You have searched for north-24-paragana-west-bengal- in Awarded Tender Result. Click on any tender to view further details.

81 K.N.I. Avenue (V.I.P. Road) from 0.00 kmp to 6.00 kmp Patch Repair under Baguiati Highway Sub-Division of Barasat Highway Division No-I, in the district of North 24 Parganas during 2020-2021
82 Construction of 03 nos of eight Storied (G plus 7) Lower Subordinate Residential Block with Boundary Wall, Pathway, Draining, Compound Lighting etc. at Baguihati P.S. under Bidhanagar Police Commissionerate.
83 K.N.I. Avenue (V.I.P. Road) from 6.00 kmp to 8.00 kmp Patch Repair under Baguiati Highway Sub-Division of Barasat Highway Division No-I, in the district of North 24 Parganas during 2020-2021
84 Raising , Strengthening and improvement of Sundarban Embankment including Armouring with 20 cm. thick dry brick pitching along left bank of river Dansa and Boro Kalagachi at Mouza Khulna for a length of 405.00 M from Ch. 47.500 K.M. to 47.695 K.M. & Ch. 47.900 K.M. to 48.110K.M., Block- Sandeshkhali- II & P.S. :- Sandeshkhali , Dist. North 24 Parganas
85 Berachampa-Baduria Road from 5.00 kmp to 8.00 kmp Patch repair under Basirhat Highway Sub-Division of Barasat Highway Division No-I, in the district of North 24 Parganas during 2020-2021
86 Oiling and greasing for sluice gates of different Sluices (Sluice no-1,2,3,4,5 and Berigopalpur) at Bongaon and Berigopalpur at Bidyadhari Drainage sub Division of Bidyadhari Drainage Division during 2020-21
87 Cutting and removing of grass and jungles etc. from the compound of Banipur Rest Shed along with the different category of works at Bidyadhari Drainage sub Division, Bongaon of Bidyadhari Drainage Division, Dist:-North 24 Parganas during 2020-21
88 Jungle cutting , Pond cleaning, clearing of internal drain and cleaning of office floor inside Bidyadhari Drainage Division Colony Campus at Barasat, Taki Road, North24 PGS. under Bidyadhari Drainage Division, period from May 2020 to December 2020
89 Clearing and removing of water hyacinth under Annual Maintenance Contract for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Nagla Khal from ch. 0.00 km. to 6.00 km. Within Block Habra-I & P.S.-Habra ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
90 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Jassore road jora bridge 30.28 km.to Haldar Para 34.25 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division

Get North 24 Paragana Awarded Tender Alert...

465617

Advertisment
Advertisment