You have searched for -tamil-nadu in Awarded Tender Result. Click on any tender to view further details.

2991 Widening, Strengthening, Improvements to Riding quality, Culvert & Parapet including upkeeping works in Kallakurichi (H) C&M Subdivision Jurisdiction (Package 45) A- Widening from Single lane to Intermediate lane and Strengthening of Siruvangur Road at km 0/0 - 2/0 including reconstruction of culvert at km.1/6 including upkeeping for a period of 60 months B- Improvements to Riding Quality at km 11/6 - 13/8 of Kallakurichi Sankarapuram Road Via Kachirapalayam (MD 135) including upkeeping for a period of 60 months. C- Strengthening of Chinnasalem Kachirapalayam Road at km 3/2 - 4/0 (MD 1013) including upkeeping for a period of 60 months. D- Strengthening of Chinnasalem Kachirapalayam Road at km 4/0 - 5/0 (MD 1013) including upkeeping for a period of 60 months. E- Strengthening of Chinnasalem Kachirapalayam Road at km 5/0 - 6/2 (MD 1013) including upkeeping for a period of 60 months. F- Improvements to Riding Quality at km 0/8 - 4/0 of Chinnasalem Periyasiruvathur Road including upkeeping for a period of 60 months. G- Reconstruction of Retaining wall at km 8/0-18/0 of Kachirapalayam - Vellimalai road (MD-810) H- Reconstruction of Retaining wall at km 2/0-28/6 of Vellimalai - Moolakadu - Pudhur road (MD-809) I- Reconstruction of Box culvert at km 0/8 of Chinnasalem - Periyasiruvathur road including upkeeping for a period of 60 months."
2992 Widening, Strengthening, Improvements of Riding quality, Culvert & Retaining wall including upkeeping works for 60 Months in Villupuram and Vanur (H) C&M Subdivision Jurisdiction (Package 27) A-Widening from Two lane to Three lane and Strengthening of Mundiyampakkam-- Pondicherry road at km 5/2 - 6/2 (SH203) including upkeeping for a period of 60 months B-Reconstruction of RCC slab culvert at km 3/2 of Vikkravandy-Veedur road in lieu of existing damaged Rcc slab culvert. Including upkeeping for a period of 60 months C-Improvements to Riding Quality at km 2/0 - 4/0 of Sathanur-Asur - Melakkondai road including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 1/0 - 2/450 and 2/650 - 2/8 of Ennaiyiram-Pidaripattu road including upkeeping for a period of 60 months E-Improvements to Riding Quality at km 0/0 - 2/850 Villupuram- Mambalapattu-Tirukoilur road to Villupuram-Tiruvannamalai road (via) Malligaipattu-Kozhipattu road including upkeeping for a period of 60 months F-Providing Retaining wall at km 1/6 of Perumpakkam road (along tank bund portion) G-Providing Retaining wall at km 1/8 of Perumpakkam road (along tank bund portion)"
2993 Widening, Strengthening, Improvements of Riding quality, Culvert & Retaining wall including upkeeping works for 60 Months in Villupuram and Vanur (H) C&M Subdivision Jurisdiction (Package 27) A-Widening from Two lane to Three lane and Strengthening of Mundiyampakkam-- Pondicherry road at km 5/2 - 6/2 (SH203) including upkeeping for a period of 60 months B-Reconstruction of RCC slab culvert at km 3/2 of Vikkravandy-Veedur road in lieu of existing damaged Rcc slab culvert. Including upkeeping for a period of 60 months C-Improvements to Riding Quality at km 2/0 - 4/0 of Sathanur-Asur - Melakkondai road including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 1/0 - 2/450 and 2/650 - 2/8 of Ennaiyiram-Pidaripattu road including upkeeping for a period of 60 months E-Improvements to Riding Quality at km 0/0 - 2/850 Villupuram- Mambalapattu-Tirukoilur road to Villupuram-Tiruvannamalai road (via) Malligaipattu-Kozhipattu road including upkeeping for a period of 60 months F-Providing Retaining wall at km 1/6 of Perumpakkam road (along tank bund portion) G-Providing Retaining wall at km 1/8 of Perumpakkam road (along tank bund portion)
