Tender Award / Tender Result for Work-A: Part-I-Design, Supply, Installation and Commissioning of Telecom system, comprising Networking switch, CCTV syst... awarded by the Central Government / Public Sector Of India in Mumbai of Maharashtra.
The successful bid value for this work was Rs 24502840.00 and the contract date was 01/11/2017.
For more details / documents like BOQ comparative chart, Technical summary, Financial summary, Bidder details, etc call us on +91 92760 83333
Basic tender award information for # 555447
Tender Award / Tender Result for Work-A: Part-I-Design, Supply, Installation and Commissioning of Telecom system, comprising Networking switch, CCTV system, EPABX system in ENNORE MANALI Spur Line section of ETBPNMTPL Gas Pipeline. Part-II-Comprehensive Annual Maintenance for 5 years after completion of defect liability period comprising network switch , CCTV system and EPABX system etc. of Part I of Work-A Work-B:Part-I-Design, Supply, Installation and Commissioning of Telecom system, comprising Networking switch, CCTV system, EPABX system in RAMNATHPURAM – TUTICORIAN section of ETBPNMTPL Gas Pipeline. Part-II-Comprehensive Annual Maintenance for 5 years after completion of defect liability period comprising CCTV system and EPABX system etc. of Part I of Work-B
Agency : Indian Oil Corporation Limited
Location : Mumbai - Maharashtra