151 Widening, Improvements, Dip raising, Curve Improvements, Improvements to Riding Quality to Government Roads including Construction and Reconstruction of Culvert, Retaining wall, Box culvert, Drain and up keeping the roads for a period of 60 months in Dharmapuri (H) C&M Sub Division (Package 55) The Following works are involved in this package 1) Improvements to Riding Quality at Km.142/6-143/740 of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4597) 2) Improvements to Riding Quality at Km.141/6-142/6 of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4598) 3) Improvements of Bommidi R.S. - Thoppaiyar road at Km.18/2-19/4 and 20/0-20/6 and including dip raising at Km.18/4, 18/6, 18/8, 20/4 and Construction of Culvert at 18/4, 18/6, 20/4 and Reconstruction of culvert at Km.18/8 (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1372) 4) Improvements of Bommidi R.S. - Thoppaiyar road at Km.21/0-22/4, including dip raising at Km.21/4, 21/8, 21/10 & 22/2, Construction of Culvert at Km.22/2 and Reconstruction of culvert at Km.21/4(i),(ii), 21/6(i),(ii), Construction of Retaining Wall and Curve improvements at Km.21/2 & 21/4 (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1373) 5) Widening from End to End and Improvements of Dharmapuri Bus Stand Approach road at Km.0/4-0/745 including Construction of Box Culvert at Km.0/8 and Construction of Drain at Km.0/4-0/745 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2692) "
TRN : 718801 |  Salem - Tamil Nadu
Contract Value : 6.51 Crore | Agency Name : Highway Department
Tender award for widening, improvements, dip raising, curve improvements, improvements to riding quality to government roads including construction and reconstruction of culvert, retaining wall, box culvert, drain and up keeping the roads for a period of 60 months in dharmapuri (h) c&m sub division (package 55) the following works are involved in this package 1) improvements to riding quality at km.142/6-143/740 of varanasi - kanyakumari road (abandoned nh-7) dharmapuri town limit (sh-129) including upkeeping for a period of 60 months (01-cridp-19-20-i-4597) 2) improvements to riding quality at km.141/6-142/6 of varanasi - kanyakumari road (abandoned nh-7) dharmapuri town limit (sh-129) including upkeeping for a period of 60 months (01-cridp-19-20-i-4598) 3) improvements of bommidi r.s. - thoppaiyar road at km.18/2-19/4 and 20/0-20/6 and including dip raising at km.18/4, 18/6, 18/8, 20/4 and construction of culvert at 18/4, 18/6, 20/4 and reconstruction of culvert at km.18/8 (md-860) including upkeeping for a period of 60 months (01-cridp-19-20-m-1372) 4) improvements of bommidi r.s. - thoppaiyar road at km.21/0-22/4, including dip raising at km.21/4, 21/8, 21/10 & 22/2, construction of culvert at km.22/2 and reconstruction of culvert at km.21/4(i),(ii), 21/6(i),(ii), construction of retaining wall and curve improvements at km.21/2 & 21/4 (md-860) including upkeeping for a period of 60 months (01-cridp-19-20-m-1373) 5) widening from end to end and improvements of dharmapuri bus stand approach road at km.0/4-0/745 including construction of box culvert at km.0/8 and construction of drain at km.0/4-0/745 including upkeeping for a period of 60 months (01-cridp-19-20-o-2692) "
152 Improvements to Riding Quality and Including Upkeeping for a Peroid of 60 Months on Government Roads in Karur (Highways), C&M, Sub Division. Package No.16 A) Improvements to Riding Quality at km 217/2 - 218/0 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months B) Improvements to Riding Quality at km 216/0 - 217/2 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months C) Improvements to Riding Quality at km 214/8 - 216/0 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months D) Improvements to Riding Quality at km 213/4 - 214/8 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months E) Improvements to Riding Quality at km 283/2 - 285/0 of Varanasi - Kanyakumari Road (Abandoned portion of NH7 at Thottakurichi and Karur) (SH 41) including upkeeping for a period of 60 months F) Improvements to Riding Quality at km 0/0 - 0/6 of New Amaravathi road including upkeeping for a period of 60 months"
153 Improvements to Riding Quality and Including Upkeeping for a Peroid of 60 Months on Government Roads in Karur (Highways), C&M, Sub Division. Package No.16 A) Improvements to Riding Quality at km 217/2 - 218/0 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months B) Improvements to Riding Quality at km 216/0 - 217/2 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months C) Improvements to Riding Quality at km 214/8 - 216/0 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months D) Improvements to Riding Quality at km 213/4 - 214/8 of Old NH 67 road Veerarackiyam to Sukkaliyur (via)Gandhigramam within the Karur town limit (SH 145) including upkeeping for a period of 60 months E) Improvements to Riding Quality at km 283/2 - 285/0 of Varanasi - Kanyakumari Road (Abandoned portion of NH7 at Thottakurichi and Karur) (SH 41) including upkeeping for a period of 60 months F) Improvements to Riding Quality at km 0/0 - 0/6 of New Amaravathi road including upkeeping for a period of 60 months"
154 Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining Wall, Box Culvert and up keeping the roads for a period of 60 months in Salem C&M Sub Division (Package-3) The Following works are involved in this package 1.Improvements of Omalur Main road in Salem at km 0/0 - 1/2 (SH 218) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0340). 2,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 204/0 - 204/8 (SH 80) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0341). 3,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 203/4 - 204/0 including Construction of Drain at Km.203/4-203/10 of Varanasi Kanyakumari road (Abandoned NH-7)(SH 80) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0342). 4,Improvements to Riding Quality at km 2/0 - 3/4 and 5/6 - 6/0 of Shevapet-Elampillai Road (MD 421) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4468). 5,Improvements to Riding Quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of Suramangalam - Sivathapuram - Neikarapatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4505). 6,Improvements of Pension line road at km 0/0 - 0/930 including construction of Box culvert , Drain and Retaining wall(MD 655) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1305)."
