You have searched for -tamil-nadu in Awarded Tender Result. Click on any tender to view further details.

3301 Improvements, Construction of drain including footpath in Chennai City Roads (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at km 3/2 - 3/8 (LS&RS) & service road at km 3/8 - 4/2 of GNT Road (SHU87) (01-CRIDP-19-20-I-3778) B) Construction of Drain at km 8/0 - 8/3 (RS) of GST Road including footpath (01-CRIDP-19-20-S-0042) C) Construction of Drain at km 8/6 -8/9 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0065) D) Construction of Drain at km 8/3 -8/6 of GST Road including footpath (SHU88) (01-CRIDP-19-20-S-0066) E) Construction of Protective wall & Providing paver block to the Vyasarapadi under pass at Km.4/4 of GNT Road (SHU87) (01-CRIDP-19-20-S-0049)"
3302 Widening, Strengthening, Improvements, Construction of Retaining wall including up keeping for a period of 60 months in Govt. Roads in respect of Pattukkottai (H), C&M Subdivision. Road A, 01-CRIDP-19-20-O-2425-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 4/0-6/0 including upkeeping for a period of 60 months Road B, 01-CRIDP-19-20-O-2426-, Widening from Single lane to Intermediate lane and Improvements of Nattusalai-Thuvaranguruchi road at km 6/0-7/0 including construction of Retaining wall at Km 6/2,6/4 including upkeeping for a period of 60 months Road C, 01-CRIDP-19-20-O-2397-,Widening from Single lane to Intermediate lane and Strengthening of Nattusalai-Thuvaranguruchi road at km 0/0-2/0 including upkeeping for a period of 60 months Road D, 01-CRIDP-19-20-O-2440-, Improvements of Vadiyakkadu-Kalyanaodai road at km 4/0-7/4 including upkeeping for a period of 60 months Road E, 01-CRIDP-19-20-O-2441-, Improvements of Kumbakonam - Mannarkudy - Adirampattinam road KM 50/4 to Thirumakkottai road at km0/0 -2/0 including upkeeping for a period of 60 months "
3303 Widening, Improvements and Improvements to Riding Quality to Government Roads including Reconstruction of Culverts, Construction of Storm Water Drain, Retaining wall and providing Paver Blocks and Up keeping for a period of 60 months in Mettur (H) C&M Sub Division (Package-36) The Following works are involved in this package 1) Improvements of Tholasampatty - Mallappanur road at Km.10/2-13/0 including Curve Widening at Km.12/2 and Construction of Retaining Wall at Km.11/2, 11/6 & 12/4 (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1320 2) Improvements to Riding Quality at Km.13/0-15/8 of Tholasampatty - Mallappanur road (MD1174A) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4534 3) Improvements to Riding Quality at Km.0/2-1/8 and 2/6-5/0 of Gonur - Mallikundam road (using Plastic Waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4538 4) Widening from Single lane to Two lane and Improvements of Approach road to Travellers Bungalow at Mettur at Km.0/150-0/300 including Storm water Drain and Providing Paver Block including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2616 5) Improvements of Kolathur - Alamarthupatty road (via) Kurumbanur at Km.3/4-4/6 and 6/0-7/4 including Dip Raising at Km.5/10 & 6/2, Construction of Retaining Wall Km.5/10, 6/2 & 7/4 and Reconstruction of Box Culvert at Km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-CRDIP-19-20-P-3669 6) Improvements of Kolathur - Thinnapatty road at Km.5/4-7/0 including upkeeping for a period of 60 months 01-CRDIP-19-20-O-2627"
TRN : 719200 |  Salem - Tamil Nadu
Contract Value : 6.04 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including reconstruction of culverts, construction of storm water drain, retaining wall and providing paver blocks and up keeping for a period of 60 months in mettur (h) c&m sub division (package-36) the following works are involved in this package 1) improvements of tholasampatty - mallappanur road at km.10/2-13/0 including curve widening at km.12/2 and construction of retaining wall at km.11/2, 11/6 & 12/4 (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-m-1320 2) improvements to riding quality at km.13/0-15/8 of tholasampatty - mallappanur road (md1174a) including upkeeping for a period of 60 months 01-cridp-19-20-i-4534 3) improvements to riding quality at km.0/2-1/8 and 2/6-5/0 of gonur - mallikundam road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4538 