You have searched for national-highway-division in Awarded Tender Result. Click on any tender to view further details.
21S/R to NH 55 from KM 280 to 291.000km such as providing 30mm BC in selected stretches from Ch 280/299 to 281/399, 286/700 to 287/800, 289/395 to 290/0km and 290/0 to 291/0km for the year 2019-20
TRN :
669352
|
Cuttack - Orissa
Contract Value :
44.63 Lacs |Agency Name :
National Highway Division
24Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Box Culverts, Retaining Wall, and Providing Revetment, Well Protective Wall, Drain and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-21)
The Following works are involved in this package
1.Improvements of Sankari - Mecheri road (via) Edappady at km 16/2 - 16/8 (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0374)
2.Improvements to Riding Quality at km 13/8 - 14/6 and 15/4 - 15/6 of Sankari - Mecheri road(via) Edappady (SH 220) including Upkeeping for a period of 60 months (01-CRIDP-19-20-I- 4520)
3.Construction of Drain at km 13/8 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0388)
4.Construction of Box culvert at km 17/10 of Magudanchavadi - Komarapalayam road (via)Edappady (SH 221) including Upkeeping for a period of 60 months(01-CRIDP-19-20-S- 0385)
5.Widening from Intermediate lane to Two lane and Improvements of Edappady - Nedungulam - Koneripatty-Anandampalayam road at km 8/4 - 9/8 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0360)
6.Improvements of Sankari - Mecheri road (via) Edappady at km 23/2 - 24/2 including widening of curve and providing well protective wall including Upkeeping for a period of 60 months(SH 220) (01-CRIDP-19-20-S- 0376)
7.Providing revetment at km 4/4 of Edappady - Nedungulam-Koneripatty-Anandampalayam road (for high embankment portion) (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0390)
8.Construction of Retaining wall at km 8/10,9/2,9/4,9/6 and 9/8 of Edappady -Nedungulam - Koneripatty-Anandampalayam road including Box culvert at Km 8/8,8/10 and 9/2 (SH 220 B) including Upkeeping for a period of 60 months (01-CRIDP-19-20-S- 0394)
9.Improvements to Riding Quality at km 32/2 - 33/0 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-I-4528) including Upkeeping for a period of 60 months
10.Construction of Drain at km 18/2 of Sankari - Mecheri road (via) Edappady (SH 220) (01-CRIDP-19-20-S- 0396)
11.Raising the dip at km 2/8 of Moolapathai - Irupali road (via) Chittur including Construction of Box culvert. including Upkeeping for a period of 60 months(01-CRIDP-19-20-O-2628)
12.Construction of Drain at km 0/6-1/2 of Koneripatti - Poolampatti Road (via) Thambagoundanoor Road Karattupudur Road (01-CRIDP-19-20-O-2638)"
TRN :
701089
|
Salem - Tamil Nadu
Contract Value :
6.07 Crore |Agency Name :
National Highway Division
25S/R such as improvement to NH-149 from km.0/00 to 2/140 km including retaining wall (L.H.S.&R.H.S) and Box cell Culvert under state plan for the year 2018-19
TRN :
675610
|
Palla Hara - Orissa
Contract Value :
43.09 Lacs |Agency Name :
National Highway Division