You have searched for highway-department in Awarded Tender Result. Click on any tender to view further details.

571 Widening and Improvements, Improvements to Riding Quality, Providing Centre Median, Providing Bus Lay Byes, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Avinashi (Highways), C&M, Sub Division. Package No.41 A) Widening from Two lane to Three lane and Improvements of Palladam - Avinashi - Puliyampatti road at km 34/0 - 34/875 (SH 166) including upkeeping for a period of 60 months B) Widening from Two lane to Four lane and Improvements of Palladam - Avinashi - Puliyampatti road at km 40/0 - 40/4 including construction of Retaining walls at km 40/2 & 40/4 and providing centre median at km 40/0 - 40/4 (SH 166) including upkeeping for a period of 60 months C) Widening from Two lane to Three lane and Improvements of Palladam - Avinashi - Puliyampatti road at km 34/875 - 35/6 including Providing bus lay byes at km 35/2(SH 166) including upkeeping for a period of 60 months D) Improvements to Riding Quality at km 0/0 - 2/8 of Thandukkaranpalayam - Pasur road including upkeeping for a period of 60 months E) Improvements to Riding Quality at km 2/8 - 5/6 of Thandukkaranpalayam - Pasur road including upkeeping for a period of 60 months F) Improvements to Riding Quality at km 5/6 - 9/0 of Thandukkaranpalayam - Pasur road including upkeeping for a period of 60 months G) Improvements to Riding Quality at km 0/0 - 1/6 of Avinashi - Puliyampatti road to Aalathur road (including extra length of 400.00m at km 1/6)including upkeeping for a period of 60 months "
TRN : 676769 |  Tirupur - Tamil Nadu
Contract Value : 5.53 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, providing centre median, providing bus lay byes, construction of retaining walls and including up keeping for a period of 60 months on government roads in avinashi (highways), c&m, sub division. package no.41 a) widening from two lane to three lane and improvements of palladam - avinashi - puliyampatti road at km 34/0 - 34/875 (sh 166) including upkeeping for a period of 60 months b) widening from two lane to four lane and improvements of palladam - avinashi - puliyampatti road at km 40/0 - 40/4 including construction of retaining walls at km 40/2 & 40/4 and providing centre median at km 40/0 - 40/4 (sh 166) including upkeeping for a period of 60 months c) widening from two lane to three lane and improvements of palladam - avinashi - puliyampatti road at km 34/875 - 35/6 including providing bus lay byes at km 35/2(sh 166) including upkeeping for a period of 60 months d) improvements to riding quality at km 0/0 - 2/8 of thandukkaranpalayam - pasur road including upkeeping for a period of 60 months e) improvements to riding quality at km 2/8 - 5/6 of thandukkaranpalayam - pasur road including upkeeping for a period of 60 months f) improvements to riding quality at km 5/6 - 9/0 of thandukkaranpalayam - pasur road including upkeeping for a period of 60 months g) improvements to riding quality at km 0/0 - 1/6 of avinashi - puliyampatti road to aalathur road (including extra length of 400.00m at km 1/6)including upkeeping for a period of 60 months "
572 Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Protective Walls and up keeping the roads for a period of 60 months in Yercaud C&M Sub Division (Package-16) The Following works are involved in this package 1.Improvements to Riding Quality at km 11/0 -12/0 and 13/0 - 14/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 -I-4466 2.Improvements to Riding Quality at km 14/0 -16/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4467 3.Improvements of Salem Junction to Yercadu Road at km 25/0 - 26/4 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0348 4.Improvements of Salem Junction to Yercadu Road at km 26/4 - 28/0 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0349 5.Improvements to Riding Quality at km 5/0 - 7/4 and 11/0 - 12/0 of Yercaud loop Road (MD 563) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4478 "
573 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Box Culverts, Retaining Wall, and Providing Revetment, Well Protective Wall, Drain and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-21) The Following works are involved in this package 1.Improvements of Sankari - Mecheri road (via) Edappady at km 16/2 - 16/8 (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0374) 2.Improvements to Riding Quality at km 13/8 - 14/6 and 15/4 - 15/6 of Sankari - Mecheri road(via) Edappady (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I- 4520) 3.Construction of Drain at km 13/8 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0388) 4.Construction of Box culvert at km 17/10 of Magudanchavadi - Komarapalayam road (via)Edappady (SH 221) including Upkeeping for a period of 60 months(01-CRIDP-19-20-S- 0385) 5.Widening