131Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-25)
The Following works are involved in this package
1. Improvements to Riding Quality at km 0/0 - 4/6 of Katchupalli - Alagappampalayam - Elampillai road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4537)
2.Widening from Single lane to Intermediate lane and Improvements of Kattinaickanpatti - Manikampatti Road at km 0/0 - 2/290 including CD works Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2610)
3.Construction of retaining wall at Km 0/4,0/10,1/2,1/4,1/6 & 2/2 of Kattinaickanpatti - Manikampatti Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2631)
4.Widening from Single lane to Intermediate lane and Improvements of Manikampatty - Avadathur Road at km 0/0 - 1/6 including CD works and
construction of retaining wall Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2611)
5.Improvements to Riding Quality at km 3/0 - 5/8 of Vanavasi- Kuppampatty (via) Sanaraptty road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4540)
6.Construction of Retaining wall at km 4/2 and 4/4 of Malaiyanur Road Includingupkeeping for a period of 60 months (01-CRIDP-19-20-O-2641)
7.Improvements to Riding Quality at km 0/0 - 1/6 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4546)
8.Improvements to Riding Quality at km 1/6 - 3/055 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4547)"
TRN :
720170
|
Salem - Tamil Nadu
Contract Value :
6.21 Crore |Agency Name :
Highway Department
132Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31)
The Following works are involved in this package
1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383
2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384
3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378
4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527
5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531
6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN :
719193
|
Salem - Tamil Nadu
Contract Value :
5.77 Crore |Agency Name :
Highway Department
133Improvements to Roads and Improvements to Riding Quality to Government Roads including Consruction, Reconstruction of Box Culverts, Construction of Retaining Wall in Salem (H) C &M,Sub Division (Package-4)
The Following works are involved in this package
1. Improvements of Mallur - Mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2589) 2. Reconstruction of Box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of Mallur - Mookuthipalayam road and Construction of Drain at Km 0/2,0/4,0/6. 3. Improvements of Mallur - Mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2606) 4. Improvements to Riding Quality at km 1/0 - 3/609 of Poolavari - Parapatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2590) 5. Improvements to Riding Quality at km 0/0 - 1/2 of Jari Kondalampatty Paranattamangalam road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4509) 6. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 0/0 - 1/0 (MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1295) 7. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 1/0 - 3/4 including Construction of culvert at km 2/10, 3/2 and Construction of Retaining wall at Km 1/10(MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1296) 8. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 3/4 - 5/0 including Construction of retaining wall at Km 2/2, 4/6, 4/10 and curve improvements at Km 4/8,4/10(MD 594) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1304) "
TRN :
720178
|
Salem - Tamil Nadu
Contract Value :
7.48 Crore |Agency Name :
Highway Department
134Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29)
The Following works are involved in this package
1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525)
2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397)
4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323)
5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624)
6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635)
7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539)
8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637)
9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549)
10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN :
719194
|
Salem - Tamil Nadu
Contract Value :
6.31 Crore |Agency Name :
Highway Department
135Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31)
The Following works are involved in this package
1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383
2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384
3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378
4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527
5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531
6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN :
720192
|
Salem - Tamil Nadu
Contract Value :
5.77 Crore |Agency Name :
Highway Department
136Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Protective Walls and up keeping the roads for a period of 60 months in Yercaud C&M Sub Division (Package-16)
The Following works are involved in this package
1.Improvements to Riding Quality at km 11/0 -12/0 and 13/0 - 14/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 -I-4466
2.Improvements to Riding Quality at km 14/0 -16/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4467
3.Improvements of Salem Junction to Yercadu Road at km 25/0 - 26/4 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0348
4.Improvements of Salem Junction to Yercadu Road at km 26/4 - 28/0 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0349
