21 Karaikal Port Plans To Develop Three Million Tonne Per Annum Mtpa Capacity Lng Terminal.
Project No # 12832 |  Karaikal - Puducherry
Project Cost :   Rs. 2, 500.00 Crores
Posted Date :   29 Sep, 2015
karaikal port plans to develop three million tonne per annum mtpa capacity lng terminal.
22 Development Of Lng Terminal At Mangaluru Port, Dakshina Kannada
Project No # 12772 |  Kannada - Karnataka
Project Cost :   NA
Posted Date :   29 Sep, 2015
development of lng terminal at mangaluru port, dakshina kannada
23 Dhamra Lng Terminal Plans To Set Up An Onshore Lng Regasification Terminal At Dhamra Port, Bhadrak
Project No # 12504 |  Bhadrak - Orissa
Project Cost :   NA
Posted Date :   28 Sep, 2015
dhamra lng terminal plans to set up an onshore lng regasification terminal at dhamra port, bhadrak
24 Ioc Plans To Set Up Lng Terminal Within Dhamra Port.
Project No # 11756 |  Bhadrak - Orissa
Project Cost :   Rs. 10, 000.00 Crores
Posted Date :   23 Sep, 2015
ioc plans to set up lng terminal within dhamra port.
25 Construction Of Pipeline From Gojalia Gas Ggs To Otpc Gas Terminal At Palatana.
Project No # 11628 |  Agartala - Tripura
Project Cost :   NA
Posted Date :   23 Sep, 2015
construction of pipeline from gojalia gas ggs to otpc gas terminal at palatana.
26 Adag Plans To Build A Floating Storage And Re-Gasification Unit Fsru In Bangladesh.
Project No # 11354 |  Bangladesh - Bangladesh
Project Cost :   NA
Posted Date :   22 Sep, 2015
adag plans to build a floating storage and re-gasification unit fsru in bangladesh.
27 Mumbai Port Trust Is Setting Up A Lng Terminal And Floating Storage And Re-Gasification Unit
Project No # 11343 |  Mumbai - Maharashtra
Project Cost :   Rs. 2, 740.00 Crores
Posted Date :   22 Sep, 2015
mumbai port trust is setting up a lng terminal and floating storage and re-gasification unit
28 H-Energy Gateway Plans To Set Up Lng Terminal At Jaigadh Port.
Project No # 11341 |  Ratnagiri - Maharashtra
Project Cost :   NA
Posted Date :   22 Sep, 2015
h-energy gateway plans to set up lng terminal at jaigadh port.
29 Andhra Pradesh Gas Distribution Plans To Set Up Fsru Lng Terminal Project In Andhra Pradesh.
Project No # 11340 |  Kakinada - Andhra Pradesh
Project Cost :   Rs. 40, 000.00 Million
Posted Date :   22 Sep, 2015
andhra pradesh gas distribution plans to set up fsru lng terminal project in andhra pradesh.
30 Ratnagiri Gas Plans To Double Capacity Of Lng Terminal At Dabhol Facility.
Project No # 11337 |  Ratnagiri - Maharashtra
Project Cost :   NA
Posted Date :   22 Sep, 2015
ratnagiri gas plans to double capacity of lng terminal at dabhol facility.