You have searched for kolkata-west-bengal- in Awarded Tender Result. Click on any tender to view further details.

5381 Renovation of barrack and office at Alipore Police Lines of Directorate of Security, WB - Roof treatment work with APP membrane at Alipore Police barrack (East side) of Directorate of Security in the compound of Bhabani Bhaban, Alipore, during the year 2018-19 (This office Estimate no.65/Fund/C of 2018-19 of EE I Alipore Division PWD) (G O No.539-e-bantan/2018-19/BMC/5B-198/18 dt.25.09.2018)
5382 Restoration & Reconstruction of damaged Portion of Pathways along E.D Channel with supply of Paver Block, channel from Sukantanagar to AL-BL at Sector -V Salt Lake under NDITA. Name of Work: Restoration & Reconstruction of damaged Portion of Pathways along E.D Channel with supply of Paver Block, channel from Sukantanagar to AL-BL at Sector -V Salt Lake under NDITA. Name of Work: Restoration & Reconstruction of damaged Portion of Pathways along E.D Channel with supply of Paver Block, channel from Sukantanagar to AL-BL at Sector -V Salt Lake under NDITA.
5383 Emergent repair and renovation by retrofitting and rehabilitation of Ground Floor at Sidhu Kanu Hostel, during the year 2018-2019.
5384 WBNKDA/32/EE-I/NKDA/2018-19 -2nd Call - Construction of ATM Cubicle in front of carparking lot of NTBC under New Town Kolkata Development Authority -5542 /NKDA/Engg-36/ 2010
5385 Construction of Bituminous Road with Footpath & Storm water Drainage System at AQ-14 from Parking Lot to Link Road connection at Sector-V under NDITA.
5386 Emergent restoration of rain damaged road surface in stretches from 20.00 km to 24.00 km of NH-10 in the district of Kalimpong during the year 2018-19.
5387 Construction of Bituminous Road with Footpath & Storm water Drainage System at AQ-14 from Parking Lot to Link Road connection at Sector-V under NDITA.
5388 Emergent restoration of rain damaged road surface in stretches from 14.00 km to 20.00 km of NH-10 in the district of Kalimpong during the year 2018-19.
5389 Construction of underground cable duct through Micro tunnelling method on one side of footpath ( 3nos. 150mm dia × 1 Side) from Wipro to WBSETCL with allied works (Phase - II) at Sector-V, Salt Lake under Nabadiganta Industrial Township Authority.
5390 Emergent restoration of rain damaged road surface in stretches from 9.00 km to 14.00 km of NH-10 in the district of Kalimpong during the year 2018-19.

Get Kolkata Awarded Tender Alert...

156563

Advertisment
Advertisment