You have searched for west-bengal in Awarded Tender Result. Click on any tender to view further details.

23621 Construction of Temporary Bus Stand with Brick Paved Road from Vehicle Turning area to Parking Zone, Barricading & Drop Gate at Lot No. 8 including subsequent restoration of land under Kakdwip Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas for ensuing G.S.Mela-2019 (Phase-II)
23622 Construction of Temporary Bus Stand with Brick Paved Road from Vehicle Turning area to Parking Zone, Barricading & Drop Gate at Harwood Point including subsequent restoration of land under Kakdwip Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24 Parganas for ensuing G.S.Mela-2019 (Phase-II)
23623 Maintaince & Repair at the Ground floor of Sagar Balaka (Super Class Inspection Bungalow) at Sagar Island of Kakdwip Highway Sub-Division under Diamond Harbour Highway Division in the District of South 24-Parganas during the year 2018-2019
23624 Interior Decoration at the Ground floor of Sagar Balaka (Super Class Inspection Bungalow) at Sagar Island under Kakdwip Highway Sub-Division of Diamond Harbour Highway Division in the District of South 24-Parganas during the year 2018-2019
23625 Construction of Cement Road from the Dwariknagar BPHC towards south side house of Anata Adak in Mouza- Dwariknagar & G.P.- Namkhana, P.S. & Block- Namkhana, under Kakdwip-I Sub Division. Length = 1597.0m (Plan)
23626 Construction of Cement Road from 6Mile to the house of Gopal Das towards east in Mouza- Dakshin Chandranagar, G.P.- Haripur, P.S. & Block- Namkhana, under Kakdwip-I Sub Division. Length = 1000.0m (Plan)
23627 Construction of Bituminous Road from Bablatala More to Pandar Bazar in Mouza- Radhakrishnanagar, at G.P.- Durbachati, P.S. & Block-Patharpratima, (Ch.00.00m to 2900.00m) Length - 2900.00m under Kakdwp-II Sub-Division of Civil Engineeeing Division No-II, Sundarban Development Board,Department of Sundarban Affairs". ),(Under Plan Head)
23628 Construction of Bituminous Road from Milan Setu 1 to Milan Setu 2 in Mouza- Taranagar & Srinarayanpur, at G.P.- Srinarayanpur Purnachandrapur, P.S. - Dhola Hat, Block-Patharpratima, (Ch.6650.00m to 10010.00m) Length - 3360.00m under Kakdwp-II Sub-Division of Civil Engineeeing Division No-II, Sundarban Development Board,Department of Sundarban Affairs". ), Reach -2 (Under Plan Head)
23629 DIGGING & CONSTRUCTION OF 16 NOS SOLER OPERETED PUMP DUG WELL (SOLAR) 3600MM INTERNAL DIA AT MOUZA CHAKADOBA, MAHATOBANDH UNDER BINPUR-II BLOCK IN THE DISTRICT OF JHARGRAM UNDER DPMU, WBADMIP,
23630 DIGGING & CONSTRUCTION OF 12 NOS SOLER OPERETED PUMP DUG WELL (SOLAR) 3600MM INTERNAL DIA AT MOUZA DULKI UNDER BINPUR-II BLOCK IN THE DISTRICT OF JHARGRAM UNDER DPMU, WBADMIP, PASCHIM

Get West Bengal Awarded Tender Alert...

273593

Advertisment
Advertisment