2994 Widening, Improvements, Improvements to Riding quality, Culvert, Retaining wall including upkeeping works in Ulundurpet (H) C&M Subdivision Jurisdiction (Package 51) A-Widening from Intermediate lane to Two lane and Improvements of M. Kunnathur Naripalayam road at km 0/0 - 1/700 (MD620) including upkeeping for a period of 60 months B-Widening from Intermediate lane to Two lane and Improvements of M. Kunnathur Naripalayam road at km 1/700 - 3/100 including Reconstruction of narrow culvert in Km.2/6 and construction of Retaining wall in Km.1/10 (MD620) including upkeeping for a period of 60 months C-Improvements to Riding Quality at km 15/4 - 15/8, 17/8 - 18/4 and 19/2 - 20/300 of M. Kunnathur Naripalayam road (MD620) including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 7/900 - 8/650, 9/700 - 10/0 and 18/4 - 19/4 of Rishivandhiyam Nemili Road via Eraiyur Palayam (MD672) including upkeeping for a period of 60 months E-Reconstruction RCC slab culvert across Local odai at km 11/4 of Parikkal Periyasevalai road (MD336) including upkeeping for a period of 60 months F-Reconstruction RCC slab culvert across Local odai at km 3/6 of Parikkal Periyasevalai road (MD336) including upkeeping for a period of 60 months"
2995 Widening, Improvements, Improvements to Riding quality, Culvert, Retaining wall including upkeeping works in Ulundurpet (H) C&M Subdivision Jurisdiction (Package 51) A-Widening from Intermediate lane to Two lane and Improvements of M. Kunnathur Naripalayam road at km 0/0 - 1/700 (MD620) including upkeeping for a period of 60 months B-Widening from Intermediate lane to Two lane and Improvements of M. Kunnathur Naripalayam road at km 1/700 - 3/100 including Reconstruction of narrow culvert in Km.2/6 and construction of Retaining wall in Km.1/10 (MD620) including upkeeping for a period of 60 months C-Improvements to Riding Quality at km 15/4 - 15/8, 17/8 - 18/4 and 19/2 - 20/300 of M. Kunnathur Naripalayam road (MD620) including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 7/900 - 8/650, 9/700 - 10/0 and 18/4 - 19/4 of Rishivandhiyam Nemili Road via Eraiyur Palayam (MD672) including upkeeping for a period of 60 months E-Reconstruction RCC slab culvert across Local odai at km 11/4 of Parikkal Periyasevalai road (MD336) including upkeeping for a period of 60 months F-Reconstruction RCC slab culvert across Local odai at km 3/6 of Parikkal Periyasevalai road (MD336) including upkeeping for a period of 60 months"
2996 Curve Improvements, Improvements to Riding quality, Providing Paver block, Culvert & Drain including upkeeping works in Sankarapuram (H) C&M Subdivision Jurisdiction (Package 43) A-Improvements to Riding Quality at km 0/0 - 1/4 of Seerpanandhal Road including upkeeping for a period of 60 months B-Improvements to Riding Quality at km 87/100 - 88/0 of Cuddalore - Tirukoilur - Sankarapuram Road (SH68) including upkeeping for a period of 60 months C-Construction of Drain at km 54/2-54/8 of Vellimalai Moolakadu Pudhur road (MD809) including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 0/0 - 1/8 of Devapandalam Rangappanur Road including upkeeping for a period of 60 months E-Improvements to Riding Quality at km 2/0 - 6/450 of Devapandalam Viriyur Road including upkeeping for a period of 60 months F-Widening the curve at km 23/2 of Kallakurichi Sankarapuram Road Via Kachirapalayam including Construction of road side well protective wall (MD135) including upkeeping for a period of 60 months G-Improvements of Marur Endhal Road at km 2/0 - 4/0 including Reconstruction of culverts at Km.3/10 (i) & (ii) (2 nos) (using plastic waste) including upkeeping for a period of 60 months H-Improvements to Riding Quality at km 0/0 - 4/0 of Sirupanaiyur Thakka Road including upkeeping for a period of 60 months I-Improvements to Riding Quality at km 0/0 - 1/0 and 2/0 - 4/0 of Munivazhai Pasar Road including upkeeping for a period of 60 months J-Reconstruction of Pipe Culvert at km 0/4 of Eraiyur Rishivandhiyam Road to Kunniyur Road (Via) Andhiyur including upkeeping for a period of 60 months"
