You have searched for salem-tamil-nadu- in Awarded Tender Result. Click on any tender to view further details.

131 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-25) The Following works are involved in this package 1. Improvements to Riding Quality at km 0/0 - 4/6 of Katchupalli - Alagappampalayam - Elampillai road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4537) 2.Widening from Single lane to Intermediate lane and Improvements of Kattinaickanpatti - Manikampatti Road at km 0/0 - 2/290 including CD works Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2610) 3.Construction of retaining wall at Km 0/4,0/10,1/2,1/4,1/6 & 2/2 of Kattinaickanpatti - Manikampatti Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2631) 4.Widening from Single lane to Intermediate lane and Improvements of Manikampatty - Avadathur Road at km 0/0 - 1/6 including CD works and construction of retaining wall Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2611) 5.Improvements to Riding Quality at km 3/0 - 5/8 of Vanavasi- Kuppampatty (via) Sanaraptty road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4540) 6.Construction of Retaining wall at km 4/2 and 4/4 of Malaiyanur Road Includingupkeeping for a period of 60 months (01-CRIDP-19-20-O-2641) 7.Improvements to Riding Quality at km 0/0 - 1/6 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4546) 8.Improvements to Riding Quality at km 1/6 - 3/055 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4547)"
TRN : 720170 |  Salem - Tamil Nadu
Contract Value : 6.21 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works and construction of retaining wall and up keeping for a period of 60 months in edappady (h) c&m sub division (package-25) the following works are involved in this package 1. improvements to riding quality at km 0/0 - 4/6 of katchupalli - alagappampalayam - elampillai road including upkeeping for a period of 60 months (01-cridp-19-20-i-4537) 2.widening from single lane to intermediate lane and improvements of kattinaickanpatti - manikampatti road at km 0/0 - 2/290 including cd works including upkeeping for a period of 60 months (01-cridp-19-20-0-2610) 3.construction of retaining wall at km 0/4,0/10,1/2,1/4,1/6 & 2/2 of kattinaickanpatti - manikampatti road including upkeeping for a period of 60 months (01-cridp-19-20-o-2631) 4.widening from single lane to intermediate lane and improvements of manikampatty - avadathur road at km 0/0 - 1/6 including cd works and construction of retaining wall including upkeeping for a period of 60 months (01-cridp-19-20-0-2611) 5.improvements to riding quality at km 3/0 - 5/8 of vanavasi- kuppampatty (via) sanaraptty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4540) 6.construction of retaining wall at km 4/2 and 4/4 of malaiyanur road includingupkeeping for a period of 60 months (01-cridp-19-20-o-2641) 7.improvements to riding quality at km 0/0 - 1/6 of ettikuttaimedu - elavampalayam - pallipatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4546) 8.improvements to riding quality at km 1/6 - 3/055 of ettikuttaimedu - elavampalayam - pallipatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4547)"
132 Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31) The Following works are involved in this package 1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383 2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384 3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378 4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527 5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531 6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN : 719193 |  Salem - Tamil Nadu
Contract Value : 5.77 Crore | Agency Name : Highway Department
Tender award for improvements to government roads including construction of culverts and retaining wall and up keeping for a period of 60 months in omalur (h) c&m sub division (package-31) the following works are involved in this package 1) improvements of sankari - mecheri road (via) edappady at km 36/2- 38/2 (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-s-0383 2) improvements of sankari - mecheri road (via) edappady at km 38/2-40/2 and 41/2- 41/4 (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-s-0384 3) improvements of tharamangalam - jalagandapuram road at km 5/0 - 6/0 including construction of retaining wall at km.2/4 - 3/0 (sh 219a) including upkeeping for a period of 60 months 01-cridp-19-20-s-0378 4) improvements to riding quality at km 6/0 - 7/0 of tharamangalam jalagandapuram road (sh-219a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4527 5) improvements to the riding quality at km 9/0 - 11/4 of tharamangalam - nangavalli - kunjandiyur road(sh-223) including upkeeping for a period of 60 months 01-cridp-19-20-i-4531 6) construction of retaining wall at km. 9/4- 9/6 of tharamangalam - nangavalli- kunjandiyur road including cd works (sh-223) 01-cridp-19-20-s-0406 7) construction of retaining wall at km.0/8,1/2,1/6and 1/8 of tholasampatty -mallapanur road including reconstruction of box culvert at km 1/8 ( md 1174a) 01-cridp-19-20-m-1325"