4) widening from single lane to two lane and improvements of approach road to travellers bungalow at mettur at km.0/150-0/300 including storm water drain and providing paver block including upkeeping for a period of 60 months 01-cridp-19-20-o-2616 5) improvements of kolathur - alamarthupatty road (via) kurumbanur at km.3/4-4/6 and 6/0-7/4 including dip raising at km.5/10 & 6/2, construction of retaining wall km.5/10, 6/2 & 7/4 and reconstruction of box culvert at km.5/10, 6/2 & 6/4 including upkeeping for a period of 60 months 01-crdip-19-20-p-3669 6) improvements of kolathur - thinnapatty road at km.5/4-7/0 including upkeeping for a period of 60 months 01-crdip-19-20-o-2627"
3304 Widening, Improvements and Improvements to Riding Quality to Government Roads including Construction of Drain, Retaining wall and widening of Pipe Culverts and Up keeping for a period of 60 months in Sankari (H) C&M Sub Division (Package-27) The Following works are involved in this package 1.Construction Drain at km 6/8 - 7/2 of Magudanchavadi - Komarapalayam road (via) Edappady (SH 221) 01-CRIDP-19-20-S-0407 2.Improvements to Riding Quality at Km 2/2 - 4/0 of Kakapalayam - Attayampatty Road (MD133) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4533 3.Improvements to Riding Quality at Km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of Kakapalayam -Chinnappampatty road (MD-134) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4536 4.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 0/0 - 2/0 including Construction of Retaining wall at km 0/10 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2618 5.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 2/0 - 4/0 Including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2619 6.Widening from Single lane to Intermediate lane and Improvements of Siddarkovil - Mattaiyampatty Road at km 4/0 - 6/4 Including widening of pipe culverts at km 4/8 & 5/10 and Construction of Retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2620 7.Improvements to Riding Quality at km 4/6 - 6/6 of Katchupalli - Alagappampalayam - Elampillai road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4544 8.Construction of Retaining wall at Km 2/4 of Elampillai - Kadayampatti Road 01-CRIDP-19-20-O-2633"
TRN : 720187 |  Salem - Tamil Nadu
Contract Value : 6.42 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including construction of drain, retaining wall and widening of pipe culverts and up keeping for a period of 60 months in sankari (h) c&m sub division (package-27) the following works are involved in this package 1.construction drain at km 6/8 - 7/2 of magudanchavadi - komarapalayam road (via) edappady (sh 221) 01-cridp-19-20-s-0407 2.improvements to riding quality at km 2/2 - 4/0 of kakapalayam - attayampatty road (md133) including upkeeping for a period of 60 months 01-cridp-19-20-i-4533 3.improvements to riding quality at km.5/6 - 6/0, 6/2 - 7/0 and 8/0-9/6 of kakapalayam -chinnappampatty road (md-134) including upkeeping for a period of 60 months 01-cridp-19-20-i-4536 4.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 0/0 - 2/0 including construction of retaining wall at km 0/10 including upkeeping for a period of 60 months 01-cridp-19-20-o-2618 5.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 2/0 - 4/0 including widening of pipe culvert at km 2/8 including upkeeping for a period of 60 months 01-cridp-19-20-o-2619 6.widening from single lane to intermediate lane and improvements of siddarkovil - mattaiyampatty road at km 4/0 - 6/4 including widening of pipe culverts at km 4/8 & 5/10 and construction of retaining wall at km 4/8, 4/10 & 5/4 including upkeeping for a period of 60 months 01-cridp-19-20-o-2620 7.improvements to riding quality at km 4/6 - 6/6 of katchupalli - alagappampalayam - elampillai road including upkeeping for a period of 60 months 01-cridp-19-20-i-4544 8.construction of retaining wall at km 2/4 of elampillai - kadayampatti road 01-cridp-19-20-o-2633"