5.Improvements to Riding Quality at km 5/0 - 7/4 and 11/0 - 12/0 of Yercaud loop Road (MD 563) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4478
"
TRN :
719176
|
Salem - Tamil Nadu
Contract Value :
6.80 Crore |Agency Name :
Highway Department
137Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29)
The Following works are involved in this package
1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525)
2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397)
4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323)
5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624)
6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635)
7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539)
8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637)
9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549)
10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN :
720194
|
Salem - Tamil Nadu
Contract Value :
6.31 Crore |Agency Name :
Highway Department
138Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-25)
The Following works are involved in this package
1. Improvements to Riding Quality at km 0/0 - 4/6 of Katchupalli - Alagappampalayam - Elampillai road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4537)
2.Widening from Single lane to Intermediate lane and Improvements of Kattinaickanpatti - Manikampatti Road at km 0/0 - 2/290 including CD works Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2610)
3.Construction of retaining wall at Km 0/4,0/10,1/2,1/4,1/6 & 2/2 of Kattinaickanpatti - Manikampatti Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2631)
4.Widening from Single lane to Intermediate lane and Improvements of Manikampatty - Avadathur Road at km 0/0 - 1/6 including CD works and
construction of retaining wall Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2611)
5.Improvements to Riding Quality at km 3/0 - 5/8 of Vanavasi- Kuppampatty (via) Sanaraptty road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4540)
6.Construction of Retaining wall at km 4/2 and 4/4 of Malaiyanur Road Includingupkeeping for a period of 60 months (01-CRIDP-19-20-O-2641)
7.Improvements to Riding Quality at km 0/0 - 1/6 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4546)
8.Improvements to Riding Quality at km 1/6 - 3/055 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4547)"
TRN :
719182
|
Salem - Tamil Nadu
Contract Value :
6.21 Crore |Agency Name :
Highway Department
139Improvements to Roads and Improvements to Riding Quality to Government Roads including Consruction, Reconstruction of Box Culverts, Construction of Retaining Wall in Salem (H) C &M,Sub Division (Package-4)
The Following works are involved in this package
1. Improvements of Mallur - Mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2589) 2. Reconstruction of Box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of Mallur - Mookuthipalayam road and Construction of Drain at Km 0/2,0/4,0/6. 3. Improvements of Mallur - Mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2606) 4. Improvements to Riding Quality at km 1/0 - 3/609 of Poolavari - Parapatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2590) 5. Improvements to Riding Quality at km 0/0 - 1/2 of Jari Kondalampatty Paranattamangalam road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4509) 6. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 0/0 - 1/0 (MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1295) 7. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 1/0 - 3/4 including Construction of culvert at km 2/10, 3/2 and Construction of Retaining wall at Km 1/10(MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1296) 8. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 3/4 - 5/0 including Construction of retaining wall at Km 2/2, 4/6, 4/10 and curve improvements at Km 4/8,4/10(MD 594) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1304) "
TRN :
719186
|
Salem - Tamil Nadu
Contract Value :
7.48 Crore |Agency Name :
Highway Department
140Strengthening, Widening, Improvements, Improvements to Riding Quality to Government Roads including CD works and Protective works and up keeping the roads for a period of 60 months in Denkanikottai (H) C&M Sub Division (Package 71)
The Following works are involved in this package:
1. Widening from Single lane to Intermediate lane and Strengthening of Denkanikottai -Jawalagiri - Karnataka State limit road at km 9/4-10/8 including CD Works and Protective works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2725)
2.Widening from Single lane to Intermediate lane and Strengthening of Denkanikottai -Jawalagiri - Karnataka State limit road at km 10/8-12/4 including CD Works and Protective works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2726)
3.Improvements of Denkanikottai-Bettamugilalam Road at Km 14/6-19/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2743)
4.Improvements to Riding Quality at Km 22/0-26/0 of Denkanikottai-Bettamugilalam Road. including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4656)
5.Improvements to Riding Quality at Km 12/0-13/2 and 26/0-28/0 of Denkanikottai-Bettamugilalam Road Using Plastic waste including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4664)
6.Improvements to Riding Quality at Km 0/0-2/8 of Bellampalli-Kempathpalli Road Using Plastic waste including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4665)
7.Construction Protective Wall in Tank Bund Portion at Km 2/8 & 2/10 of Denkanikottai -Jawalagiri - Karnataka State limit road (01-CRIDP-19-20-O-2757)"
TRN :
721774
|
Salem - Tamil Nadu
Contract Value :
7.48 Crore |Agency Name :
Highway Department