2831 Widening , Improvement and Reconstruction of RCC Box Culvert Works in Vellore (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at KM 10/750-13/0 of Arcot Kannamangalam Road (SH 129) including upkeeping for a period of 60 Months. (01-CRIDP-19-20-I-3864 ) B) Improvements to Riding Quality at KM 17/4-18/8 and KM 22/8-25/4 of Arcot Kannamangalam Road (SH 129) including upkeeping for a period of 60 Months. (01-CRIDP-19-20-I-3865) C) Widening from Single Lane to Intermediate Lane and Improvements of Punganur Road (via) Palamathi Road at Km 15/0-16/2 including upkeeping for a period of 60 Months. (01-CRIDP-19-20-O-2001) D)Widening from Single Lane to Intermediate Lane and Improvements of Punganur Road (via) Palamathi Road to KM 12/0-15/0 including Reconstruction of Culvert at Km 12/10 including upkeeping for a period of 60 Months. (01-CRIDP-19-20-O-2000) E) Construction of culvert at KM 116/10 of Krishnagiri Ranipet Road (Abandoned NH46) including construction of Drain at KM 116/10 (SH24) (01-CRIDP-19-20-S-0138) F) Improvements to Riding Quality at Km 0/0-2/0 of Pallaedaympatti T.B.Hospital Road including upkeeping for a period of 60 Months. (01-CRIDP-19-20-I-3894)
2832 Widening and Improvements, Improvements to Riding Quality, Reconstruction of RCC Slab Culverts, Reconstruction of Box Culverts and including Up Keeping for a period of 60 months on Government Roads in Kulithalai (Highways), C&M, Sub Division. Package No.30 A) Widening from Two lane to three lane and Improvements of Allithurai - Thogamalai road Km 32/4-33/520 (MD 12) including upkeeping for a period of 60 Months B) Improvements to Riding Quality at Km 21/0-24/0 of Pettavaithalai - Nangavaram-Kavalkaranpatty Road (MD 658) including upkeeping for a period of 60 Months C) Improvements to Riding Quality at Km 24/0-26/4 of Pettavaithalai - Nangavaram-Kavalkaranpatty Road MD 658) including upkeeping for a period of 60 Months D) Reconstruction of RCC slab culvert at Km 0/10 of Poyyamani - Inungur road E) Reconstruction of RCC slab culvert at Km 1/6 of Kavundampatty - Koppu road F) Reconstruction of RCC slab culvert at Km 2/2 of Kavundampatty - Koppu road G) Reconstruction of Box culvert at Km 3/2 of of Kavundampatty - Koppu road H) Improvements of Vadaseri road at Km 0/0-5/8 of including Reconstruction of RCC Slab Culvert at Km 1/10,4/8 including upkeeping for a period of 60 Months I) Improvements to Riding Quality of Old mangama road at Km 24/0-26/0 including upkeeping for a period of 60 Months
2833 Improvements, Curve Improvements and Improvements to Riding Quality to Government Roads Including Reconstruction of RCC slab Culvert and up keeping the roads for a period of 60 months in Pennagaram (H) C&M Sub Division (Package73) The Following works are involved in this package 1)Improvements to Riding Quality at Km 2/0 - 3/0, 4/2 - 4/4, 7/0 - 8/0 & 11/6 - 14/4 of Pennagaram - Mudugampatti - Malaiyanur road. (MD 859) (Using plastic waste) including upkeeping for a period of 60 months. .(01-CRIDP-19-20-I-4610) 2)Improvements to Riding Quality at Km 9/2 - 11/6 of Pennagaram - Mudugampatti - Malaiyanur road.(MD 859) including upkeeping for a period of 60 months.(01-CRIDP-19-20-I-4606) 3)Improvements to Riding Quality at Km 14/4 - 19/0 of Pennagaram - Mudugampatti - Malaiyanur road.(MD 859) including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4607) 4) Improvements of Pennagaram - Mudugampatti - Malaiyanur road.at Km 19/0 - 20/8 (MD 859) including upkeeping for a period of 60 months.(01-CRIDP-19-20-M-1371) 5) Improvements of Pennagaram - Mudugampatti - Malaiyanur road at Km 20/8 - 22/8 (MD 859) including upkeeping for a period of 60 months.(01-CRIDP-19-20-M-1377) 6) Reconstruction of RCC Slab Culvert at Km 11/6 Pennagaram - Mudugampatti - Malaiyanur road Curve Improvements at Km 12/6 (MD 859) including upkeeping for a period of 60 months. (01-CRIDP-19-20-M-1379).
