411Widening, Improvements, Improvements to Riding Quality to Government Roads including construction of Retaining Wall , Widening of Culvert and up keeping the roads for a period of 60 months in Palacode (H) C&M Sub Division (Package 56)
The Following works are involved in this package
1. Widening from Intermediate lane to Two lane and Improvements of Morappur - Marandahalli road at km 22/4 - 23/700, 37/700 - 38/0 and 38/300 - 38/4 and including Construction of Retaining wall at km 23/6 (MD 271) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1360)
2.Widening from Intermediate lane to Two lane and Improvements of Morappur - Marandahalli road at km 40/2 - 40/8 and 41/6 - 42/8 and including widening of culvert at km 41/8 (MD 271) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1362)
3.Widening from Intermediate lane to Two lane and Improvements of Morappur - Marandahalli road at km 43/2 - 43/8, 44/2 - 44/6 and 45/6 - 46/4 and including widening of culverts at km 43/4 and 46/2(MD 271) including upkeeping for a period of 60 (01-CRIDP-19-20-M-1364)
4.Improvements to Riding Quality at km 114/930 - 115/8 and 117/0 - 118/310 of Karimangalam State Highways road (SH 20) including upkeeping for a period of 60 Months. (01-CRIDP-19-20-I-4595)
5.Improvements to Riding Quality at Km 41/0 - 41/6, 45/0 - 45/6 of Morappur - Marandahalli road (MD-271) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4603)"
TRN :
733472
|
Salem - Tamil Nadu
Contract Value :
6.02 Crore |Agency Name :
Highway Department
412Widening, Improvements, Widening the Curve, Junction Improvements, Improvements to Riding Quality to Government Roads including widening Box culvert Reconstruction of culvert Construction of Drain, Culvert, Retaining wall Providing RCC Center Median and up keeping the roads for a period of 60 months in Dharmapuri (H) C&M Sub Division (Package54)
The Following works are involved in this package
1) Widening from Two lane to Four lane and Improvements of Dharmapuri State Highways (Old NH-7) road at Km.138/2-138/4 and including Widening of Box Culvert at Km.138/4, Construction of Drain at Km.137/2-137/340, 137/560-137/680 and Providing RCC Centre Median (SH-14) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0451)
2) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.147/0-147/6 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0456)
3) Widening the curve and Improvements at Km.59/4-59/8 of Hogenakkal - Pennagaram - Dharmapuri - Thirupathur road and including construction of Box culvert, Retaining wall & junction improvements at Km.59/6 (SH-60) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0457)
4) Construction of Retaining Wall at Km.16/6 of Bommidi R.S - Thoppaiyar road and Reconstruction of Culvert at Km.5/10, 6/8, 7/8, 8/8 and Construction of Culvert at Km.6/4 and Construction of Box Culvert at Km.8/2 (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1397)
5) Improvements to Riding Quality at Km.5/6-8/8 of Bommidi R.S. to Thoppaiyar road (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4609)
6) Widening from End to End and Improvements of Dharmapuri Bus Stand Approach road at Km.0/0-0/4 including Construction of Box Culvert at Km.0/2 and Construction of Drain and Providing RCC Centre Median at Km.0/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2691)"
TRN :
718799
|
Salem - Tamil Nadu
Contract Value :
6.02 Crore |Agency Name :
Highway Department
413Widening and Improvements, Improvements to Riding Quality, Reconstruction of RCC Slab Culverts, Reconstruction of Box Culverts and including Up Keeping for a period of 60 months on Government Roads in Kulithalai (Highways), C&M, Sub Division. Package No.30
A) Widening from Two lane to three lane and Improvements of Allithurai - Thogamalai road Km 32/4-33/520 (MD 12) including upkeeping for a period of 60 Months
B) Improvements to Riding Quality at Km 21/0-24/0 of Pettavaithalai - Nangavaram-Kavalkaranpatty Road (MD 658) including upkeeping for a period of 60 Months
C) Improvements to Riding Quality at Km 24/0-26/4 of Pettavaithalai - Nangavaram-Kavalkaranpatty Road MD 658) including upkeeping for a period of 60 Months
D) Reconstruction of RCC slab culvert at Km 0/10 of Poyyamani - Inungur road
