You have searched for chhattisgarh in Awarded Tender Result. Click on any tender to view further details.

731 Procurement of DGMS approved Man Riding Haulage Wire Rope 16mm
TRN : 769339 |  Korba - Chhattisgarh
Contract Value : 6.58 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for procurement of dgms approved man riding haulage wire rope 16mm
732 Supply drinking water by Mobile tankers at BhukBhukhi Village under Chirimiri OCP Sub area in Chirimiri Area.
TRN : 769340 |  Korba - Chhattisgarh
Contract Value : 7.06 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for supply drinking water by mobile tankers at bhukbhukhi village under chirimiri ocp sub area in chirimiri area.
733 Strengthening of exit road from KB - 5 to Thana boundary wall at KOCP of Kusmunda Area.
TRN : 769341 |  Korba - Chhattisgarh
Contract Value : 10.00 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for strengthening of exit road from kb - 5 to thana boundary wall at kocp of kusmunda area.
734 Civil works in RCPs and MOVs under PRRPL, Korba - Group B NOTE: 1. Please enable macros before filling the rates to see the quoted figures in words. 2. The bidder shall quote firm prices “Excess(+)/ At Par/ Less(-)” against the rates mentioned in the price schedule provided in BoQ1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off. 3. Only ""Bidder Name"", ""Excess (+) or ""At Par"" or Less (-)"" & ""Percentage"" are to be filled by the bidder in the designated ""Sky Blue cells"". For ""At Par"" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate. 4. ""Excess (+)"" or ""At Par"" or ""Less (-)"" can be selected from the dropdown menu by clicking on the cell. 5. No changes shall be made by the bidder to S.No., Unit, Quantity. 6. In case of any difference in item description/unit/quantity in BOQ, then the item description/quantity/unit given in the tender document shall prevail. 7.The rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications. 8. Goods and Services tax as per GST Act 2017 for concerned services has been added to the base price of below mentioned services. If the bidder wishes to quote some other Goods and Services tax rate other than mentioned in the price schedule provided in BoQ1 sheet, they may quote the same in ""Annexure H-2 - Exceptions and Deviations"". Statutory variation on Goods and Services Tax as applicable for the category/service shall be to Owner’s account up to the contractual completion period. Reverse charges mechanism on Goods and Services tax amount shall be applicable as per Govt. rules. 9. Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ work sheet. Abbreviations: Unit: CUM - Cubic Meter, SQM - Square Meter, M - Meter, FT2 - Square Feet, TO - Ton
TRN : 843447 |  Korba - Chhattisgarh
Contract Value : 77.90 Lacs | Agency Name : Indian Oil Corporation Limited
Tender award for civil works in rcps and movs under prrpl, korba - group b note: 1. please enable macros before filling the rates to see the quoted figures in words. 2. the bidder shall quote firm prices “excess(+)/ at par/ less(-)” against the rates mentioned in the price schedule provided in boq1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. in case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off. 3. only ""bidder name"", ""excess (+) or ""at par"" or less (-)"" & ""percentage"" are to be filled by the bidder in the designated ""sky blue cells"". for ""at par"" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate. 4. ""excess (+)"" or ""at par"" or ""less (-)"" can be selected from the dropdown menu by clicking on the cell. 5. no changes shall be made by the bidder to s.no., unit, quantity. 6. in case of any difference in item description/unit/quantity in boq, then the item description/quantity/unit given in the tender document shall prevail. 7.the rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications. 8. goods and services tax as per gst act 2017 for concerned services has been added to the base price of below mentioned services. if the bidder wishes to quote some other goods and services tax rate other than mentioned in the price schedule provided in boq1 sheet, they may quote the same in ""annexure h-2 - exceptions and deviations"". statutory variation on goods and services tax as applicable for the category/service shall be to owner’s account up to the contractual completion period. reverse charges mechanism on goods and services tax amount shall be applicable as per govt. rules. 9. bidders are advised strictly not to alter or change the boq format/ contents. bidders are also advised not to paste any image file or put any additional conditions in the boq work sheet. abbreviations: unit: cum - cubic meter, sqm - square meter, m - meter, ft2 - square feet, to - ton
