You have searched for -tamil-nadu in Awarded Tender Result. Click on any tender to view further details.

3301 PACKAGE–37, Widening, Strengthening, Improvements, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Pattukkottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2425-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 4/0-6/0 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2426-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 6/0-7/0 including construction of Retaining wall at Km 6/2,6/4 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-O-2397-,Widening from Single lane to Intermediate lane and Strengthening of Nattusalai-Thuvaranguruchi road at km 0/0-2/0 including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-O-2440-, Improvements of Vadiyakkadu-Kalyanaodai road at km 4/0-7/4 including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-O-2441-, Improvements of Kumbakonam - Mannarkudy - Adirampattinam road KM 50/4 to Thirumakkottai road at km0/0 -2/0 including upkeeping for a period of 60 months "
3302 Special Repairs to Government Roads in Sendamangalam (H) C&M Sub Division (Package 88) The Following works are involved in this package 1. Special Repairs to Km 26/0-27/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road 2. Special Repairs to Km 234/845 - 236/135 of VCC Road 3. Special Repairs to Km 6/585 - 7/250 of Namagiripettai - Ariyagoundampatti - Kalkurichipirivu road 4. Special Repairs to Km 8/0 - 9/0 of Velegoundampatty - Elur - Puduchatiram road 5. Special Repairs to Km 9/4 - 10/4 and 11/4 - 12/0 of Velegoundampatty - Elur -Puduchatiram road 6.Special Repairs to Km 0/0 - 1/8 of Kulivalavu - Othakadai road
3303 Widening, Improvements and Improvements to Riding Quality to Government Roads including Dip Raising, Construction of Retaining wall, Widening of Slab Culvert and Upkeeping for a period of 60 months in Rasipuram (H) C&M Sub Division (Package-45) The Following works are involved in this package 1) Widening from Two lane to Three lane and Improvements of Rasipuram - Attur road at km 1/0 - 2/0 including widening slab culvert at Km 1/4 and Construction of Retaining Wall (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1328) 2) Improvements of Attaiyampatti - Masakkalipatti road at km 6/6 - 9/2 including dip raising at Km 6/10, 7/2, 7/4, 7/6 (MD46) and including upkeeping for a period of 60 months (01-CRIDP-19-20-M-1332) 3) Construction of Retaining wall at km 2/2 of Rasipuram - Attur road (MD402) (01-CRIDP-19-20-M-1356) 4) Improvements to Riding Quality at km 48/500 - 50/0 of Mohanur - Namakkal - Sendamangalam - Rasipuram road (SH95) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4554) 5) Improvements to Riding Quality at km 2/8 - 5/4 of Rasipuram Byepass road (MD) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4562) 6) Improvements to Riding Quality at km 2/0 - 3/0 of Rasipuram - Attur road (MD402) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4563)"
3304 Improvements, Construction of drain including footpath in Chennai City Roads (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at km 3/2 - 3/8 (LS&RS) & service road at km 3/8 - 4/2 of GNT Road (SHU87) (01-CRIDP-19-20-I-3778) B) Construction of Drain at km 8/0 - 8/3 (RS) of GST Road including footpath (01-CRIDP-19-20-S-0042) C) Construction of Drain at km 8/6 -8/9 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0065) D) Construction of Drain at km 8/3 -8/6 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0066) E) Construction of Protective wall & Providing paver block to the Vyasarapadi under pass at Km.4/4 of GNT Road (SHU87) (01-CRIDP-19-20-S-0049)"
3305 Improvements, Construction of drain including footpath in Chennai City Roads (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at km 3/2 - 3/8 (LS&RS) & service road at km 3/8 - 4/2 of GNT Road (SHU87) (01-CRIDP-19-20-I-3778) B) Construction of Drain at km 8/0 - 8/3 (RS) of GST Road including footpath (01-CRIDP-19-20-S-0042) C) Construction of Drain at km 8/6 -8/9 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0065) D) Construction of Drain at km 8/3 -8/6 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0066) E) Construction of Protective wall & Providing paver block to the Vyasarapadi under pass at Km.4/4 of GNT Road (SHU87) (01-CRIDP-19-20-S-0049)"