TRN : 750490 |  Salem - Tamil Nadu
Contract Value : 5.84 Crore | Agency Name : Highway Department
Tender award for improvements, curve improvements and improvements to riding quality to government roads including reconstruction of rcc slab culvert and up keeping the roads for a period of 60 months in pennagaram (h) c&m sub division (package73) the following works are involved in this package 1)improvements to riding quality at km 2/0 - 3/0, 4/2 - 4/4, 7/0 - 8/0 & 11/6 - 14/4 of pennagaram - mudugampatti - malaiyanur road. (md 859) (using plastic waste) including upkeeping for a period of 60 months. .(01-cridp-19-20-i-4610) 2)improvements to riding quality at km 9/2 - 11/6 of pennagaram - mudugampatti - malaiyanur road.(md 859) including upkeeping for a period of 60 months.(01-cridp-19-20-i-4606) 3)improvements to riding quality at km 14/4 - 19/0 of pennagaram - mudugampatti - malaiyanur road.(md 859) including upkeeping for a period of 60 months. (01-cridp-19-20-i-4607) 4) improvements of pennagaram - mudugampatti - malaiyanur road.at km 19/0 - 20/8 (md 859) including upkeeping for a period of 60 months.(01-cridp-19-20-m-1371) 5) improvements of pennagaram - mudugampatti - malaiyanur road at km 20/8 - 22/8 (md 859) including upkeeping for a period of 60 months.(01-cridp-19-20-m-1377) 6) reconstruction of rcc slab culvert at km 11/6 pennagaram - mudugampatti - malaiyanur road curve improvements at km 12/6 (md 859) including upkeeping for a period of 60 months. (01-cridp-19-20-m-1379).
2834 Widening, Strengthening, Improvements to Riding quality and Culvert including upkeeping works for 60 Months in Vridhachalam (H) C&M Subdivision Jurisdiction (Package-61) A-Widening from two lane to Three lane and Strengthening of Vridhachalam-Tholudur road at km 7/0-8/0 including Reconstruction of Box culvert at km 7/10 (SH-141) including upkeeping for a period of 60 months B- Widening from two lane to three lane and Strengthening of Vridhachalam-Tholudur road at km 8/0-9/0 (SH-141) including upkeeping for a period of 60 months C-Widening from two lane to Three lane and Strengthening of Vridhachalam-Tholudur road at km 9/0-10/0 including Reconstruction of culvert at km 9/4 (SH-141) including upkeeping for a period of 60 months D-Improvement to riding quality at km 0/0-3/0 of Sethiyathoppu-Kammapuram road (via) Veeramudaiyanatham including upkeeping for a period of 60 months
2835 REPAIRS MAINTENANCE TO COMPOUND WALL FENCING DRAINS INCLUDING ALLIED WORKS AT ZONE A AND B UNDER AGE I NAVY CHENNAI
TRN : 701986 |  Chennai - Tamil Nadu
Contract Value : 14.61 Lacs | Agency Name : Military Engineer Services
Tender award for repairs maintenance to compound wall fencing drains including allied works at zone a and b under age i navy chennai
2836 Improvements and Improvements to Riding Quality to Government Roads and up keeping the roads for a period of 60 months in Dharmapuri (H) C&M Sub Division (Package53) The Following works are involved in this package 1) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.144/450-145/4 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0452) 2) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.146/4-147/0 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0453) 3) Improvements of Varanasi - Kanyakumari road (Abandoned NH-7) Dharmapuri Town Limit at Km.145/4-146/4 (SH-129) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0454) 4) Improvements of Dharmapuri State Highways (Old NH-7) road at Km.135/8-136/4 and 136/6-137/2 (SH-14) including upkeeping for a period of 60 months (01-CRIDP-19-20-S-0455) 5) Improvements to Riding Quality at Km.62/8-63/0 and 68/6-69/0 of Hogenakkal - Pennagaram - Dharmaupri - Thirupathur road (SH-60) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4596) 6) Improvements to Riding Quality at Km.12/2-16/0 of Bommidi R.S. to Thoppaiyar road (using Plastic Waste) (MD-860) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-4608)"
2837 Widening, Strengthening, Improvements, Junnction Improvements, Improvements to Riding quality and Culvert including upkeeping works for 60 Months in Thittagudy (H) C&M Subdivision Jurisdiction (Package-62) A-Strengthening of Vridhachalam - Tholudur road Km 19/0 - 20/5 including juction Improvement at Km19/4&20/4 upkeeping for a period of 60 months B-Widening From Single Lane to Intermediate Lane and Improvements of Tholudur - vadagarampoondi Road at Km 4/0 - 6/0 including reconstruction of culvert at Km 4/10 & 5/2 including upkeeping for a period of 60 months C- Improvements of Sirupakkam - Sitheri road Km 2/0 - 4/0 Including reconstruction of Culvert at Km 2/2 including upkeeping for a period of 60 months D-Improvements to Riding Quality at km 20/2 - 24/2 of Thiyagadurgam - Adari (MD 811) including upkeeping for a period of 60 months E- Improvements to riding quality at km.0/0-1/0 of Nallur - Memathur road including upkeeping for a period of 60 months "