E) Reconstruction of RCC slab culvert at Km 1/6 of Kavundampatty - Koppu road
F) Reconstruction of RCC slab culvert at Km 2/2 of Kavundampatty - Koppu road
G) Reconstruction of Box culvert at Km 3/2 of of Kavundampatty - Koppu road
H) Improvements of Vadaseri road at Km 0/0-5/8 of including Reconstruction of RCC Slab Culvert at Km 1/10,4/8 including upkeeping for a period of 60 Months
I) Improvements to Riding Quality of Old mangama road at Km 24/0-26/0 including upkeeping for a period of 60 Months"
TRN :
720116
|
Tirupur - Tamil Nadu
Contract Value :
5.53 Crore |Agency Name :
Highway Department
414Strengthening, Improvements and Improvements to Riding Quality to Government Roads including CD works and up keeping the roads for a period of 60 months in Krishnagiri (H) C&M Sub Division (Package 74)
The Following works are involved in this package
1. Strengthening of Sappanipatti - Panandhur - Bandarahalli road at km 0/0-2/0 Including CD works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2738)
2. Strengthening of Sappanipatti - Panandhur - Bandarahalli road at km 2/0-4/0 Including CD works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2739)
3. Improvements of Sokkadu - KRP Dam road at km 6/0-9/5 Including CD works including upkeeping for a period of 60 months.(01-CRIDP-19-20-O-2740)
4. Improvements of Kannampalli Temple road km 1/6-3/2 including Retaining wall including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2741)
5. Improvements of Sappanipatti - Panandhur - Bandarahalli road at km 4/0-6/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-A182742)
6. Improvements to Riding quality at km 0/0-3/0 of Sokkadu - KRP Dam road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4646)
7. Improvements to Riding quality at Km 0/0-2/0 of Kaveripattinam-Panagamutulu road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4650)
8. Improvements to Riding quality at Km 0/0-2/4 of Sentharapalli-Nakkalpatti-Majeethgollahalli road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4658)
9. Improvements to Riding quality at Km 1/6-5/4 of Vellampatti-Veramalai Road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4663 )"
TRN :
723945
|
Salem - Tamil Nadu
Contract Value :
7.34 Crore |Agency Name :
Highway Department
415Providing Gantry Board including Road Furniture in Dharmapuri (H) C&M Division (Package 86)
The Following works are involved in this package
1) Providing Over Gantry Board at Km 132/500, 148/150, 136/2 (2 Nos.) of Varanasi - Kanyakumari Road (Abandoned NH7) Dharmapuri town limit (SHU 129) Including Road Furniture (01-CRIDP-19-20-S-0458)
2) Providing Metal Crash Barrier at Km 42/2 (60m), 42/4 (125m), 42/6 (98m) & 57/4 (167m) of Omalur Mecheri - Pennagaram (Via) Perumbalai road (SH 221) (01 -CRIDP - 19-20-S-0459)
3) Providing Over Head Gantry board at Km 57/4 of Omalur Mecheri - Pennagaram (Via) Perumbalai road (SH 224) Including road furniture. (01 -CRIDP - 19-20-S-0460)
4) Providing Cantilever Gantry board at km 25/6,25/8,26/2,37/6 of Dharmapuri - Harur (via) Morappur Road (SH-60 A) Including Road Furniture.(01-CRIDP-19-20-S-0461)
5) Providing Over Head Gantry board at km 75/4 of Thiruvannamalai - Arur (via)Thanipadi Road (SH 6A) Including Road Furniture. (01-CRIDP-19-20-S-0462)
6) Providing Cantilever Gantry board at km 10/8, 13/8, 24/2 of Pappireddipatti - Morappur road (via) Pallipatti, Thenkaraikottai (MD 328 A) Including Road Furniture. 01-CRIDP-19-20-M-1382)
7) Providing Cantilever Gantry board at km 0/2 & 18/8 of Mallapuram - Mookanur road (MD 237) Including Road Furniture. (01-CRIDP-19-20-M-1383)
8) Providing Over Head Gantry board at km 0/2 of Pappireddipatti - Mallapuram road (MD 328) Including Road Furniture. (01-CRIDP-19-20-M-1384)
9) Providing Cantilever Gantry board at km 17/4 & 18/10 of Pappireddipatti - Mallapuram road (MD 328) Including Road Furniture. (01-CRIDP-19-20-M-1385)
10) Providing Cantilever Gantry board at km 11/2 of Mookanur - Harur road (MD 777) Including Road Furniture. (01-CRIDP-19-20-M-1386)
11) Providing Over Head Gantry board at km 0/2 of Mookanur - Harur road (MD 777) Including Road Furniture. (01-CRIDP-19-20-M-1387)
12) Providing Over Head Gantry board at Km 0/8 & 1/8 of Pennagaram - Bye pass road (MD 349) Including road furniture.(01 -CRIDP - 19-20-M-1388)