3306 Improvements to Government Roads, including Construction of Drain and up keeping for a period of 60 months in Tiruchengode (H) C&M Sub Division (Package-49) The Following works are involved in this package 1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 0/0-1/2 (SH 22) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0418) 2. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 1/2-2/4 (SH 22) including upkeeping for a period of 60 months. (01-CRIDP-19-20-S-0419) 3. Construction of Drain at km 12/750-13/5 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0441) 4. Construction of Drain at km 13/5-14/250 (L/S & R/S) of Sankari- Pallipalayam Road (SH 79A) (01-CRIDP-19-20-S-0442)
3307 Widening, Strengthening, Improvements and Improvements to Riding Quality to Government Roads including CC Pavements, Reconstruction of Box culvert and Construction of Retaining wall and Upkeeping for a period of 60 months in Senthamangalam (H) C&M Sub Division (Package-43) The Following works are involved in this package 1. Improvements of Namakkal - Kananur road at km 6/0 - 7/0 (SH 161) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0424) 2. Improvements of Kolli Hills ghat road at km 17/0 - 19/0 including cc pavements and construction of parapet in km 16/0-19/0(MD 181) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1334) 3. Improvements to Riding Quality at km 2/0 - 3/0 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4584) 4. Construction of Retaining wall at km 2/2 of Km 9/6 of Namakkal-Thuraiyur road to Km 2/4 of Thoosur-Valayapatti road (via) Palapatti. (01-CRIDP-19-20-0-2685) 5. Reconstruction of Box culvert at km 2/2 of Pudanchanthai - Sendamangalam road to Sengaligoun danur road. including construction of retaining wall. (01-CRIDP-19-20-O-2652) 6. Strengthening of Pottireddipatti to Kollimalai Bottom (via) Kajakombai elemendary school road at km 0/0 - 3/4 including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2650) 7. Construction of Retaining wall at km 0/4-1/2 of Ramanatha puram pudur road. (01-CRIDP-19-20-O-2687) 8. Widening from Single lane to Intermediate lane and Improvements of Muthugapatti road at km 0/700 - 1/300, Improvements at km 0/0 - 0/700 including upkeeping for a period of 60 months. (01-CRIDP-19-20-0-2646) 9. Construction of Drain at km 2/8 - 5/450 of Periyakovilur - Vellarikadu road (via) Asakkadu. (01-CRIDP-19-20-P-3679)"
TRN : 718803 |  Salem - Tamil Nadu
Contract Value : 6.83 Crore | Agency Name : Highway Department
Tender award for widening, strengthening, improvements and improvements to riding quality to government roads including cc pavements, reconstruction of box culvert and construction of retaining wall and upkeeping for a period of 60 months in senthamangalam (h) c&m sub division (package-43) the following works are involved in this package 1. improvements of namakkal - kananur road at km 6/0 - 7/0 (sh 161) including upkeeping for a period of 60 months (01-cridp-19-20-s-0424) 2. improvements of kolli hills ghat road at km 17/0 - 19/0 including cc pavements and construction of parapet in km 16/0-19/0(md 181) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1334) 3. improvements to riding quality at km 2/0 - 3/0 of pudanchanthai - sendamangalam road to sengaligoun danur road. including upkeeping for a period of 60 months. (01-cridp-19-20-i-4584) 4. construction of retaining wall at km 2/2 of km 9/6 of namakkal-thuraiyur road to km 2/4 of thoosur-valayapatti road (via) palapatti. (01-cridp-19-20-0-2685) 5. reconstruction of box culvert at km 2/2 of pudanchanthai - sendamangalam road to sengaligoun danur road. including construction of retaining wall. (01-cridp-19-20-o-2652) 6. strengthening of pottireddipatti to kollimalai bottom (via) kajakombai elemendary school road at km 0/0 - 3/4 including upkeeping for a period of 60 months. (01-cridp-19-20-o-2650) 7. construction of retaining wall at km 0/4-1/2 of ramanatha puram pudur road. (01-cridp-19-20-o-2687) 8. widening from single lane to intermediate lane and improvements of muthugapatti road at km 0/700 - 1/300, improvements at km 0/0 - 0/700 including upkeeping for a period of 60 months. (01-cridp-19-20-0-2646) 9. construction of drain at km 2/8 - 5/450 of periyakovilur - vellarikadu road (via) asakkadu. (01-cridp-19-20-p-3679)"