2838 Providing Gantry Board including Road Furniture in Edappady (H) C&M Division (Package 84) The Following works are involved in this package 1) Providing Metal crash barrier at km 7/6- 7/10 of Edappady - Bypass Road (SH ) 01-CRIDP-19-20-S-0399 2)Providing Metal crash barrier at km 4/4 & 6/4 of Sankari - Mecheri road (via) Edappady (SH 220) 01-CRIDP-19-20-S-0400 3)Providing Cantilever Gantry board at km 35/6 & 37/10 of Salem-Cochin-Kanyakumari Road (Abandoned NH 47) Sankari (SH117) including road furniture 01-CRIDP-19-20-S-0402 4) Providing Cantilever Gantry board at km 0/0, 1/6 & 3/110 of Tharamangalam Byepass road (SH ) including road furniture 01-CRIDP-19-20-S-0401 5) Providing Cantilever Gantry Board at km 187/8 & 188/2 of Varanasi-Kanyakumari Road (Abandoned NH7) Omalur (SH118) including road furniture 01-CRIDP-19-20-S-0403 6) Providing Cantilever Gantry Board at km 34/8 & 35/2 of Sankari - Mecheri road (via) Edappady (SH-220) including road furniture 01-CRIDP-19-20-S-0404 7) Providing Cantilever Gantry Board at km 0/4 and 11/6 of Tharamangalam - Nangavalli- Kunjandiyur Road (SH-223) including road furniture 01-CRIDP-19-20-S-0405 8) Providing Metal crash barrier at km 9/0-9/4 of Alathur Reddipalayam - Thevur road 01-CRIDP-19-20-O-2643
2839 Strengthening, Widening, Improvements and Improvements to Riding Quality to Government Roads including CD works and Protective works and up keeping the roads for a period of 60 months in Denkanikottai (H) C&M Sub Division (Package 76) The Following works are involved in this package 1. Widening from Single lane to Intermediate lane and Strengthening of Denkanikottai -Jawalagiri - Karnataka State limit road at km 12/4-13/0 and 16/8-17/300 Strengthening at Km 17/300-17/8 including CD Works and Protective works including upkeeping for a period of 60 months.(01-CRIDP-19-20-O-2728) 2.Improvements of Nandhimangalam-Karadikkal Road at Km 4/0-7/2 including CD works including upkeeping for a period of 60 months. (01-CRIDP-19-20-O-2748) 3.Improvements to Riding Quality at km 23/4-23/6, 24/0-24/2, 24/8-33/6 of Denknaikottai -Anchetty-Urigam Road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4642) 4. Improvements to Riding Quality at km 36/0-43/4 of Denknaikottai -Anchetty-Urigam Road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4657) 5.Improvements to Riding Quality at Km 1/0-4/4 of Gowthalam- Pachapanatty road including upkeeping for a period of 60 months. (01-CRIDP-19-20-I-4639) 6.Construction of Protective Wall in Tank Bund Portion at Km 12/6 & 12/8 of Denkanikottai -Jawalagiri - Karnataka State limit road (01-CRIDP-19-20-O-2758)"
TRN : 721771 |  Salem - Tamil Nadu
Contract Value : 7.44 Crore | Agency Name : Highway Department
Tender award for strengthening, widening, improvements and improvements to riding quality to government roads including cd works and protective works and up keeping the roads for a period of 60 months in denkanikottai (h) c&m sub division (package 76) the following works are involved in this package 1. widening from single lane to intermediate lane and strengthening of denkanikottai -jawalagiri - karnataka state limit road at km 12/4-13/0 and 16/8-17/300 strengthening at km 17/300-17/8 including cd works and protective works including upkeeping for a period of 60 months.(01-cridp-19-20-o-2728) 2.improvements of nandhimangalam-karadikkal road at km 4/0-7/2 including cd works including upkeeping for a period of 60 months. (01-cridp-19-20-o-2748) 3.improvements to riding quality at km 23/4-23/6, 24/0-24/2, 24/8-33/6 of denknaikottai -anchetty-urigam road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4642) 4. improvements to riding quality at km 36/0-43/4 of denknaikottai -anchetty-urigam road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4657) 5.improvements to riding quality at km 1/0-4/4 of gowthalam- pachapanatty road including upkeeping for a period of 60 months. (01-cridp-19-20-i-4639) 6.construction of protective wall in tank bund portion at km 12/6 & 12/8 of denkanikottai -jawalagiri - karnataka state limit road (01-cridp-19-20-o-2758)"
