You have searched for howrah-west-bengal- in Awarded Tender Result. Click on any tender to view further details.

501 Construction of Drain from the end of Nabin sangha club to Radhanath Banerjee lane via Swimming centre club.(SCHEME ID-28/SP/2018-19)
502 Construction of Concrete Road from 5, kali kumar Mukherjee Lane to 15 Dharmatala lane, Howrah (Scheme Id no-6/SP/2018-19)
TRN : 519991 |  Howrah - West Bengal
Contract Value : 14.34 Lacs | Agency Name : Howrah Improvement Trust
Tender award for construction of concrete road from 5, kali kumar mukherjee lane to 15 dharmatala lane, howrah (scheme id no-6/sp/2018-19)
503 Construction of Concrete Road from 1, No Dharmatala Lane to 17 no Lane Howrah (Scheme Id No-5/SP/2018-19)
TRN : 519992 |  Howrah - West Bengal
Contract Value : 22.08 Lacs | Agency Name : Howrah Improvement Trust
Tender award for construction of concrete road from 1, no dharmatala lane to 17 no lane howrah (scheme id no-5/sp/2018-19)
504 GROUP-II (PART-A): Design, supply, installation, testing & commissioning of SCADA system and Pipeline Application Software, including integration of SCADA system with PLC based control system for Paradip, Visakhapatnam, Rajahmundry & Vijayawada stations of Paradip - Hyderabad pipeline and Annual Maintenance Contract for a period of five years after defect liability period. GROUP-II(PART-B): Design, supply, installation, testing & commissioning of SCADA system, including integration of SCADA system with PLC based control system for Berhampur, Atchutapuram & Hyderabad stations and integration with SCADA and Pipeline Application Software of Group-II (Part-A) of Paradip - Hyderabad pipeline and Annual Maintenance Contract for a period of five years after defect liability period
505 GROUP-I (PART-A):Design, supply, installation, testing & commissioning of Instrumentation, PLC-based Control system, Fire and Gas alarm detection system for Paradip, Visakhapatnam, Rajahmundry & Vijayawada stations of Paradip - Hyderabad pipeline and Annual Maintenance Contract for a period of five years after defect liability period. GROUP-I (PART-B): Design, supply, installation, testing & commissioning of Instrumentation, PLC-based Control system, Fire and Gas alarm detection system for Berhampur, Atchutapuram & Hyderabad stations of Paradip - Hyderabad pipeline and Annual Maintenance Contract for a period of five years after defect liability period.
506 SINKING OF MAYA 09 DWP FITTED (80MMX40MM DIA TUBE WELL IN DIFFERENT G.P. UNDER ULUBERIA-IDEV. BLOCK, ULUBERIA, HOWRAH.
507 Carrying out Detailed Engineering Survey, Soil Investigation, Cadastral Survey, obtaining Permissions and Providing services for Opening of ROW for various proposed pipelines from Koyali to Dumad
508 Improvement of existing infrastructure with electricity, running and drinking water, toilet, mid-day meal shed, ACR, Comp. Lab, common room, modular portable security cabin, cycle stand etc. in 51 Madrasahs in N 24 Pgs. - for Hatiara High Madrasah.
509 Name of Work: -SINKING OF MAYA 09 DWP FITTED (80MMX40MM DIA TUBE WELL IN DIFFERENT G.P. UNDER ULUBERIA-IDEV. BLOCK, ULUBERIA, HOWRAH.
510 PROCUREMENT OF RELAY TESTING KIT
TRN : 511924 |  Howrah - West Bengal
Contract Value : 5.04 Lacs | Agency Name : Mahanadi Coalfields Limited
Tender award for procurement of relay testing kit

Get Howrah Awarded Tender Alert...

666969

Advertisment
Advertisment