You have searched for water-resources-department in Awarded Tender Result. Click on any tender to view further details.

631 Clearing and removing of water hyacinth under Annual Maintenance Contract for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Nagla Khal from ch. 0.00 km. to 6.00 km. Within Block Habra-I & P.S.-Habra ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
632 Shifting & Height raising of 33 KV line, 11 KV line and LT line passing over the Padegaon Minor and Aajgaon canal Taluka- Deoli, Dist. Wardha
633 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Jassore road jora bridge 30.28 km.to Haldar Para 34.25 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division
634 Raising and Strengthening of Singra both bank embankment.
TRN : 835977 |  Kamrup - Assam
Contract Value : 43.66 Lacs | Agency Name : Water Resources Department
Tender award for raising and strengthening of singra both bank embankment.
635 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of koral khal from ch. 2.70 km. To 7.70 km. Within Block Habra-I & P.S.-Habra in the dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
636 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Rautara Bridge 25.63 km Sohai-Swetpur road to near jassore road jora bridge 30.23 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division.
637 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from outfall to start point (Length 5.015 KM.) of panskhali khal at Block- Barasat-II, P.S.-Sashan under Bidyadhari Drainage Division.
638 Maintenance and repair to 2(two)nos. ghoges underguard wall infront sluice no. 2 on the R/B of river Ichhamati, Block & P.S.-Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division
639 Maintenance and repair to 3 vented sluice over Duma Khal near outfalling of river Ichhamati at mouza Angrail in P.S.-Bongaon of Bidyadhari Drainage Sub Division under Bidyadhari Drainage Division.
640 Clearing and removing of water hyacinth under A.M.C for a period of 08 months( from May 2020 to December 2020) from 11.79 Km to 13.64 Km over river Nonagang in P.S Barasat and Deganga Dist. North 24 parganas under Barasat Drainage Sub-division of Bidyadhari Drainage Division.

Get Water Resources Department Tender Alert...

776290

Advertisment
Advertisment