You have searched for gwalior-madhya-pradesh- in Awarded Tender Result. Click on any tender to view further details.

761 estimate for lt line1.5km lighting and dewatering of dam galleryat mahuar dam distt shivpuri under sdo L/M E/Msubdn gwalior
TRN : 705917 |  Gwalior - Madhya Pradesh
Contract Value : 4.45 Lacs | Agency Name : Water Resources Department
Tender award for estimate for lt line1.5km lighting and dewatering of dam galleryat mahuar dam distt shivpuri under sdo l/m e/msubdn gwalior
762 Collection of B.T. Metal - 1-Datia Rest House campus 2-Bhander Colony campus 3-Indergarh Rest house campus 4-Soundha Rest house campus AT DISTT-DATIA (M.P.)
763 Renovation of 01 Nos Nonfunctional Piped Water Supply Schemes of Village SAGAR Block CHACHODA District Guna Including 45 Days Trial Run and 12 months Operation and Maintenance
764 Renovation of 01 Nos Nonfunctional Piped Water Supply Schemes of Village JHUKRA Block CHACHODA District Guna Including 45 Days Trial Run and 12 months Operation and Maintenance
765 Renovation of 01 Nos Nonfunctional Piped Water Supply Schemes of Village BEEJNIPURA Block CHACHODA District Guna Including 45 Days Trial Run and 12 months Operation and Maintenance
766 Renovation of 01 Nos Nonfunctional Piped Water Supply Schemes of Village KHUTIYAWAD Block GUNA District Guna Including 45 Days Trial Run and 12 months Operation and Maintenance
767 Renovation of 01 Nos Nonfunctional Piped Water Supply Schemes of Village HINOTIYA Block GUNA District Guna Including 45 Days Trial Run and 12 months Operation and Maintenance.
768 Survey, Investigation, Design and Construction of C.M. Piped Water Supply Scheme at Village - SIRI Block GUNNOR Distt. Panna based on Tube wells including installation of electric submersible/centrifugal water motor pump, construction of 20 KL R.C.C Sump well cum pump house, construction of 175 KL R.C.C. OHT 12 Mtr. staging, laying & jointing of rising main and distribution pipe line system, household tap connections, construction of pump house, Site Development around OHT, and electric power connections at Tube wells and sump well including cost of all material & labour with 30 Days Trial Run/Commissioning period and 24 Months Operation and Maintenance of entire scheme.
769 Survey, Investigation, Design and Construction of C.M. Piped Water Supply Scheme at Village - HINAUTI BELI Block GUNNOR Distt. Panna based on Tube wells including installation of electric submersible/centrifugal water motor pump, construction of 20 KL R.C.C Sump well cum pump house, construction of 125 KL R.C.C. OHT 12 Mtr. staging, laying & jointing of rising main and distribution pipe line system, household tap connections, construction of pump house, Site Development around OHT, and electric power connections at Tube wells and sump well including cost of all material & labour with 30 Days Trial Run/Commissioning period and 24 Months Operation and Maintenance of entire scheme.
770 Jhirn-Shirn Piped Water Supply Scheme
TRN : 684959 |  Gwalior - Madhya Pradesh
Contract Value : 1.28 Crore | Agency Name : Public Health Engineering Department
Tender award for jhirn-shirn piped water supply scheme

Get Gwalior Awarded Tender Alert...

646940

Advertisment
Advertisment