37061 Cleaning and removal of spillage coal from transfer point below discharge point of 10D, 32LN and panel 34 belt and below belt conveyor of 4A seam at Haldibari UG Mine.
37062 Periodical shifting of gate end box, drill machine and their cables and support of cables within the district Shifting of main ACB coupled ACB with 100m armoured cables Shifting of auxiliary fan with air duct of 100m length
37063 Construction of 23 nos RCC sectionalisation stoppings to isolate 72LW, 78LW and 84LW panel in V top seam of Baherabandh UG Mine of Hasdeo Area.
37064 Transportation and installation of 23 nos 800mm pony belt conveyor 80mtr each length in proposed 4J-2a sub panel of 4J-2 dep. Panel in 4A seam at Jhiria UG Mine of Hasdeo Area.
37065 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Choita River from ch. 0.00 km. to 5.00 km within Block & P.S.-Gaighata ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
37066 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Padma Nallah from ch. 0.00 km. to 3.60 km. Including 02(two) nos. Jhil within Habra & Ashokenagar Municipal area and Block-Habra-I & II, P.S.-Habra ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
37067 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Panshila Khal from ch. 0.00 km. to 5.00 km within Block & P.S.-Gaighata ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
37068 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Parbati Khal from ch. 0.00 km. to 10.00 km within Block & P.S.-Bongaon ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
37069 Clearing and removing of water hyacinth under A.M.C for a period of 08 months(from May’2020 to December’2020 ) from 19.75 Km to 22.10 Km over river Nonagang in P.S Barasat and Habra Dist. North 24 parganasunder Barasat Drainage Sub-division of Bidyadhari Drainage Division.
37070 Clearing and removing of water hyacinth under A.M.C for a period of 08 months(from May’2020 to December’2020 ) from 17.70 Km to 19.70 Km over river Nonagang in P.S Barasat and Habra Dist. North 24 parganasunder Barasat Drainage Sub-division of Bidyadhari Drainage Division.