3305 Widening, Improvements, Curve Widening, Constructuion of Minor Bridge, Drain, Footpath, Junction Improvement works including Upkeeping for a period of 60 months in Chennai City Roads & Tambaram (H) C&M Sub Division Jurisdiction A)Construction Minor Bridge at Km 1 / 8 of Pallavaram -- Thiruneermalai -- Thirumudivakkam Road (MD 1163) ( 01 -- CRIDP -- 19 -- 20 -- O -- 0939) B) Widening from Two lane to Four lane and Improvements of Tambaram - Somangalam - Nandambakkam Road at km 0/6 - 0/900 including Construction of Drain Cum Footpath (MD1164) including upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- M -- 0934) C) Improvements of Curve at Km 4 / 8 -- 5 / 2 Tambaram - Mudichur - Sriperumbudur Road (SH110) including Widening, junction Improvements and upkeeping for a period of 60 months ( 01 -- CRIDP -- 19 -- 20 -- S -- 0004)"
3306 Improvements and Improvements to Riding Quality to Government Roads including Construction of Box Culvert, Retaining wall, Drain and Providing Centere Medain and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package52) The Following works are involved in this package 1. Improvements of Komarapalayam-Bhavani Road (Abonded NH 47) at km 2/4-3/460 (SH22) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0420) 2. Construction of Box culvert at km 22/10 of Tiruchengode- Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1338) 3. Improvements to Riding Quality at km 33/0-34/700 of Komarapalayam-Pallipalayam-Jedarpalayam-Pandamangalam-Velur Road (SH 198). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4560) 4. Providing Center median at km 52/6-53/0 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0431) 5. Improvements to Riding Quality at km 77/4-77/8 of Malliakarai-Rasipuram-Tiruchengode-Erode Road (SH 79). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4558) 6. Improvements to Riding Quality at Km 4/2-6/965 of Kailasampalayam-Appanaickanpalayam- Pappampalayam road. Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4590) 7. Improvements to Riding Quality at Km 15/6-19/6 of Tiruchengode-Komarapalayam road (MD 726). Including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4568) 8. Improvements to Riding Quality at Km 2/8-3/2 and 6/4-7/2, of Molasi road Including upkeeping for a period of 60 months ( 01-CRIDP-19-20-I-4589) 9. Construction of Drain at km 78/0-78/4 (L/S) of Malliakarai - Rasipuram-Tiruchengode -Erode Road (SH 79) (01-CRIDP-19-20-S-0447) 10. Construction of Drain at km 4/4-4/8 (R/S) of Tiruchengode-Komarapalayam road (MD 726) (01-CRIDP-19-20-M-1355) 11. Construction of Box culvert at km 2/4 of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street (01-CRIDP-19-20-O-2653) 12. Construction of Retaining wall at Km 2/4 (L/S & R/S) of km 7/4 of Sankari - Thiruchengode road to Vellalapatti road (via) Athurampalayam Mathakovil Adhithiravidar street (01-CRIDP-19-20-O-2686) 13. Providing Center Median at km 48/8-49/2 & km 50/4 of Omalur-Sankari-Tiruchengode-Paramathy Road (SH 86) (01-CRIDP-19-20-S-0437)"
TRN : 718805 |  Salem - Tamil Nadu
Contract Value : 5.17 Crore | Agency Name : Highway Department
Tender award for improvements and improvements to riding quality to government roads including construction of box culvert, retaining wall, drain and providing centere medain and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package52) the following works are involved in this package 1. improvements of komarapalayam-bhavani road (abonded nh 47) at km 2/4-3/460 (sh22) including upkeeping for a period of 60 months (01-cridp-19-20-s-0420) 2. construction of box culvert at km 22/10 of tiruchengode- komarapalayam road (md 726) (01-cridp-19-20-m-1338) 3. improvements to riding quality at km 33/0-34/700 of komarapalayam-pallipalayam-jedarpalayam-pandamangalam-velur road (sh 198). including upkeeping for a period of 60 months (01-cridp-19-20-i-4560) 4. providing center median at km 52/6-53/0 of omalur-sankari-tiruchengode-paramathy road (sh 86) (01-cridp-19-20-s-0431) 5. improvements to riding quality at km 77/4-77/8 of malliakarai-rasipuram-tiruchengode-erode road (sh 79). including upkeeping for a period of 60 months (01-cridp-19-20-i-4558) 6. improvements to riding quality at km 4/2-6/965 of kailasampalayam-appanaickanpalayam- pappampalayam road. including upkeeping for a period of 60 months (01-cridp-19-20-i-4590) 7. improvements to riding quality at km 15/6-19/6 of tiruchengode-komarapalayam road (md 726). including upkeeping for a period of 60 months (01-cridp-19-20-i-4568) 8. improvements to riding quality at km 