You have searched for tamil-nadu-generation-and-distribution-corporation-limited in Awarded Tender Result. Click on any tender to view further details.

961 SE/ES/TTPS/27/2019-20 Maintenance of 360V UPS batteries, 220V DC batteries, 24V DC batteries in Unit IV and V, 220 V DC batteries in Indoor Switchyard II and 48V DC CC batteries in Indoor Switchyard II for the period from 08.04.19 to 30.09.19.
962 SE/ES/TTPS/28/2019-20 Routine cleaning and operation and attending emergency rescue works round the clock in Freight cum Passenger lifts of Boiler area at Unit IV and V for the period from 08.04.19 to 30.09.19.
963 SE/ES/TTPS/9/2019-20 Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc., and routine cleaning and minor maintenance works of boiler side fan motors, mill motors, Lub... U III
964 SE/ES/TTPS/21/2019-20 Operation, routine cleaning of lift car, landing gates, machine and controller and doing rescue operation if needed in VIP lift of units IV and V throughout the day in 3 shifts for the period from 08.04.19 to 30.09.19.
965 SE/ES/TTPS/8/2019-20 Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc routine cleaning and minor maintenance works of boiler side fan motors, mill motors, lub oil motors, U II
966 SE/ES/TTPS/38/2019-20 Day to day cleaning maintenance and testing assistance activities for Control and protection panels and allied field equipments / services in Turbine Auxiliaries sub division/MRT II period from 08.04.19 to 30.09.19.
967 SE/ES/TTPS/7/2019-20 Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc routine cleaning and minor maintenance works of boiler side fan motors, mill motors, lub oil motors, feede
968 SE/ES/TTPS/37/2019-20 Cleaning maintenance and testing assistance activities for control and protection panels and MRT II lab pertaining to Generator auxiliaries Switch yard II SD I of MRT II period from 08.04.19 to 30.09.19.
969 SE/ES/TTPS/36/2019-20 Blowing cycle operation of Soot blowers and maintenance of Junction Boxes, field equipments of FSSS and Boiler auxiliary systems in Unit IV and V period from 08.04.19 to 30.09.19.
970 SE/ES/TTPS/19/2019-20 Maintenance of control panels, Transmitters, Actuators and Junction Boxes in Plant and Plant auxiliaries area pertaining to Unit III for a period from 08.04.19 to 30.09.19.

Get Tamil Nadu Generation And Distribution Corporation Limited Tender Alert...

366956

Advertisment
Advertisment