You have searched for runway in Projects. Click on any project to view further details.

1 Extension Of Runway With Blast Pad, Resa, Taxiway, Apron, Gse Area, Isolation Bay, Construction Of New Domestic Terminal Building, Atc Tower Cum Technical Block Cum Fire Station And Other Miscellaneou
2 Construction Of New Taxi-Track And Strengthening Of Runway At Lgbi Airport Assam
Project No # 24019 |  Guwahati - Assam
Project Cost :   Rs 258.42 Crore
Posted Date :   13 Feb, 2019
construction of new taxi-track and strengthening of runway at lgbi airport assam
3 Construction Of Runway At Chaudhary Charan Singh Airport, Amausi.
Project No # 23594 |  Lucknow - Uttar Pradesh
Project Cost :   Rs 550.00 Million
Posted Date :   09 Oct, 2018
construction of runway at chaudhary charan singh airport, amausi.
4 Construction Of A Realigned Runway At The Cape Town International Airport Ctia.
Project No # 23092 |  South Africa - South Africa
Project Cost :   NA
Posted Date :   30 May, 2018
construction of a realigned runway at the cape town international airport ctia.
5 Expansion Of Runway At Chaudhary Charan Singh Airport, Amausi.
Project No # 22017 |  Lucknow - Uttar Pradesh
Project Cost :   Rs. 550.00 Crores
Posted Date :   24 May, 2018
expansion of runway at chaudhary charan singh airport, amausi.
6 Construction Of Shire And Jinka Airport Runways In Ethiopia.
Project No # 20666 |  Ethiopia - Ethiopia
Project Cost :   NA
Posted Date :   11 Nov, 2017
construction of shire and jinka airport runways in ethiopia.
7 Construction Of A Second Runway At The Nnamdi Azikiwe International Airport, Abuja.
Project No # 19998 |  Nigeria - Nigeria
Project Cost :   NA
Posted Date :   14 Jun, 2017
construction of a second runway at the nnamdi azikiwe international airport, abuja.
8 Maharashtra Airport Devp Co Plans For Extension Of Existing Runway And Apron Area.
Project No # 19572 |  Nasikcity - Maharashtra
Project Cost :   Rs. 42.12 Crores
Posted Date :   13 Jun, 2017
maharashtra airport devp co plans for extension of existing runway and apron area.
9 Extention Of The Runway Length From The Existing 8, 300 Ft To 10, 000 Ft.
Project No # 17337 |  Mangalore - Karnataka
Project Cost :   NA
Posted Date :   30 Aug, 2016
extention of the runway length from the existing 8, 300 ft to 10, 000 ft.
10 Integrated Aviation Hub At Hisar.
Project No # 17128 |  Hisar - Haryana
Project Cost :   NA
Posted Date :   29 Aug, 2016
integrated aviation hub at hisar.

Set Upcoming Runway Project Alert...

717362

Advertisment