2/8-3/2 and 6/4-7/2, of molasi road including upkeeping for a period of 60 months ( 01-cridp-19-20-i-4589) 9. construction of drain at km 78/0-78/4 (l/s) of malliakarai - rasipuram-tiruchengode -erode road (sh 79) (01-cridp-19-20-s-0447) 10. construction of drain at km 4/4-4/8 (r/s) of tiruchengode-komarapalayam road (md 726) (01-cridp-19-20-m-1355) 11. construction of box culvert at km 2/4 of km 7/4 of sankari - thiruchengode road to vellalapatti road (via) athurampalayam mathakovil adhithiravidar street (01-cridp-19-20-o-2653) 12. construction of retaining wall at km 2/4 (l/s & r/s) of km 7/4 of sankari - thiruchengode road to vellalapatti road (via) athurampalayam mathakovil adhithiravidar street (01-cridp-19-20-o-2686) 13. providing center median at km 48/8-49/2 & km 50/4 of omalur-sankari-tiruchengode-paramathy road (sh 86) (01-cridp-19-20-s-0437)"
3307 Special Repairs to Government Roads in Rasipuram (H) C&M Sub Division (Package 89) The Following works are involved in this package 1) Special Repairs to Km 2/0-4/0 of Mangalapuram - Urambu - Udaiyarpalayam Road 2) Special Repairs to Km 3/6-6/510 of R.Pudupatty - Moolapallipatty - Mettala Road 3) Special Repairs to Km 4/2-5/6 of Km 4/2 of Mettala - Mullukuruchi Road to K.Kanavaipatty (via) P.Kanavaipatty Road 4) Special Repairs to Km 0/0-3/4 of Thammampatty Forest Road to Parappansolai Road 5) Special Repairs to Km 1/4-2/4 of Devasthanampudur - Oduvankuruchi Road"
3308 Widening, Improvements and Improvements to Riding Quality to Government Roads including Providing Bus Lay Bye, Construction and Reconstruction of Pipe culvert,Construction of Retaining wall and well Protective wall and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package48) The Following works are involved in this package 1.Widening from Two lane to Three lane and Improvements of Tiruchengode - Ariyanur Road at Km 9/0-10/6, including Reconstruction of Pipe culvert at Km 9/8 and providing bus lay bye at Km22/6 (2 Nos) (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0413 2.Widening from single lane to Intermediate lane and Improvements of Ramapuram Road at Km 0/0-3/0 including Construction of pipe culvert at Km 1/4 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2644 3.Widening from single lane to Intermediate lane and Improvements of Ramapuram Road at Km 3/0-4/700 including Construction of pipe culvert at Km 4/2, Providing bus lay bye at Km4/8 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2645 4.Construction of Retaining wall at Km0/8, 2/4 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2681 5.Construction of Retaining wall at Km2/6, 2/8 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2682 6.Construction of Retaining wall at Km2/10 of Velagoundampatti - Elur - Puduchatram Road 01-CRIDP-19-20-O-2683 7. Improvements to Riding Quality at km 5/4-6/2 of Tiruchengode - Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4555 8.Improvements to Riding Quality at km 12/0-13/0 of Konganapuram - Vaikuntham - Kalipatti Road (MD 843) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4564 9.Improvements to Riding Quality at Km 2/0-4/6 of Sakkaramplayam - Periyamanali - Elur Road including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4580 10.Improvements to Riding Quality at km 1/8-3/0 of Mavureddipatti - Kokkalai Road (Using Plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4581 11.Improvements to Riding Quality at km 3/0-4/8 of Mavureddipatti - Kokkalai Road (Using Plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4582 12.Construction well protecting wall at Km 5/8 of Pullagoundampatti - Serukalai Road 01-CRIDP-19-20-O-2663 13.Construction well protecting wall at Km 10/2 of Ramapuram Road 01-CRIDP-19-20-O-2661 14.Construction well protecting wall at Km 8/2 of Sengunthar kalaikalluri Vattur palayakariyampalayam Road 01-CRIDP-19-20-O-2662 15.Construction well protecting wall at Km 0/6 of Mavureddipatti-Kokkalai road 01-CRIDP-19-20-O-2666"
TRN : 718807 |  Salem - Tamil Nadu