TRN : 676747 |  Villupuram - Tamil Nadu
Contract Value : 5.18 Crore | Agency Name : Highway Department
Tender award for curve improvements, improvements to riding quality, providing paver block, culvert & drain including upkeeping works in sankarapuram (h) c&m subdivision jurisdiction (package 43) a-improvements to riding quality at km 0/0 - 1/4 of seerpanandhal road including upkeeping for a period of 60 months b-improvements to riding quality at km 87/100 - 88/0 of cuddalore - tirukoilur - sankarapuram road (sh68) including upkeeping for a period of 60 months c-construction of drain at km 54/2-54/8 of vellimalai moolakadu pudhur road (md809) including upkeeping for a period of 60 months d-improvements to riding quality at km 0/0 - 1/8 of devapandalam rangappanur road including upkeeping for a period of 60 months e-improvements to riding quality at km 2/0 - 6/450 of devapandalam viriyur road including upkeeping for a period of 60 months f-widening the curve at km 23/2 of kallakurichi sankarapuram road via kachirapalayam including construction of road side well protective wall (md135) including upkeeping for a period of 60 months g-improvements of marur endhal road at km 2/0 - 4/0 including reconstruction of culverts at km.3/10 (i) & (ii) (2 nos) (using plastic waste) including upkeeping for a period of 60 months h-improvements to riding quality at km 0/0 - 4/0 of sirupanaiyur thakka road including upkeeping for a period of 60 months i-improvements to riding quality at km 0/0 - 1/0 and 2/0 - 4/0 of munivazhai pasar road including upkeeping for a period of 60 months j-reconstruction of pipe culvert at km 0/4 of eraiyur rishivandhiyam road to kunniyur road (via) andhiyur including upkeeping for a period of 60 months"
2997 Curve Improvements, Improvements to Riding quality, Providing Paver block, Culvert & Drain including upkeeping works in Sankarapuram (H) C&M Subdivision Jurisdiction (Package 43) A-Improvements to Riding Quality at km 0/0 - 1/4 of Seerpanandhal Road including upkeeping for a period of 60 months B-Improvements to Riding Quality at km 87/100 - 88/0 of Cuddalore - Tirukoilur - Sankarapuram Road (SH68) including upkeeping for a period of 60 months C-Construction of Drain at km 54/2-54/8 of Vellimalai Moolakadu Pudhur road (MD809) including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 0/0 - 1/8 of Devapandalam Rangappanur Road including upkeeping for a period of 60 months E-Improvements to Riding Quality at km 2/0 - 6/450 of Devapandalam Viriyur Road including upkeeping for a period of 60 months F-Widening the curve at km 23/2 of Kallakurichi Sankarapuram Road Via Kachirapalayam including Construction of road side well protective wall (MD135) including upkeeping for a period of 60 months G-Improvements of Marur Endhal Road at km 2/0 - 4/0 including Reconstruction of culverts at Km.3/10 (i) & (ii) (2 nos) (using plastic waste) including upkeeping for a period of 60 months H-Improvements to Riding Quality at km 0/0 - 4/0 of Sirupanaiyur Thakka Road including upkeeping for a period of 60 months I-Improvements to Riding Quality at km 0/0 - 1/0 and 2/0 - 4/0 of Munivazhai Pasar Road including upkeeping for a period of 60 months J-Reconstruction of Pipe Culvert at km 0/4 of Eraiyur Rishivandhiyam Road to Kunniyur Road (Via) Andhiyur including upkeeping for a period of 60 months"
TRN : 704932 |  Villupuram - Tamil Nadu
Contract Value : 5.18 Crore | Agency Name : Highway Department
