83Construction Of Two Laning With Paved Shoulders Of Palamaneru- Krishnagiri Border Section, Nh-42 Old Nh-219 From 58.60 Km To 140.75 Km In On Epc Basis. Sms Infrastructure Is The Epc Contractor For The Project In Andhra Pradesh.
88Construction Of Two Lane Road Over Bridge Rob Including Approaches In Lieu Of Existing Level Crossing Lc Nos 150 At Railway 278 Km/14-16 Dfcc Ch 28967.59 Between Gothangam-Sayan Stations And 156 At Railway 287 Km/11-13 Dfcc Ch 37875.65 Between Kudsad-Saya
90Widening And Strengthening Of 24.99 Km Stretch In The State. The Work Will Be Carried Out On Gura Musabani-Dumaria-Asthi-Koima Road-Jiyan-Dhalbhumgarh National Highway Nh-33 Road In Length Of 24.99 Km.