Latest and live tenders published in all country. Click on any tender to view further details.
the south african national roads agency soc limited sanral invites tenders for nra n.002-2016/3f-ss1 geotechnical drilling services for the n2 wild coast toll highway, section 19 to 21, between ndwalane km 75.60 and the mtamvuna river km 32.80. this project is in the eastern cape province in the district municipality of port st johns. the approximate duration is 9 months.
the south african national roads agency soc limited sanral invites tenders for nra r.063-160-2016/1d-ss – geotechnical core drilling services for upgrading of national route r63 section 16 between n6 bridge km 01.00 and n2 past komga km 43.64. this project is in the province of the eastern cape and in the district municipality of amathole. the approximate duration is 80 working days using 6 rigs
the south african national roads agency soc limited sanral invites tenders for special maintenance of national route r75 section 4 from jansenville to r63 intersection: phase 1 km -0.4 to km 35 and km 51 to km 59.1. this project is in the province of eastern cape and in the district municipality of sarah baartman. the approximate construction duration is 10 months.
the resurfacing of national route r61 section 2 from n9 intersection km 0.0 to wapasberg km 13.0. this project is in the province of the eastern cape, in the district municipality of sarah baartman and in the local municipality of dr beyers naude. the approximate duration is five 5 months
the provision of consulting engineering services for the preliminary and detailed design for the eastern portion of the bloemfontein outer ring road between n8 intersection with maselspoort road and the intersection of the p77/1 with the n6.this project is in the province of the free state and in the local municipality of mangaung and district municipality of xhariep. the approximate programme is for design and construction documentation to be completed by june 2019. preferences are offered to tenderers who comply with the criteria
consulting engineering services for the periodic maintenance of national route 5 from section 1 vaalpennspruit km 31.0 to section 2 senekal km 4.4. this project is in the province of the free state and in the district municipality of thabo mofutsanyana and the approximate programme is for design and construction documentation to be completed by march 2018, followed by supervision of two eight month contracts commencing august 2018.
consulting engineering services for the preliminary and detailed design for the eastern portion of the bloemfontein outer ring road between n8 intersection with maselspoort road and the intersection of the p77/1 with the n6.this project is in the province of the free state and in the local municipality of mangaung and district municipality of xhariep. the approximate programme is for design and construction documentation to be completed by june 2019
appointment of a service provider for the provision of ad-hoc structural and drainage consulting engineering and supervision services for the eastern region. services envisaged under this appointment will be on an as-needed basis and relates to, but is not limited to, preventative services, repair/rehabilitation services, capacity improvement services, emergency/urgent services, inspection services and assessment services for all types of structures on the national road network within the provincial areas of kwazulu-natal and free state. the duration of the appointment will be for 5 years
engineering services for the assessment and conceptual design of access roads on national route r22. this project is in the province of kwazulu natal and in the district municipality of umkhanyakude district municipality and the approximate programme is for the assessment and conceptual design
consulting engineering services for the periodic maintenance on national route 2 section 26 from umhlanga km 1.60 to mhloti km 13.70. this project is in the province of kwazulu natal and in the municipality of ethekwini and the approximate programme is for design and construction documentation to be completed by june 2018, followed by supervision of 20 months, commencing november 2018.