26574Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 63.54 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for RANGHAIPUR Water Supply Scheme at Harischandrapur - I Dev. Block under Malda Division, PHE Dte. in the District of Malda.
TRN :
601832
|
Malda - West Bengal
Contract Value :
23.37 Lacs |Agency Name :
Public Health Engineering Department
26578Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 49.14 m3 / hr. capacity Iron Elimination Plants (Pressure type) with provision of polishing unit including construction of 1 (one) Compressor Room with internal size (3.6mtr x 3.00 mtr) and proper disposal of backwash water for ARJUNA Water Supply Scheme at Harishchandrapur-II Dev. Block under Malda Division, PHE Dte. in the District of Malda.
TRN :
601833
|
Malda - West Bengal
Contract Value :
19.55 Lacs |Agency Name :
Public Health Engineering Department