You have searched for Projects of road From road in Projects. Click on any project to view further details.

81 Barmer Oil Refinery Project In Rajasthan Back On Track
Project No # 24336 |  Barmer - Rajasthan
Project Cost :   Rs 43, 129 Crore
Posted Date :   25 Jun, 2019
barmer oil refinery project in rajasthan back on track
82 Db Realty And Rmz Corp Have Agreed To Jointly Develop The Land Into The Countrys Largest Corporate Office Park In Mumbai Maharashtra.
Project No # 24321 |  Mumbai - Maharashtra
Project Cost :   Rs 21, 000 Crore
Posted Date :   14 Jun, 2019
db realty and rmz corp have agreed to jointly develop the land into the countrys largest corporate office park in mumbai maharashtra.
83 Construction Of Two Laning With Paved Shoulders Of Palamaneru- Krishnagiri Border Section, Nh-42 Old Nh-219 From 58.60 Km To 140.75 Km In On Epc Basis. Sms Infrastructure Is The Epc Contractor For The Project In Andhra Pradesh.
84 Upgradation Of Madanapalli-Punganuru-Palamaneru Road Section In The State On Epc Mode.
Project No # 24301 |  Vijayawada - Andhra Pradesh
Project Cost :   Rs 275.19 Crore
Posted Date :   22 May, 2019
upgradation of madanapalli-punganuru-palamaneru road section in the state on epc mode.
85 Widening And Strengthening Of Manuwapul-Yogapatti-Nawalpur-Ratwal Chowk Road In Length Of 37.01 Km In Bihar Under The Central Road Fund Crf.
86 Wadhwa Group Has Developed A Residential Complex Aquaria Grande At D N Mhatre Road, Borivali West In Mumbai, Maharashtra.
87 Construction Of Road Over Bridges Robs In Maharashtra.
Project No # 24284 |  Pune - Maharashtra
Project Cost :   Rs 99.36 Crore
Posted Date :   10 May, 2019
construction of road over bridges robs in maharashtra.
88 Construction Of Two Lane Road Over Bridge Rob Including Approaches In Lieu Of Existing Level Crossing Lc Nos 150 At Railway 278 Km/14-16 Dfcc Ch 28967.59 Between Gothangam-Sayan Stations And 156 At Railway 287 Km/11-13 Dfcc Ch 37875.65 Between Kudsad-Saya
89 Upgrading Kowali To Dumaria Road In Length Of 32.80 Km In Purbi Singhbhum District Of Jharkhand.
Project No # 24270 |  Singhbhum - Jharkhand
Project Cost :   Rs 64.50 Crore
Posted Date :   03 May, 2019
upgrading kowali to dumaria road in length of 32.80 km in purbi singhbhum district of jharkhand.
90 Widening And Strengthening Of 24.99 Km Stretch In The State. The Work Will Be Carried Out On Gura Musabani-Dumaria-Asthi-Koima Road-Jiyan-Dhalbhumgarh National Highway Nh-33 Road In Length Of 24.99 Km.