13) Providing Cantilever Gantry board at km 0/4 of Morappur - Marandahalli Road (MD 271) Including Road Furniture. (01-CRIDP-19-20-M-1389)
14) Providing Over Head Gantry board at km 12/6 & 13/8 of Morappur - Marandahalli Road (MD 271) Including Road Furniture. (01-CRIDP-19-20-M-1390)
15) Providing Over Head Gantry board at km 0/2 & 2/4 of Harur bye pass Road (MD 121) Including Road Furniture. (01-CRIDP-19-20-M-1391)
16) Providing Cantilever Gantry board at km 24/6 of Mookanur - Harur Road (MD 777) Including Road Furniture. (01-CRIDP-19-20-M-1392)
17) Providing Over Head Gantry board at km 29/10 of Pappireddipatti - Morappur (via) Pallipatti,Thenkaraikottai road (MD 328 A) Including Road Furniture. (01-CRIDP-19-20-M-1393)
18) Providing Over Head Gantry board at km19/4, 41/4, 44/10 of Morappur-Marandahalli road (MD 271) Including Road Furniture. (01-CRIDP-19-20-M-1394)
19) Providing Metal Crash Barrier at Km 0/6-1/2 (L/s) of Pennagaram - Mudugampatti - Malaiyanur road.(MD 859) (01 -CRIDP - 19-20-M-1395)
20) Providing Metal Crash Barrier at Km 3/8-4/350 of Nallampalli Mittareddihalli (via) Laligam road (01-CRIDP-19-20-O-2708)
21) Providing Metal Crash Barrier at Km 7/4-8/0 of Dharmapuri - Hogenakkal road to Kalegoundanur (Via) Karubainahalli road (01-CRIDP-19-20-O-2709)
22) Providing Cantilever Gantry board at km 24/4 of Mallapuram - Gopinathampatti road. Including Road Furniture. (01-CRIDP-19-20-O-2710)
23) Providing Metal crash barrier at km 16/2, 16/4, 17/2, 17/8, 18/2, 18/4, 18/6, 20/2, 21/4, 23/6 of Harur - Sitheri road. (01-CRIDP-19-20-O-2711)
24) Providing Over Head Gantry board at km 0/2 of Morappur - Kallavi Road Including Road Furniture. (01-CRIDP-19-20-O-2714)
25) Providing Over Head Gantry board at km 0/2 of Kambainallu - Irumathur Road Including Road Furniture. (01-CRIDP-19-20-O-2715)
26) Providing Metal Crash Barrier at Km3/0-4/0 of Palacode - Erumampatti road . (01-CRIDP-19-20-O-2716)
27) Providing Metal Crash Barrier at Km 0/8, 1/2, 1/4-1/10, 2/4-2/10 of Pikkili-Gollapatti road . (01-CRIDP-19-20-O-2717)"
TRN :
733473
|
Salem - Tamil Nadu
Contract Value :
5.67 Crore |Agency Name :
Highway Department
416Widening, Strengthening, Junction Improvements, Improvements to Riding quality, Paver Block and Culvert including upkeeping works for 60 Months in Vridhachalam (H) C&M Subdivision Jurisdiction (Package-67)
A-Widening from Intermediate lane to double lane and strengthening of Vridhachalam kattukudalore Road at km.3/0-4/0 including Reconstruction of box culvert at km 3/6 (MD-815) including upkeeping for a period of 60 months
B-Widening from Intermediate lane to double lane and strengthening of Vridhachalam kattukudalore Road at km.4/0-6/0 (MD-815) including upkeeping for a period of 60 months
C-Strengthening of Vridhachalam -Kattukudalore Road at km.0/3-1/0 including widening of pipe culvert at km 0/8 (MD-815) including upkeeping for a period of 60 months
D-Providing Junction Improvement at km 0/0-0/300 Vridhachalam-Kattukudalore road and including providing paver block end to end and including construction of box culvert at km 0/2 (MD-815) including upkeeping for a period of 60 months
E-Improvements to Riding Quality at Km 0/0-6/4 of Palakkollai-Nadiyapattu road"
TRN :
679975
|
Villupuram - Tamil Nadu
Contract Value :
5.18 Crore |Agency Name :
Highway Department
417Improvements to Riding quality and Culvert including upkeeping works for 60 Months in Thittagudi (H) C&M Subdivision Jurisdiction (Package-68)
A- Improvements to riding quality at Km 9/0 - 15/9 of Veppur - Eraiyur road (via) Tholar (MD741)including upkeeping for a period of 60 months
B-Improvements of Veppur - Eraiyur Road(via) Tholar Road at Km 19/900-21/100 Including Reconstruction of culvert at km 20/6 (MD741) including upkeeping for a period of 60 months
C- Improvements of Avinangudi - Tholar road (via)Adhamangalam Km 6/0 - 8/0 Including Reconstruction of Culvert at Km 7/2 & 7/10 including upkeeping for a period of 60 months
D- Improvements of Avinangudi - Tholar road (via) Adhamangalam Km 8/0 - 9/9 Including reconstruction of culvert at Km 8/2,8/6,8/10&9/4 including upkeeping for a period of 60 months
E- Improvements to Riding Quality at Km 5/0 -7/0 of E.Keeranur - Pudukulam Road including upkeeping for a period of 60 months