from Intermediate lane to Two lane and Improvements of Edappady - Nedungulam - Koneripatty-Anandampalayam road at km 8/4 - 9/8 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0360) 6.Improvements of Sankari - Mecheri road (via) Edappady at km 23/2 - 24/2 including widening of curve and providing well protective wall including Upkeeping for a period of 60 months(SH 220) (01-CRIDP-19-20-S- 0376) 7.Providing revetment at km 4/4 of Edappady - Nedungulam-Koneripatty-Anandampalayam road (for high embankment portion) (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0390) 8.Construction of Retaining wall at km 8/10,9/2,9/4,9/6 and 9/8 of Edappady -Nedungulam - Koneripatty-Anandampalayam road including Box culvert at Km 8/8,8/10 and 9/2 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0394) 9.Improvements to Riding Quality at km 32/2 - 33/0 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-I-4528) including Upkeeping for a period of 60 months 10.Construction of Drain at km 18/2 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0396) 11.Raising the dip at km 2/8 of Moolapathai - Irupali road (via) Chittur including Construction of Box culvert. including Upkeeping for a period of 60 months(01-CRIDP-19-20-O-2628) 12.Construction of Drain at km 0/6-1/2 of Koneripatti - Poolampatti Road (via) Thambagoundanoor Road Karattupudur Road (01-CRIDP-19-20-O-2638)
TRN : 671186 |  Salem - Tamil Nadu
Contract Value : 6.07 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction of drain, box culverts, retaining wall, and providing revetment, well protective wall, drain and up keeping for a period of 60 months in edappady (h) c&m sub division (package-21) the following works are involved in this package 1.improvements of sankari - mecheri road (via) edappady at km 16/2 - 16/8 (sh 220) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0374) 2.improvements to riding quality at km 13/8 - 14/6 and 15/4 - 15/6 of sankari - mecheri road(via) edappady (sh 220) including upkeeping for a period of 60 months (01-cridp-19-20-i- 4520) 3.construction of drain at km 13/8 of sankari - mecheri road (via) edappady (sh 220) (01-cridp-19-20-s- 0388) 4.construction of box culvert at km 17/10 of magudanchavadi - komarapalayam road (via)edappady (sh 221) including upkeeping for a period of 60 months(01-cridp-19-20-s- 0385) 5.widening from intermediate lane to two lane and improvements of edappady - nedungulam - koneripatty-anandampalayam road at km 8/4 - 9/8 (sh 220 b) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0360) 6.improvements of sankari - mecheri road (via) edappady at km 23/2 - 24/2 including widening of curve and providing well protective wall including upkeeping for a period of 60 months(sh 220) (01-cridp-19-20-s- 0376) 7.providing revetment at km 4/4 of edappady - nedungulam-koneripatty-anandampalayam road (for high embankment portion) (sh 220 b) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0390) 8.construction of retaining wall at km 8/10,9/2,9/4,9/6 and 9/8 of edappady -nedungulam - koneripatty-anandampalayam road including box culvert at km 8/8,8/10 and 9/2 (sh 220 b) including upkeeping for a period of 60 months (01-cridp-19-20-s- 0394) 9.improvements to riding quality at km 32/2 - 33/0 of sankari - mecheri road (via) edappady (sh 220) (01-cridp-19-20-i-4528) including upkeeping for a period of 60 months 10.construction of drain at km 18/2 of sankari - mecheri road (via) edappady (sh 220) (01-cridp-19-20-s- 0396) 11.raising the dip at km 2/8 of moolapathai - irupali road (via) chittur including construction of box culvert. including upkeeping for a period of 60 months(01-cridp-19-20-o-2628) 12.construction of drain at km 0/6-1/2 of koneripatti - poolampatti road (via) thambagoundanoor road karattupudur road (01-cridp-19-20-o-2638)
574 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-25) The Following works are involved in this package 1. Improvements to Riding Quality at km 0/0 - 4/6 of Katchupalli - Alagappampalayam - Elampillai road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4537) 2.Widening from Single lane to Intermediate lane and Improvements of Kattinaickanpatti - Manikampatti Road at km 0/0 - 2/290 including CD works Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2610) 3.Construction of retaining wall at Km 0/4,0/10,1/2,1/4,1/6 & 2/2 of Kattinaickanpatti - Manikampatti Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2631) 4.Widening from Single lane to Intermediate lane and Improvements of Manikampatty - Avadathur Road at km 0/0 - 1/6 including CD works and construction of retaining wall Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2611) 5.Improvements to Riding Quality at km 3/0 - 5/8 of Vanavasi- Kuppampatty (via) Sanaraptty road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4540) 6.Construction of Retaining wall at km 4/2 and 4/4 of Malaiyanur Road Includingupkeeping for a period of 60 months (01-CRIDP-19-20-O-2641) 7.Improvements to Riding Quality at km 0/0 - 1/6 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4546) 8.Improvements to Riding Quality at km 1/6 - 3/055 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4547)"