TRN : 719179 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for improvements to riding quality to government roads including construction of drain, retaining wall, box culvert and up keeping the roads for a period of 60 months in salem c&m sub division (package-3) the following works are involved in this package 1.improvements of omalur main road in salem at km 0/0 - 1/2 (sh 218) including upkeeping for a period of 60 months (01-cridp-19-20-s-0340). 2,improvements of varanasi - kanyakumari road (abandoned nh7) at km 204/0 - 204/8 (sh 80) including upkeeping for a period of 60 months. (01-cridp-19-20-s-0341). 3,improvements of varanasi - kanyakumari road (abandoned nh7) at km 203/4 - 204/0 including construction of drain at km.203/4-203/10 of varanasi kanyakumari road (abandoned nh-7)(sh 80) including upkeeping for a period of 60 months (01-cridp-19-20-s-0342). 4,improvements to riding quality at km 2/0 - 3/4 and 5/6 - 6/0 of shevapet-elampillai road (md 421) including upkeeping for a period of 60 months (01-cridp-19-20-i-4468). 5,improvements to riding quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of suramangalam - sivathapuram - neikarapatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4505). 6,improvements of pension line road at km 0/0 - 0/930 including construction of box culvert , drain and retaining wall(md 655) including upkeeping for a period of 60 months (01-cridp-19-20-m-1305)."
155 CONSTRUCTION OF RETAINING WALL OF TOWER OF 220 KV SARNATH-GAJOKHAR LINE AT TOWER LOCATION NO. 25 (A+0) UNDER ELECTY. TRANSMISSION DIVISION-I, VARANASI
TRN : 825335 |  Varanasi - Uttar Pradesh
Contract Value : 29.03 Lacs | Agency Name : Uttar Pradesh Power Transmission Corporation Limited
Tender award for construction of retaining wall of tower of 220 kv sarnath-gajokhar line at tower location no. 25 (a+0) under electy. transmission division-i, varanasi
156 Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining Wall, Box Culvert and up keeping the roads for a period of 60 months in Salem C&M Sub Division (Package-3) The Following works are involved in this package 1.Improvements of Omalur Main road in Salem at km 0/0 - 1/2 (SH 218) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0340). 2,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 204/0 - 204/8 (SH 80) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0341). 3,Improvements of Varanasi - Kanyakumari Road (Abandoned NH7) at km 203/4 - 204/0 including Construction of Drain at Km.203/4-203/10 of Varanasi Kanyakumari road (Abandoned NH-7)(SH 80) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0342). 4,Improvements to Riding Quality at km 2/0 - 3/4 and 5/6 - 6/0 of Shevapet-Elampillai Road (MD 421) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4468). 5,Improvements to Riding Quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of Suramangalam - Sivathapuram - Neikarapatty road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4505). 6,Improvements of Pension line road at km 0/0 - 0/930 including construction of Box culvert , Drain and Retaining wall(MD 655) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1305)."
