You have searched for burdwan-west-bengal- in Awarded Tender Result. Click on any tender to view further details.

1731 Construction of 01 no. drive head chamber in R-IV seam of Khottadih Colliery under Pandaveswar Area, ECL.
TRN : 658247 |  Burdwan - West Bengal
Contract Value : 3.13 Lacs | Agency Name : Eastern Coal Fields Ltd.
Tender award for construction of 01 no. drive head chamber in r-iv seam of khottadih colliery under pandaveswar area, ecl.
1732 Establishment of roof supporting by cross stitching proposed caving panel B8A, B8B and B8C panel in R VI seam of Khottadih Colliery under Pandaveswar Area, ECL.
1733 Transportation of Coal from tippler to ground stock, Kalidaspur Project/ MS Siding and loading and transporting from Ground stock to MS Siding during FY 2019-20
1734 Transportation of coal from Crusher Point of Jambad OCP to Naba Kajora Madhabpur Rly. Siding for the period 2019-20
TRN : 656001 |  Burdwan - West Bengal
Contract Value : 1.97 Crore | Agency Name : Eastern Coal Fields Ltd.
Tender award for transportation of coal from crusher point of jambad ocp to naba kajora madhabpur rly. siding for the period 2019-20
1735 The Construction of Water Transmission Arrangement at Majherpara State Owned old Major RLI sites in Purba Bardhaman district sanctioned under RIDF-XXIV Programme
1736 Construction of Water Transmission Arrangement at state owned Kotshimul old Major RLI in Raina-II Block under Burdwan (Agri-Mech) under Core 2018-19 Programme
1737 Hiring of HEMM for Removal and Transportation of 40 L.Cum of OB of Jambad OC Patch of Kajora Area
TRN : 654904 |  Burdwan - West Bengal
Contract Value : 27.18 Crore | Agency Name : Eastern Coal Fields Ltd.
Tender award for hiring of hemm for removal and transportation of 40 l.cum of ob of jambad oc patch of kajora area
1738 Construction of Pump House and Water Transmission Arrangement of Bilbari Midi RLI site at Memari-II Block under Burdwan (Agri-Mech) division Sanctioned under CORE 2018-19 Programme
1739 The Construction of Water Transmission Arrangement at Babladanga State Owned old Major RLI sites in Purba Bardhaman district sanctioned under RIDF-XXIV Programme
1740 Construction of Pump House and Water Transmission Arrangement of Paik Para Major RLI Site at Jamalpur Block in Purba Bardhaman District under Core Sector 2018-19 Programme

Get Burdwan Awarded Tender Alert...

103167

Advertisment
Advertisment