Tender award for curve improvements, improvements to riding quality, providing paver block, culvert & drain including upkeeping works in sankarapuram (h) c&m subdivision jurisdiction (package 43) a-improvements to riding quality at km 0/0 - 1/4 of seerpanandhal road including upkeeping for a period of 60 months b-improvements to riding quality at km 87/100 - 88/0 of cuddalore - tirukoilur - sankarapuram road (sh68) including upkeeping for a period of 60 months c-construction of drain at km 54/2-54/8 of vellimalai moolakadu pudhur road (md809) including upkeeping for a period of 60 months d-improvements to riding quality at km 0/0 - 1/8 of devapandalam rangappanur road including upkeeping for a period of 60 months e-improvements to riding quality at km 2/0 - 6/450 of devapandalam viriyur road including upkeeping for a period of 60 months f-widening the curve at km 23/2 of kallakurichi sankarapuram road via kachirapalayam including construction of road side well protective wall (md135) including upkeeping for a period of 60 months g-improvements of marur endhal road at km 2/0 - 4/0 including reconstruction of culverts at km.3/10 (i) & (ii) (2 nos) (using plastic waste) including upkeeping for a period of 60 months h-improvements to riding quality at km 0/0 - 4/0 of sirupanaiyur thakka road including upkeeping for a period of 60 months i-improvements to riding quality at km 0/0 - 1/0 and 2/0 - 4/0 of munivazhai pasar road including upkeeping for a period of 60 months j-reconstruction of pipe culvert at km 0/4 of eraiyur rishivandhiyam road to kunniyur road (via) andhiyur including upkeeping for a period of 60 months"
2998 Widening, Strengthening, Improvements to Riding quality, Culvert & Protective wall including upkeeping works in Sankarapuram (H) C&M Subdivision Jurisdiction (Package 42) A-Widening from Intermediate lane to Two lane and Strengthening of Thiyagadurgam Adari Road at km 2/0 - 4/0 including Reconstruction of narrow culvert at Km 2/6 (MD811) including upkeeping for a period of 60 months B-Widening from Intermediate lane to Two lane and Strengthening of Thiyagadurgam Adari Road at km 4/0 - 6/0 (MD811) including upkeeping for a period of 60 months C-Improvements to Riding Quality at km 0/0 - 1/6 of Keelpadi Aviriyur Road including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 0/0 - 2/0 and 3/4 - 4/8 of Periyapagandai Yal Road including upkeeping for a period of 60 months E-Construction of Retaining wall at km 1/8 of Tholuvandhangal Pakkam Road"
2999 Widening, Strengthening, Improvements to Riding quality, Culvert & Protective wall including upkeeping works in Sankarapuram (H) C&M Subdivision Jurisdiction (Package 42) A-Widening from Intermediate lane to Two lane and Strengthening of Thiyagadurgam Adari Road at km 2/0 - 4/0 including Reconstruction of narrow culvert at Km 2/6 (MD811) including upkeeping for a period of 60 months B-Widening from Intermediate lane to Two lane and Strengthening of Thiyagadurgam Adari Road at km 4/0 - 6/0 (MD811) including upkeeping for a period of 60 months C-Improvements to Riding Quality at km 0/0 - 1/6 of Keelpadi Aviriyur Road including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 0/0 - 2/0 and 3/4 - 4/8 of Periyapagandai Yal Road including upkeeping for a period of 60 months E-Construction of Retaining wall at km 1/8 of Tholuvandhangal Pakkam Road"
3000 Strengthening, Improvements, Improvements of Riding quality, construction of Culvert including upkeeping works for 60 Months in Tindivanam (H) C&M Subdivision Jurisdiction (Package 32) A- Strengthening of Vallam-G.S.T Road km 6/4 - 9/8 including Reconstruction of pipe culvert at Km 9/6, 9/8 (MD1113) B- Improvements of Kodiyam - Ammanampakkam Road km 0/0-2/0, including Reconstruction of pipe culvert at km 0/2 , 0/4 C- Improvements of Kodiyam - Ammanampakkam Road km 2/0-4/4, including Reconstruction of pipe culvert at km 3/2. D- Improvements of Pallikulam Road At Km 5/0 - 6/5 E- Improvements to Riding Quality at Km 2/0-3/8 of Senganikuppam Road F- Improvements to riding quality at Km.0/0-0/416 & 0/816-2/0 of Ganapathipattu - Reddikuppam Road G- Improvements to Riding Quality at Km.0/0-3/0 of Vizhukkam Puliyanur road H- Improvements to Riding Quality at Km 0/0-1/0 of Veedur Anaicut road "

Get Tamil Nadu Awarded Tender Alert...

033032

Advertisment
Advertisment