133 Improvements to Roads and Improvements to Riding Quality to Government Roads including Consruction, Reconstruction of Box Culverts, Construction of Retaining Wall in Salem (H) C &M,Sub Division (Package-4) The Following works are involved in this package 1. Improvements of Mallur - Mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2589) 2. Reconstruction of Box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of Mallur - Mookuthipalayam road and Construction of Drain at Km 0/2,0/4,0/6. 3. Improvements of Mallur - Mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2606) 4. Improvements to Riding Quality at km 1/0 - 3/609 of Poolavari - Parapatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2590) 5. Improvements to Riding Quality at km 0/0 - 1/2 of Jari Kondalampatty Paranattamangalam road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4509) 6. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 0/0 - 1/0 (MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1295) 7. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 1/0 - 3/4 including Construction of culvert at km 2/10, 3/2 and Construction of Retaining wall at Km 1/10(MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1296) 8. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 3/4 - 5/0 including Construction of retaining wall at Km 2/2, 4/6, 4/10 and curve improvements at Km 4/8,4/10(MD 594) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1304) "
TRN : 720178 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for improvements to roads and improvements to riding quality to government roads including consruction, reconstruction of box culverts, construction of retaining wall in salem (h) c &m,sub division (package-4) the following works are involved in this package 1. improvements of mallur - mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2589) 2. reconstruction of box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of mallur - mookuthipalayam road and construction of drain at km 0/2,0/4,0/6. 3. improvements of mallur - mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2606) 4. improvements to riding quality at km 1/0 - 3/609 of poolavari - parapatty road including upkeeping for a period of 60 months. (01-cridp-19-20-o-2590) 5. improvements to riding quality at km 0/0 - 1/2 of jari kondalampatty paranattamangalam road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4509) 6. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 0/0 - 1/0 (md 594) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1295) 7. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 1/0 - 3/4 including construction of culvert at km 2/10, 3/2 and construction of retaining wall at km 1/10(md 594) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1296) 8. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 3/4 - 5/0 including construction of retaining wall at km 2/2, 4/6, 4/10 and curve improvements at km 4/8,4/10(md 594) including upkeeping for a period of 60 months (01-cridp-19-20-m-1304) "
134 Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29) The Following works are involved in this package 1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525) 2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397) 4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323) 5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624) 6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635) 7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539) 8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637) 9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549) 10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN : 719194 |  Salem - Tamil Nadu
Contract Value : 6.31 Crore | Agency Name : Highway Department
