You have searched for sundarban-development-board in Awarded Tender Result. Click on any tender to view further details.

111 Construction of B.P. Road from Jagadhatripur F P School to Panchugopal Sardars house in Mouza- Manmathapur, G.P.- Rabindra, P.S. & Block- Kakdwip under Kakdwip-I Sub-Division of C.E.D.-II, S.D.B. Length= 530.0m (PLAN)
112 Construction of B.P. Road from the house of Kamal Koyal to Chunilal Khal and link road from the house of Dilip Mondal to the house of Gour Manna near Black Top road including construction of one no. R.C.C. Culvert in G.P.- Srinagar, Block- Kakdwip under Kakdwip-I Sub-Division of C.E.D.-II, S.D.B. (Main road (Ch0.0m to 617.0m) Length-617.0m) + Link road - (Ch0.0m to Ch. 428.0m) Length - 428.0m (Total Length = (617.00 + 428.00) M = 1045.00M) (PLAN)
113 Construction of B.P. Road from 1 No Pump house to Bablu Mondal House, Mouza - Khansaheb Abad, G.P.- Ramkarchar, Block- Sagar, P.S. - Sagar,, under Sagar Sub-Divn of CED-II. (From Ch. 0.0m to 560.0m and link road 40.00m) Total Length= 560.0m + 40.0m = 600.00M PLAN
114 Construction of B.P. Road from Sapkhali Kanai Das house to Tapas Karan house at Mouza - Sapkhali, G.P.- Muriganga-I, Block- Sagar, P.S.- Sagar under Sagar Sub-Divn of CED-II. (Ch. 0.0m to1050.0m) Length= 1050.00m PLAN
115 Construction of B.P. Road from Mandirtala Satish Das house to Bamankhali Sima bandh at Mouza - Mandirtala, G.P.- Muriganga-II, Block- Sagar, P.S.- Sagar under Sagar Sub-Divn of CED-II. (Ch. 0.0m to 865.0m) Length= 865.00m PLAN
116 Construction of 2 nos. B.P. Road from Moynapara Kali Mandir to Nabin Mondals house and Kali Mandir to Haradhan Pramaniks house in Mouza- Kakdwip, G.P.- Swami Vivekananda, P.S. & Block- Kakdwip under Kakdwip-I Sub-Divn of CED-II. Length = 290.00m + 320.0m. Total Length = 610.0m (Plan) 2ND CALL
117 Construction of B.P. Road from Sonali Mistrys house to Manasa Mondir in Mouza- Kakdwip, G.P.- Swami Vivekananda, P.S. & Block- Kakdwip under Kakdwip-I Sub-Divn of CED-II. Length = 550.00m (Plan) 2ND CALL
118 Construction of B.P. Road from Balasi Giris house to Agrani Sangha with link road from Sankar Giris house to Sasanka Pradhans house and Sarat Maitys house to Shyamapada Pals house in Mouza & G.P.- Ramgopalpur, P.S. & Block- Kakdwip under Kakdwip-I Sub-Divn of CED-II. Main Road- 280.0m Link Road - 215.0m & 190.0m Total Length= 685.00m (Plan) 2ND CALL
119 Construction of B.P. Road from Jagadish Mondals house to Koloni para Aurobinos house via Kapila Nanda Mondals house and link road from Aurobinos house to Kaplila Nanda Mondals house in Mouza & G.P.- Surajnagar, P.S.- Harwood Point Coastal, Block- Kakdwip under Kakdwip-I Sub-Divn of CED-II.(Main road -( Ch0.0 m to 570.0m) + Link road -( Ch0.0m to Ch. 143.0m) Length- Total Length = (570.00 + 143.00)M = 713.00M) (Plan) 2ND CALL
120 Construction of B.P. Road from Bishu Halders Sluice to Amit Beras house and link road from the house of Krishna Mondal to the house of Angur Duari in Mouza- Kakdwip, G.P.- Swami Vivekananda, P.S. & Block- Kakdwip under Kakdwip-I Sub-Divn of CED-II. Length = (257.0m + 390.0m) Total Length = 647.0m (Plan) 2ND CALL

Get Sundarban Development Board Tender Alert...

904053

Advertisment
Advertisment