735 Civil works in Station Piping area under PRRPL, Korba - Group A NOTE: 1. Please enable macros before filling the rates to see the quoted figures in words. 2. The bidder shall quote firm prices “Excess(+)/ At Par/ Less(-)” against the rates mentioned in the price schedule provided in BoQ1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. In case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off. 3. Only ""Bidder Name"", ""Excess (+) or ""At Par"" or Less (-)"" & ""Percentage"" are to be filled by the bidder in the designated ""Sky Blue cells"". For ""At Par"" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate. 4. ""Excess (+)"" or ""At Par"" or ""Less (-)"" can be selected from the dropdown menu by clicking on the cell. 5. No changes shall be made by the bidder to S.No., Unit, Quantity. 6. In case of any difference in item description/unit/quantity in BOQ, then the item description/quantity/unit given in the tender document shall prevail. 7.The rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications. 8. Goods and Services tax as per GST Act 2017 for concerned services has been added to the base price of below mentioned services. If the bidder wishes to quote some other Goods and Services tax rate other than mentioned in the price schedule provided in BoQ1 sheet, they may quote the same in ""Annexure H-2 - Exceptions and Deviations"". Statutory variation on Goods and Services Tax as applicable for the category/service shall be to Owner’s account up to the contractual completion period. Reverse charges mechanism on Goods and Services tax amount shall be applicable as per Govt. rules. 9. Bidders are advised strictly not to alter or change the BOQ format/ contents. Bidders are also advised not to paste any image file or put any additional conditions in the BOQ work sheet. Abbreviations: Unit: CUM - Cubic Meter, SQM - Square Meter
TRN : 843448 |  Korba - Chhattisgarh
Contract Value : 20.26 Lacs | Agency Name : Indian Oil Corporation Limited
Tender award for civil works in station piping area under prrpl, korba - group a note: 1. please enable macros before filling the rates to see the quoted figures in words. 2. the bidder shall quote firm prices “excess(+)/ at par/ less(-)” against the rates mentioned in the price schedule provided in boq1 sheet as per instructions provided herein after taking into account all the tender terms and conditions and scope of work. in case rates are quoted to more than 2 decimal places then, the amount quoted towards the tender shall be worked out for the rates quoted to first 2 decimal points without rounding off. 3. only ""bidder name"", ""excess (+) or ""at par"" or less (-)"" & ""percentage"" are to be filled by the bidder in the designated ""sky blue cells"". for ""at par"" selection, the percentage quoted shall be treated as 0.00 and quoted amount at par with estimate. 4. ""excess (+)"" or ""at par"" or ""less (-)"" can be selected from the dropdown menu by clicking on the cell. 5. no changes shall be made by the bidder to s.no., unit, quantity. 6. in case of any difference in item description/unit/quantity in boq, then the item description/quantity/unit given in the tender document shall prevail. 7.the rates quoted by the tenderer shall include all cost towards equipment, labour & laboratory back-up, logistics, transport, spares, tools, tackles, consumables, etc., travel and stay arrangements and other incidentals including supply of materials as may be necessary for rendering the services as per detailed specifications. 8. goods and services tax as per gst act 2017 for concerned services has been added to the base price of below mentioned services. if the bidder wishes to quote some other goods and services tax rate other than mentioned in the price schedule provided in boq1 sheet, they may quote the same in ""annexure h-2 - exceptions and deviations"". statutory variation on goods and services tax as applicable for the category/service shall be to owner’s account up to the contractual completion period. reverse charges mechanism on goods and services tax amount shall be applicable as per govt. rules. 9. bidders are advised strictly not to alter or change the boq format/ contents. bidders are also advised not to paste any image file or put any additional conditions in the boq work sheet. abbreviations: unit: cum - cubic meter, sqm - square meter
736 Procurement of spares for Eimco Elecon make UDM 611/612
TRN : 768775 |  Korba - Chhattisgarh
Contract Value : 19.11 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for procurement of spares for eimco elecon make udm 611/612
737 Changing of filter media of 1 MGD Rapid gravity sand filter of IWSS Balgi.of SRK-Balgi Sub area. of Korba Area.
TRN : 769990 |  Korba - Chhattisgarh
Contract Value : 5.99 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for changing of filter media of 1 mgd rapid gravity sand filter of iwss balgi.of srk-balgi sub area. of korba area.
738 PROCUREMENT OF SPARES FOR BH100T DUMPER
TRN : 768617 |  Korea - Chhattisgarh
Contract Value : 3.51 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for procurement of spares for bh100t dumper
739 Repair and maintenance of water treatment plant at DSB Sub Area of Korba Area.
TRN : 769941 |  Korba - Chhattisgarh
Contract Value : 1.91 Lacs | Agency Name : South Eastern Coalfields Limited
Tender award for repair and maintenance of water treatment plant at dsb sub area of korba area.
740 PROCUREMENT OF SPARES OF AUTOMATIC FIRE DETECTION AND SUPPRESSION SYSTEM(AFDSS) FOR BD355 DOZER, WHEEL LOADER WA-800,HYD. EXCAVATOR BE-1000

Get Chhattisgarh Awarded Tender Alert...

246794

Advertisment
Advertisment