TRN : 720165 |  Salem - Tamil Nadu
Contract Value : 7.48 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including construction of drain, retaining wall, box culvert and up keeping the roads for a period of 60 months in salem c&m sub division (package-3) the following works are involved in this package 1.improvements of omalur main road in salem at km 0/0 - 1/2 (sh 218) including upkeeping for a period of 60 months (01-cridp-19-20-s-0340). 2,improvements of varanasi - kanyakumari road (abandoned nh7) at km 204/0 - 204/8 (sh 80) including upkeeping for a period of 60 months. (01-cridp-19-20-s-0341). 3,improvements of varanasi - kanyakumari road (abandoned nh7) at km 203/4 - 204/0 including construction of drain at km.203/4-203/10 of varanasi kanyakumari road (abandoned nh-7)(sh 80) including upkeeping for a period of 60 months (01-cridp-19-20-s-0342). 4,improvements to riding quality at km 2/0 - 3/4 and 5/6 - 6/0 of shevapet-elampillai road (md 421) including upkeeping for a period of 60 months (01-cridp-19-20-i-4468). 5,improvements to riding quality at km 0/0 - 0/8, 1/6 - 2/4, 3/6 - 5/2 and 7/8 - 8/279 of suramangalam - sivathapuram - neikarapatty road including upkeeping for a period of 60 months (01-cridp-19-20-i-4505). 6,improvements of pension line road at km 0/0 - 0/930 including construction of box culvert , drain and retaining wall(md 655) including upkeeping for a period of 60 months (01-cridp-19-20-m-1305)."
157 MAJOR OVERHAULING WORK, MEASUREMENT OF CONTRACT RESISTANCE, CLOSING/TRIPPING TIMING OF 220/132 KV SF-6 CIRCUIT BREAKERS OF CGL & SIEMENS MAKE INSTALLED AT 220 KV SUBSTATION GAJOKHAR UNDER ELECTRICITY TRANSMISSION DIVISION-I, VARANASI
158 Construction of Retainingwall ,Drain, Box culvert and Providing Centre Median to Government Roads in Salem C& M Sub Division (PACKAGE -7) The Following works are involved in this package 1.Providing of Center Median at km 202/6-203/8 of Varanasi - Kanyakumari Road (Abandoned NH7) (SH 80) (01-CRIDP-19-20-S-0352) 2.Construction of Retaining wall at km 26/4-26/500 of Thiruchengodu - Ariyanur Road (SH 86) (01-CRIDP-19-20-S-0355) 3.Construction of Retaining wall at km 26/500-26/6 & 26/10 of Thiruchengodu - Ariyanur Road (SH 86) (01-CRIDP-19-20-S-0356) 4.Construction of Retaining wall at km 26/6-26/700 of Thiruchengodu - Ariyanur Road (SH 86) (01-CRIDP-19-20-S-0357) 5.Construction of Drain at km 1/4-1/8 of Suramangalam - Omalur road (via) Muthanaickenpatty Road including Box culvert at km 1/4(MD 696). (01-CRIDP-19-20-M-1310) 6.Construction of Retaining wall at km 0/10, 1/2 & 3/6 of Keerapapampady road, (01-CRIDP-19-20-O-2591) 7.Construction of Retaining wall at km 2/2 of Ariyagoundamapatty road. (01-CRIDP-19-20-O-2592) 8.Construction of Drain at km 0/250-1/0 of Buckles road construction of Box culvert at km 0/8 (01-CRIDP-19-20-O-2593) 9.Construction of Retaining wall at km 1/2 of Salem - Ulundhurpet road to Dhadampatty road including construction of Box culverts at km 0/4, 0/6 (01-CRIDP-19-20-O-2605) 10.Construction of Retaining wall at km 2/4,3/6 & 6/4 of Mallur - Mookuthipalayam road (01-CRIDP-19-20-O-2607)
TRN : 719177 |  Salem - Tamil Nadu
Contract Value : 5.14 Crore | Agency Name : Highway Department
Tender award for construction of retainingwall ,drain, box culvert and providing centre median to government roads in salem c& m sub division (package -7) the following works are involved in this package 1.providing of center median at km 202/6-203/8 of varanasi - kanyakumari road (abandoned nh7) (sh 80) (01-cridp-19-20-s-0352) 2.construction of retaining wall at km 26/4-26/500 of thiruchengodu - ariyanur road (sh 86) (01-cridp-19-20-s-0355) 3.construction of retaining wall at km 26/500-26/6 & 26/10 of thiruchengodu - ariyanur road (sh 86) (01-cridp-19-20-s-0356) 4.construction of retaining wall at km 26/6-26/700 of thiruchengodu - ariyanur road (sh 86) (01-cridp-19-20-s-0357) 5.construction of drain at km 1/4-1/8 