You have searched for madhya-pradesh in Awarded Tender Result. Click on any tender to view further details.

2471 Construction of Teen Shade at Sangam place Narmada river, village Bikore. MLA Fund 1st Call, PAC Rs. 4.46 Lacs on Building SOR 01.08.2014 (Ammendment upto date), Completion period 60 days.
2472 Construction of Cross Drainage Single Row of 1200 mm dia culvert between Village Baglone to Bhanpur. MLA Fund 1st Call, PAC Rs. 8.88 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 90 days.
2473 B.T. Renewal on Different roads of Group of Minor Road P and T Chouraha to Ajak Thana, Sumit Nagar by pass, Nehru park to Hero Honda showroom to SNG Chouraha, Police line app. road, DIG bunglow app. , Multipurpose school road. 1st Call, PAC Rs. 87.62 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.
2474 B.T. Renewal on Biora Rohna road, Length 5.00 Km. PAC Rs. 40.53 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 90 days.
2475 B.T. Renewal on Mofada Khedi Ahir Bamhangaon road. PAC Rs. 19.45 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 60 days.
2476 CONSTRUCTION OF SUBMERSIBLE BRIDGE ACROSS NALLA ON MAIN ROAD TO JHAWALIYA ROAD
TRN : 843483 |  Indore - Madhya Pradesh
Contract Value : 1.20 Crore | Agency Name : Public Works Department
Tender award for construction of submersible bridge across nalla on main road to jhawaliya road
2477 CONSTRUCTION OF GRAVEL ROAD AT WARD NO. 04 KHALAUNDH 900mtr.
TRN : 843472 |  Umaria - Madhya Pradesh
Contract Value : 8.75 Lacs | Agency Name : Nagar Palika Parishad
Tender award for construction of gravel road at ward no. 04 khalaundh 900mtr.
2478 Survey, Investigation, Design and Construction of Piped Water Supply Scheme at Village - CHIKMARA Block KATANGI Distt. Balaghat based on Tube well including installation of electric submersible/centrifugal water motor pump, construction of 20 KL R.C.C. Sump well, construction of 75 KL R.C.C. OHT 18 Mtr. staging, laying and jointing of rising main and distribution pipe line system, household tap connections, construction of pump house and electric power connection at Tube wells and sump wel including cost of all materiall and labour with 45 Days Trial Run/Commissioning period and 24 Months Operation and Maintenance of entire scheme.
2479 Hiring with Operation and Maintenance of Air coolers at NSC during the summer season 2020
TRN : 841751 |  Singrauli - Madhya Pradesh
Contract Value : 3.77 Lacs | Agency Name : Northern Coalfields Limited
Tender award for hiring with operation and maintenance of air coolers at nsc during the summer season 2020
2480 Construction of 32 nos RCC ventilation stopping and 46 nos RCC isolation stoppings in development widening and depillaring panels ( CM Panel) in VII seam at Bangwar UG Mine of Sohagpur Area.

Get Madhya Pradesh Awarded Tender Alert...

457250

Advertisment
Advertisment