Tender award for widening and improvements to riding quality to government roads including construction of cd works, storm water drain, retaining wall and well protective wall and up keeping for a period of 60 months in omalur (h) c&m sub division (package-29) the following works are involved in this package 1) improvements to the riding quality at km. 3/6- 5/0 of tharamangalam - nangavalli- kunjandiyur road (sh-223) including upkeeping for a period of 60 months (01-cridp-19-20-i-4525) 2) construction of drain at km 1/2- 1/8 (both sides) of tharamangalam - nangavalli- kunjandiyur road including well protective wall at km.1/2 and cd works (sh-223) (01-cridp-19-20-s-0391) 3) construction of retaining wall at km 14/8- 15/0 of jagir ammapalayam-tharamangalam road (sh-219) (01-cridp-19-20-s-0397) 4) construction of drain at km. 1/8- 2/2 of karuppur-vellapatty-thathiyangarpatty road (md 1175) (01-cridp-19-20-m-1323) 5) improvements of omalur-muthunaickenpatty- alagusamuthiram road at km 2/6-7/2 including construction of storm water drain at km 7/8- 8/2 and construction of retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-cridp-19-20-0-2624) 6) construction of drain at km. 1/2-1/8 of thekkampatty – moongilpaddy road (01-cridp-19-20-0-2635) 7) improvements to the riding quality at km 4/0- 6/4 tharamangalam- vanavasi road to sedapatty (via) ariyampatty- s.karattupatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4539) 8) construction of drain at km. 0/2- 1/2 of puliyampatty-karuppur road including cd works (01-cridp-19-20-o-2637) 9) improvements to riding quality at km 0/0-4/2 of km 7/0 of omalur– sankari- thiruchengode- paramathi road to muthunaikenpatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4549) 10) construction of drain at km 8/4- 8/8 (both sides) of tharamangalam- vanavasi road to sedapatty (via) ariyampatty- s.karattupatty road including construction of box culvert at km. 8/8 01-cridp-19-20-o-2632"
135 Improvements to Government Roads including Construction of culverts and Retaining wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-31) The Following works are involved in this package 1) Improvements of Sankari - Mecheri road (via) Edappady at km 36/2- 38/2 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0383 2) Improvements of Sankari - Mecheri road (via) Edappady at km 38/2-40/2 and 41/2- 41/4 (SH 220) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0384 3) Improvements of Tharamangalam - Jalagandapuram Road at km 5/0 - 6/0 including Construction of Retaining wall at km.2/4 - 3/0 (SH 219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0378 4) Improvements to Riding Quality at km 6/0 - 7/0 of Tharamangalam Jalagandapuram road (SH-219A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4527 5) Improvements to the Riding Quality at km 9/0 - 11/4 of Tharamangalam - Nangavalli - Kunjandiyur road(SH-223) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4531 6) Construction of Retaining wall at km. 9/4- 9/6 of Tharamangalam - Nangavalli- Kunjandiyur Road including CD works (SH-223) 01-CRIDP-19-20-S-0406 7) Construction of Retaining Wall at km.0/8,1/2,1/6and 1/8 of Tholasampatty -Mallapanur road including Reconstruction of Box Culvert at km 1/8 ( MD 1174A) 01-CRIDP-19-20-M-1325"
TRN : 720192 |  Salem - Tamil Nadu
Contract Value : 5.77 Crore | Agency Name : Highway Department
Tender award for improvements to government roads including construction of culverts and retaining wall and up keeping for a period of 60 months in omalur (h) c&m sub division (package-31) the following works are involved in this package 1) improvements of sankari - mecheri road (via) edappady at km 36/2- 38/2 (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-s-0383 2) improvements of sankari - mecheri road (via) edappady at km 38/2-40/2 and 41/2- 41/4 (sh 220) including upkeeping for a period of 60 months 01-cridp-19-20-s-0384 3) improvements of tharamangalam - jalagandapuram road at km 5/0 - 6/0 including construction of retaining wall at km.2/4 - 3/0 (sh 219a) including upkeeping for a period of 60 months 01-cridp-19-20-s-0378 4) improvements to riding quality at km 6/0 - 7/0 of tharamangalam jalagandapuram road (sh-219a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4527 5) improvements to the riding quality at km 9/0 - 11/4 of tharamangalam - nangavalli - kunjandiyur road(sh-223) including upkeeping for a period of 60 months 01-cridp-19-20-i-4531 6) construction of retaining wall at km. 9/4- 9/6 of tharamangalam - nangavalli- kunjandiyur road including cd works (sh-223) 01-cridp-19-20-s-0406 7) construction of retaining wall at km.0/8,1/2,1/6and 1/8 of tholasampatty -mallapanur road including reconstruction of box culvert at km 1/8 ( md 1174a) 01-cridp-19-20-m-1325"