of suramangalam - omalur road (via) muthanaickenpatty road including box culvert at km 1/4(md 696). (01-cridp-19-20-m-1310) 6.construction of retaining wall at km 0/10, 1/2 & 3/6 of keerapapampady road, (01-cridp-19-20-o-2591) 7.construction of retaining wall at km 2/2 of ariyagoundamapatty road. (01-cridp-19-20-o-2592) 8.construction of drain at km 0/250-1/0 of buckles road construction of box culvert at km 0/8 (01-cridp-19-20-o-2593) 9.construction of retaining wall at km 1/2 of salem - ulundhurpet road to dhadampatty road including construction of box culverts at km 0/4, 0/6 (01-cridp-19-20-o-2605) 10.construction of retaining wall at km 2/4,3/6 & 6/4 of mallur - mookuthipalayam road (01-cridp-19-20-o-2607)
159 Construction of Retainingwall ,Drain, Box culvert and Providing Centre Median to Government Roads in Salem C& M Sub Division (PACKAGE -7) The Following works are involved in this package 1.Providing of Center Median at km 202/6-203/8 of Varanasi - Kanyakumari Road (Abandoned NH7) (SH 80) (01-CRIDP-19-20-S-0352) 2.Construction of Retaining wall at km 26/4-26/500 of Thiruchengodu - Ariyanur Road (SH 86) (01-CRIDP-19-20-S-0355) 3.Construction of Retaining wall at km 26/500-26/6 & 26/10 of Thiruchengodu - Ariyanur Road (SH 86) (01-CRIDP-19-20-S-0356) 4.Construction of Retaining wall at km 26/6-26/700 of Thiruchengodu - Ariyanur Road (SH 86) (01-CRIDP-19-20-S-0357) 5.Construction of Drain at km 1/4-1/8 of Suramangalam - Omalur road (via) Muthanaickenpatty Road including Box culvert at km 1/4(MD 696). (01-CRIDP-19-20-M-1310) 6.Construction of Retaining wall at km 0/10, 1/2 & 3/6 of Keerapapampady road, (01-CRIDP-19-20-O-2591) 7.Construction of Retaining wall at km 2/2 of Ariyagoundamapatty road. (01-CRIDP-19-20-O-2592) 8.Construction of Drain at km 0/250-1/0 of Buckles road construction of Box culvert at km 0/8 (01-CRIDP-19-20-O-2593) 9.Construction of Retaining wall at km 1/2 of Salem - Ulundhurpet road to Dhadampatty road including construction of Box culverts at km 0/4, 0/6 (01-CRIDP-19-20-O-2605) 10.Construction of Retaining wall at km 2/4,3/6 & 6/4 of Mallur - Mookuthipalayam road (01-CRIDP-19-20-O-2607)"
TRN : 720161 |  Salem - Tamil Nadu
Contract Value : 5.14 Crore | Agency Name : Highway Department
Tender award for construction of retainingwall ,drain, box culvert and providing centre median to government roads in salem c& m sub division (package -7) the following works are involved in this package 1.providing of center median at km 202/6-203/8 of varanasi - kanyakumari road (abandoned nh7) (sh 80) (01-cridp-19-20-s-0352) 2.construction of retaining wall at km 26/4-26/500 of thiruchengodu - ariyanur road (sh 86) (01-cridp-19-20-s-0355) 3.construction of retaining wall at km 26/500-26/6 & 26/10 of thiruchengodu - ariyanur road (sh 86) (01-cridp-19-20-s-0356) 4.construction of retaining wall at km 26/6-26/700 of thiruchengodu - ariyanur road (sh 86) (01-cridp-19-20-s-0357) 5.construction of drain at km 1/4-1/8 of suramangalam - omalur road (via) muthanaickenpatty road including box culvert at km 1/4(md 696). (01-cridp-19-20-m-1310) 6.construction of retaining wall at km 0/10, 1/2 & 3/6 of keerapapampady road, (01-cridp-19-20-o-2591) 7.construction of retaining wall at km 2/2 of ariyagoundamapatty road. (01-cridp-19-20-o-2592) 8.construction of drain at km 0/250-1/0 of buckles road construction of box culvert at km 0/8 (01-cridp-19-20-o-2593) 9.construction of retaining wall at km 1/2 of salem - ulundhurpet road to dhadampatty road including construction of box culverts at km 0/4, 0/6 (01-cridp-19-20-o-2605) 10.construction of retaining wall at km 2/4,3/6 & 6/4 of mallur - mookuthipalayam road (01-cridp-19-20-o-2607)"
160 Widening from Four lane to Six lane and Strengthening of Varanasi – Kanyakumari Road (Abandoned NH7) Namakkal Urban at km 249/150 – 251/6 and including CD works and Strom water drain (SH121) including upkeeping for a period of 60 months.