Contract Value : 6.64 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including providing bus lay bye, construction and reconstruction of pipe culvert,construction of retaining wall and well protective wall and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package48) the following works are involved in this package 1.widening from two lane to three lane and improvements of tiruchengode - ariyanur road at km 9/0-10/6, including reconstruction of pipe culvert at km 9/8 and providing bus lay bye at km22/6 (2 nos) (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-s-0413 2.widening from single lane to intermediate lane and improvements of ramapuram road at km 0/0-3/0 including construction of pipe culvert at km 1/4 including upkeeping for a period of 60 months 01-cridp-19-20-o-2644 3.widening from single lane to intermediate lane and improvements of ramapuram road at km 3/0-4/700 including construction of pipe culvert at km 4/2, providing bus lay bye at km4/8 including upkeeping for a period of 60 months 01-cridp-19-20-o-2645 4.construction of retaining wall at km0/8, 2/4 of velagoundampatti - elur - puduchatram road 01-cridp-19-20-o-2681 5.construction of retaining wall at km2/6, 2/8 of velagoundampatti - elur - puduchatram road 01-cridp-19-20-o-2682 6.construction of retaining wall at km2/10 of velagoundampatti - elur - puduchatram road 01-cridp-19-20-o-2683 7. improvements to riding quality at km 5/4-6/2 of tiruchengode - ariyanur road (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-i-4555 8.improvements to riding quality at km 12/0-13/0 of konganapuram - vaikuntham - kalipatti road (md 843) including upkeeping for a period of 60 months 01-cridp-19-20-i-4564 9.improvements to riding quality at km 2/0-4/6 of sakkaramplayam - periyamanali - elur road including upkeeping for a period of 60 months 01-cridp-19-20-i-4580 10.improvements to riding quality at km 1/8-3/0 of mavureddipatti - kokkalai road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4581 11.improvements to riding quality at km 3/0-4/8 of mavureddipatti - kokkalai road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4582 12.construction well protecting wall at km 5/8 of pullagoundampatti - serukalai road 01-cridp-19-20-o-2663 13.construction well protecting wall at km 10/2 of ramapuram road 01-cridp-19-20-o-2661 14.construction well protecting wall at km 8/2 of sengunthar kalaikalluri vattur palayakariyampalayam road 01-cridp-19-20-o-2662 15.construction well protecting wall at km 0/6 of mavureddipatti-kokkalai road 01-cridp-19-20-o-2666"
3309 Special Repairs to Government Roads in Namakkal (H) C&M Sub Division (Package 91) The Following works are involved in this package 1.Special Repairs to Km 0/0-1/8 of Chittalandur - Jedarpalayam Road. 2.Special Repairs to Km0/0-2/0 of Koodacheri-Vasanthapuram-Nadanthai road 3.Special Repairs to Km 0/0-4/0 of Pandamangalam-Vengarai road 4.Special Repairs to Km 2/0-4/0 of Idumpankulam-Panangkadu road"
3310 Widening, Improvements and Improvements to Riding Quality to Government Roads including Widening of RCC slab culvert, Reconstruction of Box Culvert, Providing Centre Median, Construction of Drain an Well Protective wall and Upkeeping for a period of 60 months in Tiruchengodu (H) C&M Sub Division (Package47) The Following works are involved in this package 1.Widening from Two lane to Three lane and Improvements of Mallikarai - Rasipuram - Tiruchengode - Erode Road at Km 71/3-72/0 including Construction of Storm water drain at Km 71/3-71/8 (SH 79) including upkeeping for a period of 60 months 01-CRIDP-19-20-S-0411 2.Construction of storm water Drain at Km 75/5-76/2 of Mallikarai - Rasipuram - Tiruchengode - Erode Road including Providing footpath at Km 75/5-76/2 (Arthanarieswarar Temple Girivalapathai) (SH79) 01-CRIDP-19-20-S-0443 3.Widening from Intermediate lane to Two lane and Improvements of Vaiyappamalai-Velagoundampatti road at Km 12/0-14/4 including Widening of RCC slab culvert at Km 12/8 and Reconstruction of Box culvert at Km 14/2(MD 857) including upkeeping for a period of 60 months 01-CRIDP-19-20-M-1327 4.Improvements of Athumedu-Munjanur-Kallupalayam Road at Km 4/0-5/660 including upkeeping for a period of 60 months 01-CRIDP-19-20-O-2648 5.Construction of Retaining wall at Km 4/0-5/0 of Authumedu - Munjanur - Kallupalayam Road 01-CRIDP-19-20-O-2684 6.Improvements to Riding Quality at Km 15/0-16/6 of Tiruchengode-Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4556 7. Improvements to Riding Quality at Km 16/6-17/2 of Tiruchengode-Ariyanur Road (SH 86) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4557 8.Improvements to Riding Quality at Km 5/300-7/4 of Mudalaipattipudur-Kalnaickkanur Road (MD 1176) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4567 9.Improvements to Riding Quality at Km 7/4 - 8/2 of Mudalaipattipudur - Kalnaickanur Road (MD 1176) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4569 10.Improvements to Riding Quality at Km 0/0-2/0 of Kailasampalayam-Kanakkampatti-Appiapattti Road (Using plastic waste) including upkeeping for a period of 60 months 01-CRIDP-19-20-I-4579 11.Providing Center Median at Km75.600, 76.000 to 76.400of Malliakarai - Rasipuram -Tiruchengodu - Erode road (SH 79) 01-CRIDP-19-20-S-0435 12.Construction Well protecting wall at Km11/4 of Tiruchengode - Namakkal Road (SH 94) 01-CRIDP-19-20-S-0430 13.Construction Well protecting wall at Km 0/2 of Serukalai cross Road 01-CRIDP-19-20-O-2660 14.Construction Well protecting wall at Km 0/2 of Km 17/4 of Tiruchengode-Namakkal road to Mavureddipatti road 01-CRIDP-19-20-O-2664 15.Construction Well protecting wall at Km 1/10 of Lathuvadi Union Road 01-CRIDP-19-20-O-2665 16.Construction Well protecting wall at Km 2/4 of Unjanai-Pokkampalayam Road 01-CRIDP-19-20-O-2667"
TRN : 718808 |  Salem - Tamil Nadu
Contract Value : 6.70 Crore | Agency Name : Highway Department
Tender award for widening, improvements and improvements to riding quality to government roads including widening of rcc slab culvert, reconstruction of box culvert, providing centre median, construction of drain an well protective wall and upkeeping for a period of 60 months in tiruchengodu (h) c&m sub division (package47) the following works are involved in this package 1.widening from two lane to three lane and improvements of mallikarai - rasipuram - tiruchengode - erode road at km 71/3-72/0 including construction of storm water drain at km 71/3-71/8 (sh 79) including upkeeping for a period of 60 months 01-cridp-19-20-s-0411 2.construction of storm water drain at km 75/5-76/2 of mallikarai - rasipuram - tiruchengode - erode road including providing footpath at km 75/5-76/2 (arthanarieswarar temple girivalapathai) (sh79) 01-cridp-19-20-s-0443 3.widening from intermediate lane to two lane and improvements of vaiyappamalai-velagoundampatti road at km 12/0-14/4 including widening of rcc slab culvert at km 12/8 and reconstruction of box culvert at km 14/2(md 857) including upkeeping for a period of 60 months 01-cridp-19-20-m-1327 4.improvements of athumedu-munjanur-kallupalayam road at km 4/0-5/660 including upkeeping for a period of 60 months 01-cridp-19-20-o-2648 5.construction of retaining wall at km 4/0-5/0 of authumedu - munjanur - kallupalayam road 01-cridp-19-20-o-2684 6.improvements to riding quality at km 15/0-16/6 of tiruchengode-ariyanur road (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-i-4556 7. improvements to riding quality at km 16/6-17/2 of tiruchengode-ariyanur road (sh 86) including upkeeping for a period of 60 months 01-cridp-19-20-i-4557 8.improvements to riding quality at km 5/300-7/4 of mudalaipattipudur-kalnaickkanur road (md 1176) including upkeeping for a period of 60 months 01-cridp-19-20-i-4567 9.improvements to riding quality at km 7/4 - 8/2 of mudalaipattipudur - kalnaickanur road (md 1176) including upkeeping for a period of 60 months 01-cridp-19-20-i-4569 10.improvements to riding quality at km 0/0-2/0 of kailasampalayam-kanakkampatti-appiapattti road (using plastic waste) including upkeeping for a period of 60 months 01-cridp-19-20-i-4579 11.providing center median at km75.600, 76.000 to 76.400of malliakarai - rasipuram -tiruchengodu - erode road (sh 79) 01-cridp-19-20-s-0435 12.construction well protecting wall at km11/4 of tiruchengode - namakkal road (sh 94) 01-cridp-19-20-s-0430 13.construction well protecting wall at km 0/2 of serukalai cross road 01-cridp-19-20-o-2660 14.construction well protecting wall at km 0/2 of km 17/4 of tiruchengode-namakkal road to mavureddipatti road 01-cridp-19-20-o-2664 15.construction well protecting wall at km 1/10 of lathuvadi union road 01-cridp-19-20-o-2665 16.construction well protecting wall at km 2/4 of unjanai-pokkampalayam road 01-cridp-19-20-o-2667"

Get Tamil Nadu Awarded Tender Alert...

315404

Advertisment
Advertisment