Latest and live tenders published in south africa. Click on any tender to view further details.
water and sanitation programme phase 3 at bantubaningi p school/ ceza p school ceza cidb grading: 6gb or higher contract period: 12 calendar months. sale of documents strictly from 26 august 2019 till 03 september 2019 at 16pm. any late payments made after this will not be considered and non-refundable. contractors who want to obtain bid document on site must make reservations with sindi. mbatha@kznworks.gov.za by 03 september 2019 at 16pm 80/20 principle is applicable for this bid
water and sanitation programme phase 3 at masihlangane senior ps, bhanganomo ps, senzokuhle js school nongoma cidb grading: 6gb or higher contract period: 12 calendar months. sale of documents strictly from 26 august 2019 till 03 september 2019 at 16pm. any late payments made after this will not be considered and nonrefundable.
water and sanitation programme phase 3 at masokeneni ps/ ngwabi jp/ siyaphakama hs cluster 6 nongoma cidb grading: 6gb or higher contract period: 12 calendar months. sale of documents strictly from 26 august 2019 till 03 september 2019 at 16pm. any late payments made after this will not be considered and non-refundable. contractors who want to obtain bid document on site must make reservations with sindi. mbatha@kznworks.gov.za by 03 september 2019 at 16pm 80/20 principle is applicable for this bid
construction of inkululeko regeneration programme: ndumo youth centre cidb grading: 6gb or higher contract period: 10 calendar months. sale of documents strictly from 23 august 2019 till 30 august 2019 at 16pm. any late payments made after this will not be considered and non-refundable. contractors who want to obtain bid document on site must make reservations with sindi.mbatha@ kznworks.gov.za by 30 august 2019 at 16pm 80/20 principle is applicable for this bid
water and sanitation programme phase 3 at mgwazeni secondary high school mtubatuba cidb grading: 5gb or higher contract period: 12 calendar months. sale of documents strictly from 26 august 2019 till 03 september 2019 at 16pm. any late payments made after this will not be considered and non-refundable. contractors who want to obtain bid document on site must make reservations with sindi. mbatha@kznworks.gov.za by 03 september 2019 at 16pm 80/20 principle is applicable for this bid
water and sanitation programme phase 3 at nyalazi junior primary & ndimande high school mtubatuba cidb grading: 6gb or higher contract period: 12 calendar months. sale of documents strictly from 26 august 2019 till 03 september 2019 at 16pm. any late payments made after this will not be considered and non-refundable. contractors who want to obtain bid document on site must make reservations with sindi. mbatha@kznworks.gov.za by 03 september 2019 at 16pm 80/20 principle is applicable for this bid
emergency repairs and renovations. the bid will be evaluated in terms of the 80/20 scoring system. cidb contractor grading designation of 3gb or higher. potentially emergency enterprise 2gb pe or higher. compliance with pre -qualification criteria: only b-bbee status levels 1 tenderers are invited. only tenderers that meet stipulated minimum threshold for local production and content will be considered.
construction of police station and demolishing of existing structures. the bid will be evaluated in terms of the 90/10 scoring system. cidb contractor grading designation of 8gb. the tenderers must subcontract a minimum of 30% of the value of contract to : eme’s or qse’s which is at least 51% owned by black people. functionality criteria: experience on previous contracts - 30; reference from clients/consultants - 20; financial capacity - 30; competence of key person- 20 minimum functionality score to qualify for further evaluation: 50 only tenderers that meet stipulated minimum threshold for local production and content will be considered.
appointment of a construction service provider sp to undertake the maintenance and repairs of existing hydroponic tunnels for a period of 8 months 3ce/3me/3eb or higher
supply and installation of 29 x 20kl elevated steel water tanks – ethekwini district