You have searched for tamil-nadu-generation-and-distribution-corporation-limited in Awarded Tender Result. Click on any tender to view further details.

1961 TTPS Operation Circle OE II Maintenance of Fire Alarm System such as Smoke detectors, Heat detectors, Manual Call Points and Linear Heat Detection Cables for Conveyors for the period from 08.10.18 to 31.03.19.
1962 TTPS – ES Circle - Instn-I – Maintenance of control panels, Transmitters, Actuators and Junction Boxes in Plant and Plant auxiliaries area pertaining to Unit II for a period from 08.10.18 to 31.03.19.
1963 TTPS Operation Circle MPM I Overhauling of Roller Journal assembly and replacement of worn out grinding rollers in Unit III mills from 08.10.18 to 31.03.19.
TRN : 512063 |  Chennai - Tamil Nadu
Contract Value : 4.20 Lacs | Agency Name : Tamil Nadu Generation And Distribution Corporation Limited
Tender award for ttps operation circle mpm i overhauling of roller journal assembly and replacement of worn out grinding rollers in unit iii mills from 08.10.18 to 31.03.19.
1964 TTPS – ES Circle - Instn-I – Maintenance of control panels, Transmitters, Actuators and Junction Boxes in Plant and Plant auxiliaries area pertaining to Unit I for a period from 08.10.18 to 31.03.19.
1965 Routine cleaning and operation and attending emergency rescue works round the clock in Freight cum Passenger lifts of Boiler area at Unit IV and V for the period from 08.10.18 to 31.03.19.
1966 TTPS Operation Circle MPM-I Unit II Monitoring the operation of coal Mills and feeders and assisting in attending the defects in them for a period from 08.10.18 to 31.03.19.
TRN : 512064 |  Chennai - Tamil Nadu
Contract Value : 3.59 Lacs | Agency Name : Tamil Nadu Generation And Distribution Corporation Limited
Tender award for ttps operation circle mpm-i unit ii monitoring the operation of coal mills and feeders and assisting in attending the defects in them for a period from 08.10.18 to 31.03.19.
1967 Fault attending in Boiler auxiliaries motors valve motors soot blower motors and preventive maintenance of Ash Silo Transformer A and B of Unit IV and V period from 08.10.18 to 31.03.19.
1968 TTPS Operation Circle MPM I Unit I, II and III Mills Checking the alignment of mill motor with gearbox and setting the axial and radial clearance for a period from 08.10.18 to 31.03.19.
1969 Operation routine cleaning of lift car landing gates machine and controller and doing rescue operation if needed in VIP lift of units IV and V throughout the day in 3 shifts for the period from the date of 08.10.18 to 31.03.19.
1970 TTPS Operation Circle MPM I Attending to preventive and breakdown maintenance works in the 7.5 Ton capacity EOT cranes of Unit I, II and III Mill Plant for the period from 08.10.18 to 31.03.19.

Get Tamil Nadu Generation And Distribution Corporation Limited Tender Alert...

991443

Advertisment
Advertisment