TRN : 720170 |  Salem - Tamil Nadu
Contract Value : 6.21 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works and construction of retaining wall and up keeping for a period of 60 months in edappady (h) c&m sub division (package-25) the following works are involved in this package 1. improvements to riding quality at km 0/0 - 4/6 of katchupalli - alagappampalayam - elampillai road including upkeeping for a period of 60 months (01-cridp-19-20-i-4537) 2.widening from single lane to intermediate lane and improvements of kattinaickanpatti - manikampatti road at km 0/0 - 2/290 including cd works including upkeeping for a period of 60 months (01-cridp-19-20-0-2610) 3.construction of retaining wall at km 0/4,0/10,1/2,1/4,1/6 & 2/2 of kattinaickanpatti - manikampatti road including upkeeping for a period of 60 months (01-cridp-19-20-o-2631) 4.widening from single lane to intermediate lane and improvements of manikampatty - avadathur road at km 0/0 - 1/6 including cd works and construction of retaining wall including upkeeping for a period of 60 months (01-cridp-19-20-0-2611) 5.improvements to riding quality at km 3/0 - 5/8 of vanavasi- kuppampatty (via) sanaraptty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4540) 6.construction of retaining wall at km 4/2 and 4/4 of malaiyanur road includingupkeeping for a period of 60 months (01-cridp-19-20-o-2641) 7.improvements to riding quality at km 0/0 - 1/6 of ettikuttaimedu - elavampalayam - pallipatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4546) 8.improvements to riding quality at km 1/6 - 3/055 of ettikuttaimedu - elavampalayam - pallipatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4547)"
575 Widening and Improvements, Improvements to Riding Quality, Dip raising, Reconstruction of RCC Slab Culverts, Construction of Box Culverts, Widening of Culverts, Construction of Retaining Walls and including Up Keeping for a period of 60 Months on Government Roads in Dharapuram (Highways), C&M, Sub Division. Package No.52 Road A :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at km 37/0 - 37/8 (SH 21) including construction of Retaining wall at km 37/6 including upkeeping for a period of 60 months. Road B :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at km 39/2 - 40/2 Including widening of culvert at km 39/4, 39/10, 40/2 and Construction of Retaining Wall at Km 39/4, 39/6, 39/8 & 40/2. (SH 21) including upkeeping for a period of 60 months. Road C :- Widening from Two lane to Three lane and Improvements of Pollachi - Dharapuram - Karur road at km 40/2- 41/2 Including Widening of Culvert at Km 40/6 and Construction of Retaining Wall at Km 40/4 , 40/6 & 40/8 (SH 21) including upkeeping for a period of 60 months. Road D :- Widening from Two lane to Three lane and Improvements of Dharapuram By pass road (Phase II) Upputhuraipalayam to Madukampalayam Pirivu at km 0/0 -1/2 including Construction of Retaining wall at km 0/2 (SH-172) including upkeeping for a period of 60 months. Road E :- Reconstruction of RCC slab culvert at km 74/4 of Mettur- Palakkanuthu -Oddanchatram - Dharapuram -Tirupur Road (SH-37) Road F :- Improvements to Riding Quality at km 84/8-85/6 of Mettur- Palakanuthu -Oddanchatram - Dharapuram -Tirupur Road (SH37) including upkeeping for a period of 60 months. Road G :- Construction of box culvert at km 23/8 of Kundadam - Ponnapuram Road. including dip rasing. Road H :- Construction of box culvert at km 1/6 of Sellampalayam - Ranjithapuram road (via) Somanuthu, Kottamuthampalayam loop road (Road-A) including construction of Retaining wall"
TRN : 716249 |  Tirupur - Tamil Nadu
Contract Value : 7.44 Crore | Agency Name : Highway Department
Tender award for widening and improvements, improvements to riding quality, dip raising, reconstruction of rcc slab culverts, construction of box culverts, widening of culverts, construction of retaining walls and including up keeping for a period of 60 months on government roads in dharapuram (highways), c&m, sub division. package no.52 road a :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 37/0 - 37/8 (sh 21) including construction of retaining wall at km 37/6 including upkeeping for a period of 60 months. road b :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 39/2 - 40/2 including widening of culvert at km 39/4, 39/10, 40/2 and construction of retaining wall at km 39/4, 39/6, 39/8 & 40/2. (sh 21) including upkeeping for a period of 60 months. road c :- widening from two lane to three lane and improvements of pollachi - dharapuram - karur road at km 40/2- 41/2 including widening of culvert at km 40/6 and construction of retaining wall at km 40/4 , 40/6 & 40/8 (sh 21) including upkeeping for a period of 60 months. road d :- widening from two lane to three lane and improvements of dharapuram by pass road (phase ii) upputhuraipalayam to madukampalayam pirivu at km 0/0 -1/2 including construction of retaining wall at km 0/2 (sh-172) including upkeeping for a period of 60 months. road e :- reconstruction of rcc slab culvert at km 74/4 of mettur- palakkanuthu -oddanchatram - dharapuram -tirupur road (sh-37) road f :- improvements to riding quality at km 84/8-85/6 of mettur- palakanuthu -oddanchatram - dharapuram -tirupur road (sh37) including upkeeping for a period of 60 months. road g :- construction of box culvert at km 23/8 of kundadam - ponnapuram road. including dip rasing. road h :- construction of box culvert at km 1/6 of sellampalayam - ranjithapuram road (via) somanuthu, kottamuthampalayam loop road (road-a) including construction of retaining wall"
576 Improvements to Roads and Improvements to Riding Quality to Government Roads including Consruction, Reconstruction of Box Culverts, Construction of Retaining Wall in Salem (H) C &M,Sub Division (Package-4) The Following works are involved in this package 1. Improvements of Mallur - Mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2589) 2. Reconstruction of Box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of Mallur - Mookuthipalayam road and Construction of Drain at Km 0/2,0/4,0/6. 3. Improvements of Mallur - Mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2606) 4. Improvements to Riding Quality at km 1/0 - 3/609 of Poolavari - Parapatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2590) 5. Improvements to Riding Quality at km 0/0 - 1/2 of Jari Kondalampatty Paranattamangalam road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4509) 6. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 0/0 - 1/0 (MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1295) 7. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 1/0 - 3/4 including Construction of culvert at km 2/10, 3/2 and Construction of Retaining wall at Km 1/10(MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1296) 8. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 3/4 - 5/0 including Construction of retaining wall at Km 2/2, 4/6, 4/10 and curve improvements at Km 4/8,4/10(MD 594) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1304) "
TRN : 720178 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for improvements to roads and improvements to riding quality to government roads including consruction, reconstruction of box culverts, construction of retaining wall in salem (h) c &m,sub division (package-4) the following works are involved in this package 1. improvements of mallur - mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2589) 2. reconstruction of box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of mallur - mookuthipalayam road and construction of drain at km 0/2,0/4,0/6. 3. improvements of mallur - mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2606) 4. improvements to riding quality at km 1/0 - 3/609 of poolavari - parapatty road including upkeeping for a period of 60 months. (01-cridp-19-20-o-2590) 5. improvements to riding quality at km 0/0 - 1/2 of jari kondalampatty paranattamangalam road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4509) 6. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 0/0 - 1/0 (md 594) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1295) 7. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 1/0 - 3/4 including construction of culvert at km 2/10, 3/2 and construction of retaining wall at km 1/10(md 594) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1296) 8. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 3/4 - 5/0 including construction of retaining wall at km 2/2, 4/6, 4/10 and curve improvements at km 4/8,4/10(md 594) including upkeeping for a period of 60 months (01-cridp-19-20-m-1304) "
577 Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Protective Walls and up keeping the roads for a period of 60 months in Yercaud C&M Sub Division (Package-16) The Following works are involved in this package 1.Improvements to Riding Quality at km 11/0 -12/0 and 13/0 - 14/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 -I-4466 2.Improvements to Riding Quality at km 14/0 -16/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4467 3.Improvements of Salem Junction to Yercadu Road at km 25/0 - 26/4 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0348 4.Improvements of Salem Junction to Yercadu Road at km 26/4 - 28/0 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0349 5.Improvements to Riding Quality at km 5/0 - 7/4 and 11/0 - 12/0 of Yercaud loop Road (MD 563) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4478 "