136 Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Protective Walls and up keeping the roads for a period of 60 months in Yercaud C&M Sub Division (Package-16) The Following works are involved in this package 1.Improvements to Riding Quality at km 11/0 -12/0 and 13/0 - 14/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 -I-4466 2.Improvements to Riding Quality at km 14/0 -16/0 of Salem Junction to Yercadu Road (SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4467 3.Improvements of Salem Junction to Yercadu Road at km 25/0 - 26/4 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0348 4.Improvements of Salem Junction to Yercadu Road at km 26/4 - 28/0 including Construction of CC Drain & Protective works(SH 188) including upkeeping for a period of 60 months 01-CRIDP-19-20 - S-0349 5.Improvements to Riding Quality at km 5/0 - 7/4 and 11/0 - 12/0 of Yercaud loop Road (MD 563) including upkeeping for a period of 60 months 01-CRIDP-19-20 - I-4478 "
137 Widening and Improvements to Riding Quality to Government Roads including Construction of CD works, Storm water Drain, Retaining wall and Well Protective wall and Up keeping for a period of 60 months in Omalur (H) C&M Sub Division (Package-29) The Following works are involved in this package 1) Improvements to the Riding Quality at km. 3/6- 5/0 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4525) 2) Construction of Drain at km 1/2- 1/8 (both sides) of Tharamangalam - Nangavalli- Kunjandiyur Road including Well protective wall at km.1/2 and CD works (SH-223) (01-CRIDP-19-20-S-0391) 3) Construction of Retaining wall at km 14/8- 15/0 of Jagir Ammapalayam-Tharamangalam Road (SH-219) (01-CRIDP-19-20-S-0397) 4) Construction of Drain at km. 1/8- 2/2 of Karuppur-Vellapatty-Thathiyangarpatty road (MD 1175) (01-CRIDP-19-20-M-1323) 5) Improvements of Omalur-Muthunaickenpatty- Alagusamuthiram road at Km 2/6-7/2 including Construction of Storm water Drain at km 7/8- 8/2 and Construction of Retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2624) 6) Construction of Drain at km. 1/2-1/8 of Thekkampatty – Moongilpaddy road (01-CRIDP-19-20-0-2635) 7) Improvements to the Riding Quality at Km 4/0- 6/4 Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4539) 8) Construction of Drain at km. 0/2- 1/2 of Puliyampatty-Karuppur road including CD works (01-CRIDP-19-20-O-2637) 9) Improvements to Riding Quality at km 0/0-4/2 of Km 7/0 of omalur– sankari- Thiruchengode- Paramathi road to Muthunaikenpatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4549) 10) Construction of Drain at km 8/4- 8/8 (both sides) of Tharamangalam- Vanavasi road to Sedapatty (via) Ariyampatty- S.Karattupatty road including Construction of Box culvert at km. 8/8 01-CRIDP-19-20-O-2632"
TRN : 720194 |  Salem - Tamil Nadu
Contract Value : 6.31 Crore | Agency Name : Highway Department
Tender award for widening and improvements to riding quality to government roads including construction of cd works, storm water drain, retaining wall and well protective wall and up keeping for a period of 60 months in omalur (h) c&m sub division (package-29) the following works are involved in this package 1) improvements to the riding quality at km. 3/6- 5/0 of tharamangalam - nangavalli- kunjandiyur road (sh-223) including upkeeping for a period of 60 months (01-cridp-19-20-i-4525) 2) construction of drain at km 1/2- 1/8 (both sides) of tharamangalam - nangavalli- kunjandiyur road including well protective wall at km.1/2 and cd works (sh-223) (01-cridp-19-20-s-0391) 3) construction of retaining wall at km 14/8- 15/0 of jagir ammapalayam-tharamangalam road (sh-219) (01-cridp-19-20-s-0397) 4) construction of drain at km. 1/8- 2/2 of karuppur-vellapatty-thathiyangarpatty road (md 1175) (01-cridp-19-20-m-1323) 5) improvements of omalur-muthunaickenpatty- alagusamuthiram road at km 2/6-7/2 including construction of storm water drain at km 7/8- 8/2 and construction of retaining wall at km.5/6-5/8 including upkeeping for a period of 60 months (01-cridp-19-20-0-2624) 6) construction of drain at km. 1/2-1/8 of thekkampatty – moongilpaddy road (01-cridp-19-20-0-2635) 7) improvements to the riding quality at km 4/0- 6/4 tharamangalam- vanavasi road to sedapatty (via) ariyampatty- s.karattupatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4539) 8) construction of drain at km. 0/2- 1/2 of puliyampatty-karuppur road including cd works (01-cridp-19-20-o-2637) 9) improvements to riding quality at km 0/0-4/2 of km 7/0 of omalur– sankari- thiruchengode- paramathi road to muthunaikenpatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4549) 10) construction of drain at km 8/4- 8/8 (both sides) of tharamangalam- vanavasi road to sedapatty (via) ariyampatty- s.karattupatty road including construction of box culvert at km. 8/8 01-cridp-19-20-o-2632"