3308 Widening, Improvements, Improvements to Riding Quality, Reconstruction of Slab Culvert, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Peravurani & Pattukottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2431, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 0/8, Retaining wall at km 0/6 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2432, Improvements of Kattaiankadu - Ukkadai - Kollukkadu road at km 6/0 - 7/6 Widening from 3.00m lane to 3.75m lane, including reconstruction of slab Culvert 6/6, Retaining wall at km 6/6 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-I-4398, Improvements to Riding Quality at km 4/4 - 6/6 of Palayam - Palamunthi road including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-I-4400, Improvements to Riding Quality at km 0/0 - 1/8 of Vettikkadu - Santhankadu road including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-I-4401, Improvements to Riding Quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of Muthupettai - Mimisal Road including upkeeping for a period of 60 months Road F, 01-CRIDP-19-20-O-2448, Reconstruction of RCC slab culvert across CMP canal at km 1/6 of Kalagam - Karambakkadu road including upkeeping for a period of 60 months Road G, 01-CRIDP-19-20-O-2449, Reconstruction of RCC slab culvert across CMP canal at km 12/2 of Kattaiankadu - Ukkadai - Kollukkadu road including upkeeping for a period of 60 months Road H, 01-CRIDP-19-20-O-2489-, Construction of Retaining wall at km 2/8 of Peravurani - Marungappallam road "
TRN : 704962 |  Trichy - Tamil Nadu
Contract Value : 5.52 Crore | Agency Name : Highway Department
Tender award for widening, improvements, improvements to riding quality, reconstruction of slab culvert, construction of retaining wall including up keeping for a period of 60 months in govt. roads in respect of peravurani & pattukottai (h), c&m subdivision. road a, 01-cridp-19-20-o-2431, improvements of kattaiankadu - ukkadai - kollukkadu road at km 0/0 - 0/8 and 5/0 - 6/0 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 0/8, retaining wall at km 0/6 including upkeeping for a period of 60 months road b, 01-cridp-19-20-o-2432, improvements of kattaiankadu - ukkadai - kollukkadu road at km 6/0 - 7/6 widening from 3.00m lane to 3.75m lane, including reconstruction of slab culvert 6/6, retaining wall at km 6/6 including upkeeping for a period of 60 months road c, 01-cridp-19-20-i-4398, improvements to riding quality at km 4/4 - 6/6 of palayam - palamunthi road including upkeeping for a period of 60 months road d, 01-cridp-19-20-i-4400, improvements to riding quality at km 0/0 - 1/8 of vettikkadu - santhankadu road including upkeeping for a period of 60 months road e, 01-cridp-19-20-i-4401, improvements to riding quality at km 5/096 - 5/470, 5/870 - 6/468, 7/268 - 7/489 and 14/555 - 14/862 of muthupettai - mimisal road including upkeeping for a period of 60 months road f, 01-cridp-19-20-o-2448, reconstruction of rcc slab culvert across cmp canal at km 1/6 of kalagam - karambakkadu road including upkeeping for a period of 60 months road g, 01-cridp-19-20-o-2449, reconstruction of rcc slab culvert across cmp canal at km 12/2 of kattaiankadu - ukkadai - kollukkadu road including upkeeping for a period of 60 months road h, 01-cridp-19-20-o-2489-, construction of retaining wall at km 2/8 of peravurani - marungappallam road "
3309 Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939) B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934) C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
3310 Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 87) The Following works are involved in this package 1. Special Repairs to Km 63/4-65/2 & 70/0-71/2 of Trichy Namakkal Road 2.Special Repairs to Km 4/0-5/0 of Namakkal Thindamangalam Keerambur Road. 3. Special Repairs to Km 0/0-1/4 of Serukkalai Cross Road to Vaiyarampalayam Road 4. Special Repairs to Km 6/0-6/6 of Pulagoundampatti-Serukkalai Road "

Get Tamil Nadu Awarded Tender Alert...

217755

Advertisment
Advertisment