578 Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31) The Following works are involved in this package 1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383 2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384 3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378 4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527 5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531 6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN : 720192 |  Salem - Tamil Nadu
Contract Value : 5.77 Crore | Agency Name : Highway Department
Tender award for improvements to government roads including construction of culverts and retaining wall and up keeping for a period of 60 months in omalur (h) c&m sub division (package-31) the following works are involved in this package 1) improvements of sankari - mecheri road (via) edappady at km 36/2- 38/2 (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-s-0383 2) improvements of sankari - mecheri road (via) edappady at km 38/2-40/2 and 41/2- 41/4 (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-s-0384 3) improvements of tharamangalam - jalagandapuram road at km 5/0 - 6/0 including construction of retaining wall at km.2/4 - 3/0 (sh 219a) including upkeeping for a period of 60 months 01-cridp-19-20-s-0378 4) improvements to riding quality at km 6/0 - 7/0 of tharamangalam jalagandapuram road (sh-219a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4527 5) improvements to the riding quality at km 9/0 - 11/4 of tharamangalam - nangavalli - kunjandiyur road(sh-223) including upkeeping for a period of 60 months 01-cridp-19-20-i-4531 6) construction of retaining wall at km. 9/4- 9/6 of tharamangalam - nangavalli- kunjandiyur road including cd works (sh-223) 01-cridp-19-20-s-0406 7) construction of retaining wall at km.0/8,1/2,1/6and 1/8 of tholasampatty -mallapanur road including reconstruction of box culvert at km 1/8 ( md 1174a) 01-cridp-19-20-m-1325"
579 WIDENING AND IMPROVEMENTS TO RIDING QUALITY, CONTRUCTION OF BOX CULVERTS, PROVIDING CENTRE MEDIAN, CONSTRUCTION OF DRAIN,
580 Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29) The Following works are involved in this package 1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525) 2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397) 4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323) 5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624) 6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635) 7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539) 8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637) 9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549) 10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN : 720194 |  Salem - Tamil Nadu
Contract Value : 6.31 Crore | Agency Name : Highway Department
Tender award for widening and improvements to riding quality to government roads including construction of cd works, storm water drain, retaining wall and well protective wall and up keeping for a period of 60 months in omalur (h) c&m sub division (package-29) the following works are involved in this package 1) improvements to the riding quality at km. 3/6- 5/0 of tharamangalam - nangavalli- kunjandiyur road (sh-223) including upkeeping for a period of 60 months (01-cridp-19-20-i-4525) 2) construction of drain at km 1/2- 1/8 (both sides) of tharamangalam - nangavalli- kunjandiyur road including well protective wall at km.1/2 and cd works (sh-223) (01-cridp-19-20-s-0391) 3) construction of retaining wall at km 14/8- 15/0 of jagir ammapalayam-tharamangalam road (sh-219) (01-cridp-19-20-s-0397) 4) construction of drain at km. 1/8- 2/2 of karuppur-vellapatty-thathiyangarpatty road (md 1175) (01-cridp-19-20-m-1323) 5) improvements of omalur-muthunaickenpatty- alagusamuthiram road at km 2/6-7/2 including construction of storm water drain at km 7/8- 8/2 and construction of retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-cridp-19-20-0-2624) 6) construction of drain at km. 1/2-1/8 of thekkampatty – moongilpaddy road (01-cridp-19-20-0-2635) 7) improvements to the riding quality at km 4/0- 6/4 tharamangalam- vanavasi road to sedapatty (via) ariyampatty- s.karattupatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4539) 8) construction of drain at km. 0/2- 1/2 of puliyampatty-karuppur road including cd works (01-cridp-19-20-o-2637) 9) improvements to riding quality at km 0/0-4/2 of km 7/0 of omalur– sankari- thiruchengode- paramathi road to muthunaikenpatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4549) 10) construction of drain at km 8/4- 8/8 (both sides) of tharamangalam- vanavasi road to sedapatty (via) ariyampatty- s.karattupatty road including construction of box culvert at km. 8/8 01-cridp-19-20-o-2632"

Get Highway Department Tender Alert...