You have searched for bridge in Projects. Click on any project to view further details.

1 Construction Of Dhola-Sadia Ghats Bridges In Length Of 9.15 Km
Project No # 24653 |  Tinsukia - Assam
Project Cost :   9459600000
Posted Date :   21 Mar, 2020
construction of dhola-sadia ghats bridges in length of 9.15 km
2 Cable Stayed Bridge Chambal Project-Rj 5
Project No # 24650 |  Kota - Rajasthan
Project Cost :   2813100000
Posted Date :   21 Mar, 2020
cable stayed bridge chambal project-rj 5
3 Rfeoi For Bridge Project In Sierra Leone
Project No # 24354 |  Sierra Leone - Sierra Leone
Project Cost :   NA
Posted Date :   25 Jun, 2019
rfeoi for bridge project in sierra leone
4 Construction Of Road Over Bridges Robs In Maharashtra.
Project No # 24284 |  Pune - Maharashtra
Project Cost :   Rs 99.36 Crore
Posted Date :   10 May, 2019
construction of road over bridges robs in maharashtra.
5 Construction Of Two Lane Road Over Bridge Rob Including Approaches In Lieu Of Existing Level Crossing Lc Nos 150 At Railway 278 Km/14-16 Dfcc Ch 28967.59 Between Gothangam-Sayan Stations And 156 At Railway 287 Km/11-13 Dfcc Ch 37875.65 Between Kudsad-Saya
6 Construction Of 1.53 Km Three Lane Uni-Directional Flyover At Pallavaram On The Gst Road In Tamil Nadu Is Likely To Be Completed By The End Of 2019.
7 Upgrading Four Lane Road From Naya Chowk Chitarpur Nh-320-Sandi On Mdr-95 And Sandi-Rajrappa Road Mdr-95 In Total Length Of 10.13 Km Along With Construction Of A Bridge In Hazaribagh District Jharkhand.
8 Strengthen Reconstruct Mahuda-Sindri Jamadoba Road Length, 22.94 Km Alongwith Construction Of Two High-Level Bridges In Dhanbad District Of Jharkhand Under Plan Head For The Year 2018-19.
9 Construction Of Proposed High-Level Bridge In Mugma-Chirkunda Mdr-62 Road Over Barakar River In Dhanbad District Of Jharkhand.
Project No # 24205 |  Dhanbad - Jharkhand
Project Cost :   Rs 53.76 Crore
Posted Date :   04 Apr, 2019
construction of proposed high-level bridge in mugma-chirkunda mdr-62 road over barakar river in dhanbad district of jharkhand.
10 Construction Of Eight-Lane Road-Over- Bridge Rob Between Sone Nagar-Baghabishunpur Railway Stations In Sonenagar-Garhwa Section
Project No # 24189 |  Garhwa - Jharkhand
Project Cost :   Rs 108.17 Crore
Posted Date :   30 Mar, 2019
construction of eight-lane road-over- bridge rob between sone nagar-baghabishunpur railway stations in sonenagar-garhwa section

Set Upcoming Bridge Project Alert...

720154

Advertisment