm stone grit 10 cement pointing in 1:2 (struck rised ) on stone masonary 11 cement plaster 1:2 on stone masonary 12 dry stone pitching 13 dewatering during work by 8.00 h.p. diesel pump set
  • View Tender
  • Document
  • Bid Support
157 Canal/Irrigation/Dam Work
image image
State Government
TRN :49024067 |  16 May, 2025
Tender Value : 25.40 Lacs
 Hamirpur - Uttar Pradesh
Tender for tender for chandpurwa cd new, sumerpur - check dam construction work under atal ground water scheme - e/w in excavation in mar & kawer soil0.00 to 1.50 meter earth work 2 1.50 mteter to 3.50 meter 3 in satureted soil 0.00 to 1.50 meter 4 s/f of ms sign board comp at 5 removal of slush 6 pakka workc.c. in 1:3:6 c/s 25-5040 mm s/b 7 r.c.r. stone masonary with (khanda stone) with cement mortar in 1:4 8 r.c.r. stone masonary with hard stone bolder in cement mortar in 1:4 9 c.c. in 1:2:4 c/s 10-20 mm stone grit 10 cement pointing in 1:2 (struck rised ) on stone masonary 11 cement plaster 1:2 on stone masonary 12 dry stone pitching 13 dewatering during work by 8.00 h.p. diesel pump set
  • View Tender
  • Document
  • Bid Support
158 Canal/Irrigation/Dam Work
image image
State Government
TRN :49024078 |  16 May, 2025
Tender Value : 25.51 Lacs
 Hamirpur - Uttar Pradesh
Tender for tender for gurkhura pond, village- baukhar, block- sarila - pond restoration work under atal groundwater scheme - excavation in earthwork in mar, kabar, ranker and kankar mixed soil in digging including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (ch-4, 4.04(e)) 2 excavation in earthwork (by any means) in mar, kabar, ranker and kankar mixed soil in digging including lead up to 30m and lift (beyond 3.00m lift) including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.15) 3 excavation in earthwork (by any means) in mar, kabar, ranker and kankar removal of slus (excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.13) 4 excavation in earthwork (by any means) in mar, kabar, ranker and kankar sturated soil in digging including lead up to 30m and lift (beyond 3.00m lift) upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.17) 5 excavation in earthwork (by any means) in mar, kabar, ranker and kankar removal of slus (excluding cost of dewatering) including lead up to 30m and lift upto 1.5m including dressing making profile and manual compaction but excluding mechnical compation. (upid si no. 4.12) 6 earthworki in foundation of wall piers abutments etc with disposal with in 30m lead and 1.5m lift by hydraulic/mechanical excavator id s.no. (b) 7 sand filling for foundation inlet, outlet, ramp 8 c.c. in 1:3:6 cement, sand and20-40mm gauge stone ballast including the cost of materials labours and etc. required for proper completion of work. 9 r.c.r. stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work. 10 supply of fixing of 1000mm dia np3 hume pipe with coller all cost complete. 11 c.c. in 1:2:4 cement, sand and10-20mm grit including the cost of materials labours and etc. required for proper completion of work. 12 plastering in 1:2 cement sand mortar including the cost of material labour etc. to required for proper completion of work. 13 dry stone boulder filling in chamber 14 dewatering during work by 8hp dp set
  • View Tender
  • Document
  • Bid Support
159 Canal/Irrigation/Dam Work
image image
State Government
TRN :49024084 |  16 May, 2025
Tender Value : 27.61 Lacs
 Hamirpur - Uttar Pradesh
Tender for tender for sahurapur cd new, sumerpur - check dam construction work under atal ground water scheme - e/w in excavation in mar & kawer soil0.00 to 1.50 meter earth work 2 1.50 mteter to 3.50 meter 3 in satureted soil 0.00 to 1.50 meter 4 s/f of ms sign board comp at 5 removal of slush 6 pakka workc.c. in 1:3:6 c/s 25-5040 mm s/b 7 r.c.r. stone masonary with (khanda stone) with cement mortar in 1:4 8 r.c.r. stone masonary with hard stone bolder in cement mortar in 1:4 9 c.c. in 1:2:4 c/s 10-20 mm stone grit 10 cement pointing in 1:2 (struck rised ) on stone masonary 11 cement plaster 1:2 on stone masonary 12 dry stone pitching 13 dewatering during work by 8.00 h.p. diesel pump set
  • View Tender
  • Document
  • Bid Support
160 Agriculture
image image
Government Departments
TRN :49024100 |  21 May, 2025
Tender Value : 48.96 Lacs
 Pratapgarh - Uttar Pradesh
Tender for tender for link road sadwa chandika ke gram sabha chatarpur khanderi to raghna hote hue mishran tak road construction work - earthwork in cutting or embankment /pattri in ordinary soil (loam, clay or sand) excavation to be done in the from of regular pits not exeeding 0.50m in depth and earthwork in embankment to be in 20cm layers including the ramming and dressing the surface to required levles and slopes and also including 1.50meter lift and 1000meter lead as directed by e/i including labour t&p etc required for proper completion of work (as per si no-253) 2 gsb- gramular sub-base with well graded material (table 400,1) a) by mix in place method contrcution of granular sub-base by providing well graded material spreading in unform layers with motor grader/tractor mounted appropriate equipment on prepaire suface maxing by mix in place method with rotavator at omc, and compacting with smooth roller to achieve the desired density, complete as per clause 401 3 wbm g-2 (inter coat)providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening /binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required dencity grading -2 as per technical specification clause 405 4 wbm g-3 - providing and laying spreading and compacting stone aggregates of specific sizes to water bound macadam specification incluidng spreading in uniform thickness hand packing rolling with smooth wheel roller 80-100 kn in stages to proper grade and camber applying and brooming stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required dencity as per technical specification clause 405 5 brick edging on both sides of metalled surface 12 cm deep & 8 cm wide with class m-150 bricks laid on edge and dry in proper grade and alignment including cost of all material, labour and t&p etc.complete and all taxes as per direction of e/i. 6 providing and applying primer coat with bitumen emulsion (ss-1) on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.75 kg / sqm using mechanical means. as per technical specification clause 502 including cost of bitumen emulsion (ss-1) 7 providing and applying tack coat with bitumen (vg-10)using bitumen pressure distributor at the rate of 0.35kg per sqm on the prepared bituminous surfacecleaned with hydraulic broom as per technical speicification clause 503 including cost of bitumen (vg-10) 8 providing, laying and rolling of open-graded premix carpet of 20mm thickness composed of 13.2 to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line grade and level to serve as wearing coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100kn static roller capacity finished to required lavel and grades to be followed by seal coat as per techincal specification clause 508 including cost of bitumen 9 providing and applying seal coat type c comprising of a layer of bituminous binder followed by a cover of stone chipping of specified grading and rolling with power roller 8-10 tonne kn static roller and finishing to required level and grades as per technical specification clause 510 including cost of bitumen 10 s/f of 350 mm dia hume pipe 11 s/f of reflectivesign board,etc 12 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for1 st year maintenance cost @ 0.0 % 13 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for2nd year maintenance cost @ 0.75 % 14 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for3rd year maintenance cost @ 1.50 % 15 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for4thyear maintenance cost @ 2.25 % 16 the routing maintenance of above road including earthen shoulder and bitumenous pavement etc of to the required standards and it the manner as defined in cb condition and keep the entire road surfaceand structure in defect free condition during the entire maintenace period which begins from the actual completion data and ends after five years (including cost of material t&p labour but excluding gst) for5thyear maintenance cost @ 3.00 %
  • View Tender
  • Document
  • Bid Support
  • 1
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • Tenders Expired In - 2025
  • Tenders Expired In - 2024
  • Tenders Expired In - 2023
  • Tenders Expired In - 2022
  • Tenders Expired In - 2021
  • Tenders Expired In - 2020
  • Tenders Expired In - 2019
  • Tenders Expired In - 2018
  • Tenders Expired In - 2017
  • Tenders Expired In - 2016
  • Tenders Expired In - 2015
Related Searched Keywords : excavation
  • Pit Work Tenders ,
  • Earth Pit Tenders ,
  • Earth Pit Repair Tenders ,
  • Earth Excavation Tenders ,
  • Soak Pit Repair Tenders ,
  • Neutralizing Pit Tenders ,
  • Pit Line Repair Tenders ,
  • Excavation Service Tenders ,
  • Soaking Pit Repair Tenders ,
  • Fire Pit Tenders

