You have searched for power-plant in Projects. Click on any project to view further details.

11 Kvk Nilachal Power Private Limited For Setting Up A Coal Based Power Unit At Bhubaneswar In Khurda District Orissa
Project No # 24351 |  Khurda - Orissa
Project Cost :   Rs 8, 500.00 Crore
Posted Date :   25 Jun, 2019
kvk nilachal power private limited for setting up a coal based power unit at bhubaneswar in khurda district orissa
12 Pinggao Group Co. Ltd. For Establishing The Transmission System To Evacuate The Electricity Generated At The Proposed 1000 Mw Maithon Right Bank Thermal Power Project.
13 Construction Of Transmission Lines Associated With Kundankulam Power Project In Tamil Nadu.
Project No # 24348 |  Tirunelvelli - Tamil Nadu
Project Cost :   NA
Posted Date :   25 Jun, 2019
construction of transmission lines associated with kundankulam power project in tamil nadu.
14 Db Power Madhya Pradesh Limited For Setting Up A Coal Based Power Unit With A Capacity Of 1, 320 Mw 2X660 Mw At Singroli In Sidhi
Project No # 24346 |  Singrauli - Madhya Pradesh
Project Cost :   Rs 6, 000.00 Crore
Posted Date :   25 Jun, 2019
db power madhya pradesh limited for setting up a coal based power unit with a capacity of 1, 320 mw 2x660 mw at singroli in sidhi
15 Gmr Infrastructure, Is Setting Up A 1, 370 Mw 2X685 Mw Coal Based Thermal Power Unit At Raikheda Village In Raipur District Chhattisgarh
Project No # 24345 |  Raipur - Chhattisgarh
Project Cost :   Rs 6, 000.00 Crore
Posted Date :   25 Jun, 2019
gmr infrastructure, is setting up a 1, 370 mw 2x685 mw coal based thermal power unit at raikheda village in raipur district chhattisgarh
16 Larsen And Toubro Ltd Has Secured An Engineering, Procurement And Construction Epc Order To Set Up A Two X 660 Mw Ultra-Supercritical Power Plant In Buxar District, Bihar.
17 Setting Up Seven Waste To Energy Plants In The State. The First Plant Will Be Set Up At Njeliyanparama In Kozhikode On The 12.67 Acre Plot That The Kozhikode Kerala
18 Welspun Corp Will Also Sell 43 Mw Power Plant To Welspun Captive Power Generation Wcpgl
Project No # 24201 |  Multi Location - Multi State
Project Cost :   Rs 66.9 Crore.
Posted Date :   03 Apr, 2019
welspun corp will also sell 43 mw power plant to welspun captive power generation wcpgl
19 Construction For Kameng Hydro Electric Project At Kimi In Arunachal Pradesh
Project No # 24182 |  Itanagar - Arunachal Pradesh
Project Cost :   NA
Posted Date :   28 Mar, 2019
construction for kameng hydro electric project at kimi in arunachal pradesh
20 Envisages Supply, Installation, Commissioning And Testing Of Fgd System For 500 Mw Unit No 6 Of Ukai Thermal Power Station Tps And Two X 250 Mw Unit No 3 & 4 Of Sikka Thermal Power Station Tps With Comprehensive O&M Contract In Gujarat.

Set Upcoming Power Plant Project Alert...

655431

Advertisment