138 Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Construction of Retaining wall and Up keeping for a period of 60 months in Edappady (H) C&M Sub Division (Package-25) The Following works are involved in this package 1. Improvements to Riding Quality at km 0/0 - 4/6 of Katchupalli - Alagappampalayam - Elampillai road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4537) 2.Widening from Single lane to Intermediate lane and Improvements of Kattinaickanpatti - Manikampatti Road at km 0/0 - 2/290 including CD works Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2610) 3.Construction of retaining wall at Km 0/4,0/10,1/2,1/4,1/6 & 2/2 of Kattinaickanpatti - Manikampatti Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2631) 4.Widening from Single lane to Intermediate lane and Improvements of Manikampatty - Avadathur Road at km 0/0 - 1/6 including CD works and construction of retaining wall Including upkeeping for a period of 60 months (01-CRIDP-19-20-0-2611) 5.Improvements to Riding Quality at km 3/0 - 5/8 of Vanavasi- Kuppampatty (via) Sanaraptty road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4540) 6.Construction of Retaining wall at km 4/2 and 4/4 of Malaiyanur Road Includingupkeeping for a period of 60 months (01-CRIDP-19-20-O-2641) 7.Improvements to Riding Quality at km 0/0 - 1/6 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4546) 8.Improvements to Riding Quality at km 1/6 - 3/055 of Ettikuttaimedu - Elavampalayam - Pallipatty Road Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4547)"
TRN : 719182 |  Salem - Tamil Nadu
Contract Value : 6.21 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including cd works and construction of retaining wall and up keeping for a period of 60 months in edappady (h) c&m sub division (package-25) the following works are involved in this package 1. improvements to riding quality at km 0/0 - 4/6 of katchupalli - alagappampalayam - elampillai road including upkeeping for a period of 60 months (01-cridp-19-20-i-4537) 2.widening from single lane to intermediate lane and improvements of kattinaickanpatti - manikampatti road at km 0/0 - 2/290 including cd works including upkeeping for a period of 60 months (01-cridp-19-20-0-2610) 3.construction of retaining wall at km 0/4,0/10,1/2,1/4,1/6 & 2/2 of kattinaickanpatti - manikampatti road including upkeeping for a period of 60 months (01-cridp-19-20-o-2631) 4.widening from single lane to intermediate lane and improvements of manikampatty - avadathur road at km 0/0 - 1/6 including cd works and construction of retaining wall including upkeeping for a period of 60 months (01-cridp-19-20-0-2611) 5.improvements to riding quality at km 3/0 - 5/8 of vanavasi- kuppampatty (via) sanaraptty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4540) 6.construction of retaining wall at km 4/2 and 4/4 of malaiyanur road includingupkeeping for a period of 60 months (01-cridp-19-20-o-2641) 7.improvements to riding quality at km 0/0 - 1/6 of ettikuttaimedu - elavampalayam - pallipatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4546) 8.improvements to riding quality at km 1/6 - 3/055 of ettikuttaimedu - elavampalayam - pallipatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4547)"
139 Improvements to Roads and Improvements to Riding Quality to Government Roads including Consruction, Reconstruction of Box Culverts, Construction of Retaining Wall in Salem (H) C &M,Sub Division (Package-4) The Following works are involved in this package 1. Improvements of Mallur - Mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2589) 2. Reconstruction of Box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of Mallur - Mookuthipalayam road and Construction of Drain at Km 0/2,0/4,0/6. 3. Improvements of Mallur - Mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2606) 4. Improvements to Riding Quality at km 1/0 - 3/609 of Poolavari - Parapatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2590) 5. Improvements to Riding Quality at km 0/0 - 1/2 of Jari Kondalampatty Paranattamangalam road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4509) 6. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 0/0 - 1/0 (MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1295) 7. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 1/0 - 3/4 including Construction of culvert at km 2/10, 3/2 and Construction of Retaining wall at Km 1/10(MD 594) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1296) 8. Improvements of Gajalnaickenpatty- Panamarathupatty-Seshanchavadi Road at km 3/4 - 5/0 including Construction of retaining wall at Km 2/2, 4/6, 4/10 and curve improvements at Km 4/8,4/10(MD 594) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1304) "
