You have searched for water-resources-department in Awarded Tender Result. Click on any tender to view further details.

631 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Rautara Bridge 25.63 km Sohai-Swetpur road to near jassore road jora bridge 30.23 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division.
632 Operation and Maintenance of switchyard equipments at Palasgaon Lift irrigation scheme Switchyard Tal. Ballarpur, Dist. Chandrapur
TRN : 835873 |  Chandrapur - Maharashtra
Contract Value : 4.25 Lacs | Agency Name : Water Resources Department
Tender award for operation and maintenance of switchyard equipments at palasgaon lift irrigation scheme switchyard tal. ballarpur, dist. chandrapur
633 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from outfall to start point (Length 5.015 KM.) of panskhali khal at Block- Barasat-II, P.S.-Sashan under Bidyadhari Drainage Division.
634 Raising and Strengthening of Singra both bank embankment.
TRN : 835977 |  Kamrup - Assam
Contract Value : 43.66 Lacs | Agency Name : Water Resources Department
Tender award for raising and strengthening of singra both bank embankment.
635 Maintenance and repair to 2(two)nos. ghoges underguard wall infront sluice no. 2 on the R/B of river Ichhamati, Block & P.S.-Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division
636 Providing internal electrification work for new Section Office building of Asolamendha Project Renovation Division No. 1,Mul, Tal. Mul, Dist. Chandrapur.
637 Maintenance and repair to 3 vented sluice over Duma Khal near outfalling of river Ichhamati at mouza Angrail in P.S.-Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division.
638 Supply, erection, testing &commissionig of 11/0.433 kV, 200 KVA DTC for Irrigation colony at village Saoli ofAsolamendha Project Renovation Division no. 2, Saoli., Tal-Saoli, Dist-Chandrapur.
639 Clearing and removing of water hyacinth under A.M.C for a period of 08 months( from May 2020 to December 2020) from 11.79 Km to 13.64 Km over river Nonagang in P.S Barasat and Deganga Dist. North 24 parganas under Barasat Drainage Sub-division of Bidyadhari Drainage Division.
640 Shifting & Height raising of 33 KV line, 11 KV line and LT line passing over the Padegaon Minor and Aajgaon canal Taluka- Deoli, Dist. Wardha

Get Water Resources Department Tender Alert...

656194

Advertisment
Advertisment