You have searched for south-eastern-coalfields-limited in Awarded Tender Result. Click on any tender to view further details.

2071 Cleaning of jammed coal of CHP surge bunkers, steam bunkers and alack bunker in every shift for proper sliding of coal in to the bunkers for smooth dispatch of feeding mines for the one year of Rajnagar RO Siding.
2072 Transportation of sand cartridge from underground stockyard to working faces in -3Dip dev. Distt 13LS and 19LS distt of 7A1 seam in 5/6 incline at Rajnagar R.O.Colliery
2073 Preparation of loading points of working district of -3Dip dev. Distt. In 7A1 seam of 5/6 incline as per direction of district incharge for loading of coal on the belt conveyor tail end at loading points at Rajnagar RO Colliery.
2074 Transportation/carriage of stemming material from underground track end to working faces in distt. Of 8A2 seam in 7/8 Incline at Rajnagar RO Mine,
2075 Dismantling, transportation and laying/installation of endless haulage for 73LW, 79LW and 56L W development districts (V-top seam) in the western part of Baherabandh UG Mine of Hasdeo Area
2076 Supporting of roof from 6D/0L to 22D/0L in travelling roadway of old galleries with resin bolting by manual drilling of holes, jamming and tightening the roof with resin capsules and bearing plates/w-straps including carriage of materials from neare
2077 Reclamation of Carpet coal/compact coal by hydraulic excavator (JCB) and loading into tractor and transportation of coal below crasser and loading point to CHP at Bijuri CHP at Bijuri Colliery.
2078 Hiring of Pay loaders for mechanical transfer of coal into railway wagons incorporated/fitted with weightometer at Surakachhar wharf wall siding of Korba Area as detailed in NIT
2079 Repairing of collapsed/tilted boundary wall of Quarter No. D-70, D-85, D-40, D-49, D-50, D-34, D-35, D-65, D-61, D-82, C-131, C-63, C-61, C-99, A-274 and A-142 at Vasant Vihar Colony, SECL HQ Bilaspur.
2080 Assistance in day to day pumping operation work and minor maintenance work as per the requirement in all the three shifts to operate H.T. Pumps installed at different locations at Quarry ,KOCP for a period of 240 days .

Get South Eastern Coalfields Limited Tender Alert...

764395

Advertisment
Advertisment