Get excavation Tender Alert...

933395

Related Searched Keywords : excavation

  • Interlock Paver Tenders From Maharashtra
  • Culverts Tenders From Delhi
  • End Wall Tenders From West-Bengal
  • Fencing Work Tenders From -Tamil-Nadu
  • Development Work Tenders From Andhra-Pradesh
  • Acoustic Work Tenders From Gujarat
  • Land Development Work Tenders From Karnataka
  • Gate Lodge Tenders From Uttar-Pradesh
  • Canal Works Tenders From Rajasthan
  • Canal Work Tenders From Madhya-Pradesh

Read More


Tender Document

205715

State Tenders »

  • Maharashtra Tenders
  • Delhi Tenders
  • West Bengal Tenders
  • Tamil Nadu Tenders
  • Andhra Pradesh Tenders

City Tenders »

  • Hyderabad Tenders
  • Visakhapatnam Tenders
  • Guwahati Tenders
  • Patna Tenders
  • Chandigarh Ut Tenders

Keyword Tenders »

  • Infrastructural Works Tenders
  • Infrastructures Work Tenders
  • Table Tenders
  • False Ceiling Tenders
  • Tile Works Tenders

Sector Tenders »

  • Drugs And Pharmaceuticals Tenders
  • Survey Work Tenders
  • Shipping Transport Tenders
  • Scientific Research And Instruments Tenders
  • Security Services Tenders

Ownership Tenders »

  • Central Government And Public Sector Tenders
  • Co Operative Tenders
  • Corporations And Associations And Others Tenders
  • Private Sector Tenders
  • State Government Tenders

Indian Segment

  • State Tenders
  • City Tenders
  • Industry Tenders
  • SubIndustry Tenders
  • Sector Tenders
  • Ownership Tenders
  • Agency Tenders
  • Keyword Tenders
  • Source of Tenders

Browse Tenders

  • RFP-RFQ Tenders
  • Vender Registration Tenders
  • ICB Tenders
  • NCB Tenders
  • Auction Tenders
  • Corrigendum Tenders
  • E Procurement Tenders
  • GeM Tenders (Registration)

Global Segment

  • Middle East Countries Tenders
  • European Countries Tenders
  • African Countries Tenders
  • Asian Countries Tenders
  • Saar Countries Tenders
  • Australia Oceania Countries Tenders
  • South America Countries Tenders
  • North America Countries Tenders

Others

  • Services
  • Sitemap
  • About Us
  • Contact Us
  • Career
  • Tender Consultants

Get in touch with us

  • +91-92760 83333 (In India)
    +91-92743 15555 (South India)

  • sales@thetenders.com / ceo@thetenders.com

W B


Copyright ©2018 - Thetenders.com. Read Policies

Download Mobile App