TRN : 719186 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for improvements to roads and improvements to riding quality to government roads including consruction, reconstruction of box culverts, construction of retaining wall in salem (h) c &m,sub division (package-4) the following works are involved in this package 1. improvements of mallur - mookuthipalayam road at km 0/0 - 3/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2589) 2. reconstruction of box culvert cell of size at km 2/4,2/10,3/2,3/4,4/4 & 4/6 of mallur - mookuthipalayam road and construction of drain at km 0/2,0/4,0/6. 3. improvements of mallur - mookuthipalayam road at km 3/0 - 5/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2606) 4. improvements to riding quality at km 1/0 - 3/609 of poolavari - parapatty road including upkeeping for a period of 60 months. (01-cridp-19-20-o-2590) 5. improvements to riding quality at km 0/0 - 1/2 of jari kondalampatty paranattamangalam road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4509) 6. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 0/0 - 1/0 (md 594) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1295) 7. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 1/0 - 3/4 including construction of culvert at km 2/10, 3/2 and construction of retaining wall at km 1/10(md 594) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1296) 8. improvements of gajalnaickenpatty- panamarathupatty-seshanchavadi road at km 3/4 - 5/0 including construction of retaining wall at km 2/2, 4/6, 4/10 and curve improvements at km 4/8,4/10(md 594) including upkeeping for a period of 60 months (01-cridp-19-20-m-1304) "
140 Strengthening, Widening, Improvements, Improvements to Riding Quality to Government Roads including CD works and Protective works and up keeping the roads for a period of 60 months in Denkanikottai (H) C&M Sub Division (Package 71) The Following works are involved in this package: 1. Widening from Single lane to Intermediate lane and Strengthening of Denkanikottai -Jawalagiri - Karnataka State limit road at km 9/4-10/8 including CD Works and Protective works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2725) 2.Widening from Single lane to Intermediate lane and Strengthening of Denkanikottai -Jawalagiri - Karnataka State limit road at km 10/8-12/4 including CD Works and Protective works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2726) 3.Improvements of Denkanikottai-Bettamugilalam Road at Km 14/6-19/0 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2743) 4.Improvements to Riding Quality at Km 22/0-26/0 of Denkanikottai-Bettamugilalam Road. including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4656) 5.Improvements to Riding Quality at Km 12/0-13/2 and 26/0-28/0 of Denkanikottai-Bettamugilalam Road Using Plastic waste including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4664) 6.Improvements to Riding Quality at Km 0/0-2/8 of Bellampalli-Kempathpalli Road Using Plastic waste including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4665) 7.Construction Protective Wall in Tank Bund Portion at Km 2/8 & 2/10 of Denkanikottai -Jawalagiri - Karnataka State limit road (01-CRIDP-19-20-O-2757)"
TRN : 721774 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for strengthening, widening, improvements, improvements to riding quality to government roads including cd works and protective works and up keeping the roads for a period of 60 months in denkanikottai (h) c&m sub division (package 71) the following works are involved in this package: 1. widening from single lane to intermediate lane and strengthening of denkanikottai -jawalagiri - karnataka state limit road at km 9/4-10/8 including cd works and protective works including upkeeping for a period of 60 months. (01-cridp-19-20-o-2725) 2.widening from single lane to intermediate lane and strengthening of denkanikottai -jawalagiri - karnataka state limit road at km 10/8-12/4 including cd works and protective works including upkeeping for a period of 60 months. (01-cridp-19-20-o-2726) 3.improvements of denkanikottai-bettamugilalam road at km 14/6-19/0 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2743) 4.improvements to riding quality at km 22/0-26/0 of denkanikottai-bettamugilalam road. including upkeeping for a period of 60 months. (01-cridp-19-20-i-4656) 5.improvements to riding quality at km 12/0-13/2 and 26/0-28/0 of denkanikottai-bettamugilalam road using plastic waste including upkeeping for a period of 60 months. (01-cridp-19-20-i-4664) 6.improvements to riding quality at km 0/0-2/8 of bellampalli-kempathpalli road using plastic waste including upkeeping for a period of 60 months. (01-cridp-19-20-i-4665) 7.construction protective wall in tank bund portion at km 2/8 & 2/10 of denkanikottai -jawalagiri - karnataka state limit road (01-cridp-19-20-o-2757)"

Get Salem Awarded Tender Alert...

000565

Advertisment
Advertisment