F-Improvements to Riding Quality at Km0/0-2/2 of Periyanesalur road including upkeeping for a period of 60 months
TRN :
713055
|
Villupuram - Tamil Nadu
Contract Value :
5.48 Crore |Agency Name :
Highway Department
418Widening, Improvements, Improvements to Riding Quality to Government Roads Widening of Pipe Culvert and Slab Culvert, Construction of Retaining Wall and up keeping the roads for a period of 60 months in Harur (H) C&M Sub Division (Package 63)
The Following works are involved in this package
1. Widening from Intermediate lane to Two lane and Improvements of Pappireddipatti - Morappur road (via) Pallipatti, Thenkaraikottai at km 28/480 - 29/6 including widening of pipe culvert at km 29/6 (MD 328 A) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1366)
2. Widening from single lane to intermediate lane and Improvements of Kambainallur - Irumathur road at km 1/6-2/2 & 5/4 - 5/6 and including construction of retaining wall at 1/8-2/0 and widening of pipe culvert at km 5/2. including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2690)
3. Widening from single lane to intermediate lane and improvements of Kambainallur - Anandur road at Km 0/0 - 2/0 and widening of slab at km 0/6 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2704)
4. Improvements to Riding Quality at km 0/0 - 4/6 of Navalai - Peramandapatti road (Using plastic waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4616)
5. Improvements to Riding Quality at km 0/0 - 5/0 of Eachampadi - Thoddampatti road Nainagoundanpudur road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4615)
6. Improvements to Riding Quality at km 0/2 - 1/2 and 2/0 - 3/4 of Odasalpatti - Kambainallur road Kathirnaickanahalli Puliyampatti road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4612)
7. Construction Retaining wall at km 15/8-16/0 of Morappur - Marandahalli road (MD 271) (01-CRIDP-19-20-M-1398)"
TRN :
718795
|
Salem - Tamil Nadu
Contract Value :
5.93 Crore |Agency Name :
Highway Department
419Improvements and Improvements to Riding Quality to Government Roads and up keeping the roads for a period of 60 months in Dharmapuri (H) C&M Sub Division (Package53)
The Following works are involved in this package
1) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.144/450-145/4 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0452)
2) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.146/4-147/0 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0453)
3) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.145/4-146/4 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0454)
4) Improvements of Dharmapuri State Highways (Old NH-7) road at Km.135/8-136/4 and 136/6-137/2 (SH-14) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0455)
5) Improvements to Riding Quality at Km.62/8-63/0 and 68/6-69/0 of Hogenakkal - Pennagaram - Dharmaupri - Thirupathur road (SH-60) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4596)
6) Improvements to Riding Quality at Km.12/2-16/0 of Bommidi R.S. to Thoppaiyar road (using Plastic Waste) (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4608)"
TRN :
727834
|
Dharampuri - Tamil Nadu
Contract Value :
6.29 Crore |Agency Name :
Highway Department
420Widening, Strengthening, Improvements to Riding quality and Culvert including upkeeping works for 60 Months in Vridhachalam (H) C&M Subdivision Jurisdiction (Package-61)
A-Widening from two lane to Three lane and Strengthening of Vridhachalam-Tholudur road at km 7/0-8/0 including Reconstruction of Box culvert at km 7/10 (SH-141) including upkeeping for a period of 60 months
B- Widening from two lane to three lane and Strengthening of Vridhachalam-Tholudur road at km 8/0-9/0 (SH-141) including upkeeping for a period of 60 months
C-Widening from two lane to Three lane and Strengthening of Vridhachalam-Tholudur road at km 9/0-10/0 including Reconstruction of culvert at km 9/4 (SH-141) including upkeeping for a period of 60 months
D-Improvement to riding quality at km 0/0-3/0 of Sethiyathoppu-Kammapuram road (via) Veeramudaiyanatham including upkeeping for a period of 60 months"
TRN :
679976
|
Villupuram - Tamil Nadu
Contract Value :
5.20 Crore |Agency Name :
Highway Department