You have searched for west-bengal in Awarded Tender Result. Click on any tender to view further details.

3531 Construction of cement concrete road from Bridge towards Sajanpur ICDS at Badalpur Sansad under Bolla Gram Panchayat in P.S.Balurghat, Dakshin Dinajpur during 2019-2020. (AAP No. 22, 2019-20,14th FC fund)
3532 Covering of Open Balcony Work for Construction of Urban Homeless Shelter (SUH) at Central Bus Stand under NULM, Midnapore Municipality
3533 CONSTRUCTION OF UNDER GROUND SEWER AT KEDAR CHATTERJEE SLUM AREA IN WARD NO 119.
TRN : 836435 |  Kolkata - West Bengal
Contract Value : 36.56 Lacs | Agency Name : Kolkata Municipal Corporation
Tender award for construction of under ground sewer at kedar chatterjee slum area in ward no 119.
3534 Oiling and greasing for sluice gates of different Sluices (Sluice no-1,2,3,4,5 and Berigopalpur) at Bongaon and Berigopalpur at Bidyadhari Drainage sub Division of Bidyadhari Drainage Division during 2020-21
3535 Cutting and removing of grass and jungles etc. from the compound of Banipur Rest Shed along with the different category of works at Bidyadhari Drainage sub Division, Bongaon of Bidyadhari Drainage Division, Dist:-North 24 Parganas during 2020-21
3536 Jungle cutting , Pond cleaning, clearing of internal drain and cleaning of office floor inside Bidyadhari Drainage Division Colony Campus at Barasat, Taki Road, North24 PGS. under Bidyadhari Drainage Division, period from May 2020 to December 2020
3537 Clearing and removing of water hyacinth under Annual Maintenance Contract for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of Nagla Khal from ch. 0.00 km. to 6.00 km. Within Block Habra-I & P.S.-Habra ,Dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
3538 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Jassore road jora bridge 30.28 km.to Haldar Para 34.25 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division
3539 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) including thick and thorny jungles of koral khal from ch. 2.70 km. To 7.70 km. Within Block Habra-I & P.S.-Habra in the dist.-North24 Parganas of Jamuna Basin Drainage Sub Division under Bidyadhari Drainage Division.
3540 Clearing and removing of water hyacinth under AMC for a period of 08 months(from May’2020 to December’2020 ) from Rautara Bridge 25.63 km Sohai-Swetpur road to near jassore road jora bridge 30.23 km. Over river Nonagong at Block- Habra I & II under Bidyadhari Drainage Division.

Get West Bengal Awarded Tender Alert...

354995

Advertisment
Advertisment