2840 Widening and Improvement works, Construction of culvert works including upkeeping in Walajah (H) C&M Sub Division Jurisdiction A) Improvements to Riding Quality at Km 22/280-23/760 of Walajah - Sholinghur - Arakkonam Road (SH-61) including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3869) B) Improvements to Riding Quality at Km 0/360-2/2 of Ammur - Kalpudhur Road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3905) C) Improvements to Riding Quality at Km 2/4-3/6 of Km 121/8 of Chennai - Chittoor - Bangalore Road to Namakula Mottur Road (via) Seekarajapuram, Mottur including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3885) D) Improvements to Riding Quality at Km 0/0-3/2 of Ranipet - Ponnai Road to Keeraisathu Road including upkeeping for a period of 60 months (01-CRIDP-19-20-I-3906) E) Reconstruction of narrow culvert at Km 22/10 of Walajah - Sholinghur - Arakkonam Road including reconstruction of Drain at Km 23/0-23/4 (SH-61) (01-CRIDP-19-20-S-0139) F) Reconstruction of Culverts at Km 0/4, 0/8, 2/4 and 3/2 of Ranipet - Ponnai Road to Keeraisathu Road (01-CRIDP-19-20-O-2017) G) Improvements of Ekambaranellore - Thakkampalayam Road at Km 3/6-4/2 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2004) H) Improvements to Km 6/0 of Ponnai - Thiruvalam Road to Kottanatham Road at Km 0/0-1/2 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2010) I) Widening from Single Lane to Intermediate Lane and Improvements of Ammur - Kalpudur Road at Km 2/2-4/4 including extra length of 35m at Km 4/4 including reconstruction of Culverts at Km 0/6, 0/10, 1/2, 1/8, 1/10, 2/10, 4/2 & 4/4 including upkeeping for a period of 60 months (01-CRIDP-19-20-O-1998) J) Widening from Single Lane to Intermediate Lane and Improvements of Ranipet - Thengal Road at Km 114/8-117/0 (Using Plastic Waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2002) K) Widening from Single Lane to Intermediate Lane and Improvements of Ranipet - Thengal Road at Km 117/0-119/0 (Using Plastic Waste) including upkeeping for a period of 60 months (01-CRIDP-19-20-O-2003) L) Reconstruction of narrow culvert at Km 10/6 of Chengalnatham - Rendadi - Kodakkal Road (01-CRIDP-19-20-O-2014).
TRN : 743029 |  Chennai - Tamil Nadu
Contract Value : 7.38 Crore | Agency Name : Highway Department
Tender award for widening and improvement works, construction of culvert works including upkeeping in walajah (h) c&m sub division jurisdiction a) improvements to riding quality at km 22/280-23/760 of walajah - sholinghur - arakkonam road (sh-61) including upkeeping for a period of 60 months (01-cridp-19-20-i-3869) b) improvements to riding quality at km 0/360-2/2 of ammur - kalpudhur road including upkeeping for a period of 60 months (01-cridp-19-20-i-3905) c) improvements to riding quality at km 2/4-3/6 of km 121/8 of chennai - chittoor - bangalore road to namakula mottur road (via) seekarajapuram, mottur including upkeeping for a period of 60 months (01-cridp-19-20-i-3885) d) improvements to riding quality at km 0/0-3/2 of ranipet - ponnai road to keeraisathu road including upkeeping for a period of 60 months (01-cridp-19-20-i-3906) e) reconstruction of narrow culvert at km 22/10 of walajah - sholinghur - arakkonam road including reconstruction of drain at km 23/0-23/4 (sh-61) (01-cridp-19-20-s-0139) f) reconstruction of culverts at km 0/4, 0/8, 2/4 and 3/2 of ranipet - ponnai road to keeraisathu road (01-cridp-19-20-o-2017) g) improvements of ekambaranellore - thakkampalayam road at km 3/6-4/2 including upkeeping for a period of 60 months (01-cridp-19-20-o-2004) h) improvements to km 6/0 of ponnai - thiruvalam road to kottanatham road at km 0/0-1/2 including upkeeping for a period of 60 months (01-cridp-19-20-o-2010) i) widening from single lane to intermediate lane and improvements of ammur - kalpudur road at km 2/2-4/4 including extra length of 35m at km 4/4 including reconstruction of culverts at km 0/6, 0/10, 1/2, 1/8, 1/10, 2/10, 4/2 & 4/4 including upkeeping for a period of 60 months (01-cridp-19-20-o-1998) j) widening from single lane to intermediate lane and improvements of ranipet - thengal road at km 114/8-117/0 (using plastic waste) including upkeeping for a period of 60 months (01-cridp-19-20-o-2002) k) widening from single lane to intermediate lane and improvements of ranipet - thengal road at km 117/0-119/0 (using plastic waste) including upkeeping for a period of 60 months (01-cridp-19-20-o-2003) l) reconstruction of narrow culvert at km 10/6 of chengalnatham - rendadi - kodakkal road (01-cridp-19-20-o-2014).